Draft - RAI Questions from the Electrical Engineering Branch Regarding the Alternate Source Term - Round 2
ML092640514
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/21/2009
From: Justin Poole
Plant Licensing Branch III
To: Jim Costedio, Hale S
Point Beach
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
Download: ML092640514 (1)


Text

From:

Poole, Justin Sent:

Monday, September 21, 2009 2:10 PM To:

'Hale, Steve'; COSTEDIO, JAMES

Subject:

Draft - RAI Questions from the Electrical Engineering regarding the Alternate Source Term Round 2

Steve, By letter dated December 8, 2008, FPL Energy Point Beach, LLC, submitted a license amendment application for Point Beach Nuclear Plant Units 1 and 2 to revise the current licensing basis to implement the alternate source term through reanalysis of the radiological consequences of the FSAR Chapter 14 accidents.

The Electrical Engineering Branch has reviewed the information provided and determined that in order to complete its evaluation, additional information is required. We would like to discuss the questions, in draft form below, with you in a conference call.

This e-mail aims solely to prepare you and others for the proposed conference call. It does not convey a formal NRC staff position, and it does not formally request for additional information.

Justin C. Poole Project Manager NRR/DORL/LPL3-1 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DRAFT

1. Provide additional details describing the testing of the EDGs to ensure the EDGs are capable to handle the AST loading, as provided in the response to RAI #1 (Sept 4, 2009 letter).
2. For the components listed in response to RAI#6, are these existing cables, motors, and motor terminations?

DRAFT