ML092720522

From kanterella
Jump to navigation Jump to search
Summary of Meeting Between NRC Region III Management and Entergy Nuclear Operations, Inc., Representatives to Discuss Substantive Cross-cutting Issues in the Area of Human Performance for Two Consecutive Assessment Cycles
ML092720522
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/28/2009
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML092720522 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 28, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE SEPTEMBER 24, 2009, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS-CUTTING ISSUE On September 24, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III office in Lisle, Illinois. The meeting was between NRC Region III management and Entergy Nuclear Operations, Inc., representatives to discuss substantive cross-cutting issues in the area of Human Performance for two consecutive assessment cycles. This meeting was requested to discuss the licensees actions to address a repetitive substantive cross-cutting issue in the area of human performance.

The NRC began the meeting with introductions and opening remarks by Steven West, Director, Division of Reactor Projects. This was followed by the licensees presentation with questions by NRC staff. The licensees meeting presentation slides can be found in ADAMS at ML092650709. A list of principal meeting attendees can be found in the attached enclosure.

Three members of the public attended the meeting via teleconference.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects

Enclosure:

As Stated DISTRIBUTION See next page

September 28, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE SEPTEMBER 24, 2009, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS-CUTTING ISSUE On September 24, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III office in Lisle, Illinois. The meeting was between NRC Region III management and Entergy Nuclear Operations, Inc., representatives to discuss substantive cross-cutting issues in the area of Human Performance for two consecutive assessment cycles. This meeting was requested to discuss the licensees actions to address a repetitive substantive cross-cutting issue in the area of human performance.

The NRC began the meeting with introductions and opening remarks by Steven West, Director, Division of Reactor Projects. This was followed by the licensees presentation with questions by NRC staff. The licensees meeting presentation slides can be found in ADAMS at ML092650709. A list of principal meeting attendees can be found in the attached enclosure.

Three members of the public attended the meeting via teleconference.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects

Enclosure:

As Stated DISTRIBUTION See next page DOCUMENT NAME: G:\PALI\Palisades 09-24-09 Public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME FTran:dtp JGiessner DATE 09/28/09 09/28/09 OFFICIAL RECORD COPY

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated September 28, 2009.

SUBJECT:

SUMMARY

OF THE SEPTEMBER 24, 2009, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS-CUTTING ISSUE cc w/encl: Christopher J. Schwarz, Vice President, Operations Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, State Liaison Officer Michigan Department of Environmental Quality Michigan Office of the Attorney General

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated September 28, 2009.

SUBJECT:

SUMMARY

OF THE SEPTEMBER 24, 2009, PUBLIC MEETING TO DISCUSS REPETITIVE SUBSTANTIVE CROSS-CUTTING ISSUE DISTRIBUTION:

Susan Bagley RidsNrrPMPalisades RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

PUBLIC MEETING PRINCIPAL ATTENDEES September 24, 2009 Nuclear Regulatory Commission:

Steven West, Director, Division of Reactor Projects Kenneth OBrien, Deputy Director, Division of Reactor Safety John Giessner, Chief, DRP Branch 4 John Ellegood, Senior Resident Inspector, Palisades Allan Barker, Regional Government Liaison Officer Harral Logaras, Regional Government Liaison Staff Entergy Nuclear Operations, Inc.:

C. Schwarz, Site Vice President T. Kirwin, Plant Manager D. Hamilton, Director, Nuclear Safety Assurance P. Anderson, Licensing Manager J. Miksa, Planning, Scheduling, and Operations Department Other Attendees (teleconference):

J. Gallman, Luminant R. Woods, Platts A. Walter, Michigan Department of Human Services