ML092680115

From kanterella
Jump to navigation Jump to search
Branch Chief Assignment Letter
ML092680115
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/26/2009
From: Howe A
Division of Operating Reactor Licensing
To: Meyer L
Florida Power & Light Energy Point Beach
Harris T, NRR/DORL/LPL3-1, 301-415-1379
References
Download: ML092680115 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 October 26, 2009 Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 SUB..IECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - BRANCH CHIEF ASSIGNMENT

Dear Mr. Meyer:

This letter is to inform you that effective October 11, 2009, Mr. Robert J. Pascarelli was assigned as the U.S. Nuclear Regulatory Commission's Branch Chief for Point Beach Nuclear Plant, Units 1 and 2. Mr. Pascarelli assumes all licensing oversight and supervisory duties previously held by Ms. Lois James. Mr. Pascarelli may be reached at 301-415-6603 or via e-mail at Robert.pascarelli@nrc.gov.

Sincerely, aee<<.~a JL--<

Allen G. Howe, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: Distribution via ListServ

ML092680115 OFFICE NRR/LPL3-lIPM NRR/LPL3-1/LA NRRlLPL3-lIBC NRRIDORLIDD NAME JPoole THarris RPascarelli AHowe DATE 10/01/09 09/29/09 10/22/09 10/26/09