Supplement Information to Request RR-89-61 Revision 2, Alternative Repair and Mitigation Requirements for Structural Weld Overlays
ML092890626
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/09/2009
From: Jordan A
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-376A, FOIA/PA-2011-0115
Download: ML092890626 (2)


Text

Do~ minion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 OCT 0.9 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.

NSSL/RWM Docket No.

License No.

09-376A RO 50-336 DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 SUPPLEMENT TO REQUEST RR-89-61 REVISION 2, ALTERNATIVE REPAIR AND MITIGATION REQUIREMENTS FOR STRUCTURAL WELD OVERLAYS In a letter dated July 23, 2009, Dominion Nuclear Connecticut, Inc. (DNC) requested U.S.

Nuclear Regulatory Commission (NRC) review and approval of Request RR-89-61, Revision 2, for alternative requirements to apply dissimilar metal structural weld overlays (SWOLs) at Millstone Power Station Unit 2 (MPS2). This letter provides supplemental information to describe the SWOLs already installed during the MPS2 Refueling Outage 18 (2R18) in spring 2008, and those SWOLs which are planned to be installed during 2R19 in fall 2009. Table 1 below also identifies the two SWOLs that were deferred from 2R18 to 2R19 due to considerations of dose, and two previously planned SWOLs that no longer are planned for 2R1 9 because the locations were determined to be inspectable.

TABLE 1: AFFECTED WELDS

SUMMARY

Dissimilar Metal Welds (DMWs)

BPS-C-1001 BSD-C-2001 BSI-C-1001 BSI-C-2001 BSI-C-3000 BSI-C-4000 BCH-C-1001 BCH-C-2001 BPY-C-1001 BPY-C-3000 BPD-C-1001 BPD-C-1017 BPD-C-2001 BPD-C-3000 BPD-C-4000 Adjacent 5RS W*_l1 I nrntinn Nnt*_.*

SS Weld Notes BPS-C-1 003 BSD-C-2003 BSI-C-1003 BSI-C-2003 BSI-C-3002 BSI-C-4002 BCH-C-1003 BCH-C-2003 BPY-C-1003 BPY-C-3002 BPD-C-1003 BPD-C-1019 BPD-C-2003 BPD-C-3002 BPD-C-4002 12-inch Hot Leg Surge Nozzle Loop 1 12-inch Hot Leg Shutdown Cooling Loop 2 12-inch Cold Leg Safety Injection (SI) Loop 1A 12-inch Cold Leg SI Loop 2A 12-inch Cold Leg SI Loop 1B 12-inch Cold Leg SI Loop 2B 2-inch Cold Leg Charging Loop 1A 2-inch Cold Leg Charging Loop 2A 3-inch Cold Leg Spray Line Loop 1A 3-inch Cold Leg Spray Line Loop 1B 2-inch Hot Leg Drain Line Loop 1 2-inch Cold Leg Drain Line Loop 1A 2-inch Cold Leg Drain Line Loop 2A 2-inch Cold Leg Drain Line Loop 1B 2-inch Cold Leg Letdown Line Loop 2B 1

1 2

12,4 2

1 2

2,4 2

32 2

2 3

Notes:

1. These four (4) SWOLs were installed during 2R1 8 using provisions of the Revision 1 to Request RR-89-61.
2. These nine SWOLs are planned for 2R19.
3. The location is inspectable with Code-compliant ultrasonic testing (UT) techniques.

Consequently, this SWOL is no longer planned.

4. As-Low-As-Reasonably-Achievable dose considerations prompted DNC to modify the schedule plans for these two SWOLs from 2R1 8 to 2R1 9.

Abi I.,,

Q

Serial No. 09-376A Docket No. 50-336 Supplement to Request RR-89-61 Revision 2 Page 2 of 2 Should you have any questions about the information provided or require additional information, please contact Mr. William D. Bartron at (860) 444-4301.

Sincerely, A. J. Jordan Site Vice President - Millstone Commitments made by this letter: None cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ms. C. Sanders Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 B3 Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station