ML092890142
| ML092890142 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/09/2009 |
| From: | Hansell S Operations Branch I |
| To: | Jane Spence Dominion Nuclear Connecticut |
| Hansell S | |
| Shared Package | |
| ML083020478 | List: |
| References | |
| TAC U01758, FOIA/PA-2011-0115 | |
| Download: ML092890142 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 October 9, 2009 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385
Subject:
NRC Operator Licensing Initial Exam Results Millstone Nuclear Power Station, Unit No. 3 (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Spence:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on September 22, 2009, and the walk-through (overall) and/or simulator operating tests administered September 14-18, 2009 at your facility.
This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, twelve individuals who took the examination passed.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety
Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Power Station, Units 2 & 3 Rope Ferry Road, Route 156 Waterford, CT 06385
Subject:
NRC Operator Licensing Initial Exam Results Millstone Nuclear Power Station, Unit No. 3 (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Spence:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on September 22, 2009, and the walk-through (overall) and/or simulator operating tests administered September 14-18, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, twelve individuals who took the examination passed. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials)
ADAMS PKG NO.: ML083020478 ADAMS No.: ML092890142 DOCUMENT NAME: G:\\DRS\\Operations Branch\\SILK\\Exam FY09 MIL3 Sep 09 (U01758)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.
OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB DSilk/DS SLHansell/SLH DATE 10/ 08 /09 10/09 /09 10/ 09 /09 OFFICIAL RECORD COPY
J. T. Spence Docket No.: 050-423 License No.: NPF-49
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. A.J. Jordan, Site Vice President