Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
September 29, 2009
Mr. Mano Nazar
Senior Vice President and
Chief Nuclear Officer
Florida Power & Light Company
P.O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: ST. LUCIE PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000335/2009302 and 05000389/2009302
Dear Mr. Nazar:
In a telephone conversation on September 23, 2009, between Mr. Mark R. Verbeck, Initial
License Training Supervisor and Mr. Richard S. Baldwin, Chief Examiner, arrangements were
made for the administration of licensing examinations at St. Lucie Nuclear Plant. The written
examination is scheduled to be administered the week of December 14, 2009. The operating
test is scheduled to be administered during the weeks of January 4, 2010, and January 11,
2010. The on-site preparatory week is scheduled for the week of December 14, 2009.
As agreed during the telephone conversation, your staff will prepare operating test based on the
guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional
office will discuss with your staff any changes that might be necessary before the examinations
are administered. Your staff has also agreed to make copies of all examination materials that
are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by October 26, 2009. Mr. Baldwin provided a written examination outline to your staff on
April 6, 2009. The operating test and the supporting reference materials identified in
Attachment 3 to ES-201 will be due by November 20, 2009. Pursuant to Title 10, Section
55.40(b)(3), of the Code of Federal Regulations (10CFR55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which was extended past the expiration date of June 30, 2009.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory
Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
3
Thank you for your cooperation in this matter. Mr. Verbeck has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Richard Baldwin at (404) 562-4642, E-mail:
Richard.Baldwin@nrc.gov), or me at (404) 562-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-335, 50-389
(cc w/encl: See Page 4)
3
Thank you for your cooperation in this matter. Mr. Verbeck has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Richard Baldwin at (404) 562-4642, E-mail:
Richard.Baldwin@nrc.gov), or me at (404) 562-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-335, 50-389
(cc w/encl: See Page 4)
X PUBLICLY AVAILABLE
G NON-PUBLICLY AVAILABLE
G SENSITIVE
X NON-SENSITIVE
ADAMS: G Yes
ACCESSION NUMBER:_________________________
X SUNSI REVIEW COMPLETE MTW
OFFICE
RII:DRS
RII:DRS
SIGNATURE
RSB /RA/
MTW /RA/
NAME
RBaldwin
MWidmann
DATE
09/29/2009
09/29/2009
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL
RECORD
COPY DOCUMENT
NAME:
O:\\ST.
LUCIE
EXAMINATIONS\\INITAL
EXAM
2009-
302\\CORRESPONDENCE\\ST LUCIE 2009 302 120 DAY LETTER(DAVIS).DOC
4
cc w/encl:
Gordon L. Johnston
Site Vice President
St. Lucie Nuclear Plant
Electronic Mail Distribution
Robert J. Hughes
Plant General Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Mark Hicks
Operations Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Rajiv S. Kundalkar
Vice President - Fleet Org Support
Nuclear Technical Services
Florida Power & Light Company
Electronic Mail Distribution
Eric Katzman
Licensing Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Abdy Khanpour
Vice President
Engineering Support
Florida Power and Light Company
P.O. Box 14000
Juno Beach, FL 33408-0420
McHenry Cornell
Director
Licensing and Performance Improvement
Florida Power & Light Company
Electronic Mail Distribution
Alison Brown
Nuclear Licensing
Florida Power & Light Company
Electronic Mail Distribution
Mitch S. Ross
Vice President and Associate General
Counsel
Florida Power & Light Company
Electronic Mail Distribution
Marjan Mashhadi
Senior Attorney
Florida Power & Light Company
Electronic Mail Distribution
William A. Passetti
Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Craig Fugate
Director
Division of Emergency Preparedness
Department of Community Affairs
Electronic Mail Distribution
J. Kammel
Radiological Emergency Planning
Administrator
Department of Public Safety
Electronic Mail Distribution
Richard L. Anderson
Vice President
Nuclear Plant Support
Florida Power & Light Company
Electronic Mail Distribution
Faye Outlaw
County Administrator
St. Lucie County
Electronic Mail Distribution
Jack Southard
Director
Public Safety Department
St. Lucie County
Electronic Mail Distribution
Seth Duston
Training Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
5
Letter to Mano Nazar from Malcolm T. Widmann dated September 29, 2009
SUBJECT: ST. LUCIE PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000335/2009302 and 05000389/2009302
Distribution w/encl:
C. Evans, RII
L. Slack, RII
OE Mail
RIDSNRRDIRS
PUBLIC
RidsNrrPMStLucie Resource