UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 18, 2009 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

RESCHEDULING OF PERRY NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS INSPECTION

Dear Mr. Bezilla:

In a telephone conversation on September 11, 2009, between Ms. Regina Russell, Emergency Preparedness Inspector and Mr. Larry Vanderhorst, Emergency Preparedness Senior Specialist of your staff, arrangements were made for the rescheduling of the Emergency Preparedness Biennial Program Inspection at the Perry Nuclear Power Plant. The inspection was rescheduled to a mutually agreeable time due to workload demands and availability of staff for both your Emergency Preparedness Organization and the RIII Emergency Preparedness Branch. The inspection was rescheduled from the week of September 21, 2009 to the week of November 2, 2009.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page

Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

RESCHEDULING OF PERRY NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS INSPECTION

Dear Mr. Bezilla:

In a telephone conversation on September 11, 2009, between Ms. Regina Russell, Emergency Preparedness Inspector and Mr. Larry Vanderhorst, Emergency Preparedness Senior Specialist of your staff, arrangements were made for the rescheduling of the Emergency Preparedness Biennial Program Inspection at the Perry Nuclear Power Plant. The inspection was rescheduled to a mutually agreeable time due to workload demands and availability of staff for both your Emergency Preparedness Organization and the RIII Emergency Preparedness Branch. The inspection was rescheduled from the week of September 21, 2009 to the week of November 2, 2009.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page DOCUMENT NAME: G:\\DRS\\Work in Progress\\PER 091809 DRS OL Reschedule Insp.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RRussell HPeterson DATE 09/18/09 09/18/09 OFFICIAL RECORD COPY

Letter to Mark Bezilla from Hironori Peterson dated September 18, 2009.

SUBJECT:

RESCHEDULING OF PERRY NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS INSPECTION cc:

J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC K. Fili, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Ohio Department of Health R. Smith, Emergency Preparedness Manager

Letter to Mark Bezilla from Hironori Peterson dated September 18, 2009.

SUBJECT:

RESCHEDULING OF PERRY NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS INSPECTION cc:

J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC K. Fili, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio C. OClaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Ohio Department of Health R. Smith, Emergency Preparedness Manager DISTRIBUTION:

Susan Bagley RidsNrrPMPerry RidsNrrDorlLpI3-2 RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak