ML092460662
| ML092460662 | |
| Person / Time | |
|---|---|
| Issue date: | 09/03/2009 |
| From: | Annette Vietti-Cook NRC/SECY |
| To: | Pietrangelo A Nuclear Energy Institute |
| References | |
| Download: ML092460662 (2) | |
Text
September 3, 2009 Anthony Pietrangelo Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute 1776 I St. N.W., Suite 400 Washington, DC 20006
Dear Mr. Pietrangelo:
The Nuclear Regulatory Commission (NRC) is pleased that you and an executive from the New Plant Working Group (NPWG) will participate in a public Commission meeting on progress in resolving issues associated with inspections, tests, analysis, and acceptance criteria (ITAAC) closure scheduled on Tuesday, September 22, 2009, at 9:30 a.m. Please let us know who the executive will be as soon as possible. The meeting will be held in the Commissioners Conference Room on the first floor of the NRCs Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing the industrys views on ITAAC closure. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda.
To assist the Commission in preparing for the meeting, please e-mail any written material, including viewgraphs/slides, to Ms. Rochelle Bavol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by September 15, 2009, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for viewgraphs, if you choose to use them (enclosure 2).
PowerPoint or other electronic presentation formats are acceptable. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use viewgraphs they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Bavol at 301-415-1651.
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan 15 minutes for a combined presentation by you and a representative of the NPWG, discussing the important points on which you wish to focus the Commissions attention.
Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk.
2 Sincerely,
/RA/
Annette L. Vietti-Cook Secretary of the Commission
Enclosures:
- 1. Draft Agenda
- 2. Briefing Visuals Guidance