September 3, 2009 Mr. Scott P. Murray, Manager Licensing and Liabilities COE Global Nuclear Fuel - Americas, LLC Castle Hayne Road Wilmington, NC 28401
SUBJECT:
APPROVAL OF ANNUAL FINANCIAL TEST UPDATE FOR DECOMMISSIONING FINANCIAL ASSURANCE (TAC NO. L32829)
Dear Mr. Murray:
This refers to the Annual Financial Test Update and affidavit transmitted by letter from Keith S.
Sherin, General Electric (GE) Vice Chairman and Chief Financial Officer, dated March 19, 2009, for the Global Nuclear Fuel - Americas, Reuter Stokes, Vallecitos Nuclear Center, and Morris facilities.
The reviewers determined that the financial test performed by GE demonstrated continued qualification to use a parent company guarantee as financial assurance for decommissioning costs. This was determined to be acceptable.
TAC L32829 is considered closed.
If you have any questions regarding this matter, I can be reached at (301) 492-3128 or by e-mail at Merritt.Baker@nrc.gov.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the U.S. Nuclear Regulatory Commissions (NRCs) Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The financial assurance information will not be available to the public.
Sincerely,
/RA/
Merritt N. Baker, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Docket No.: 70-1113 License No.: SNM-1097
Mr. Scott P. Murray, Manager Licensing and Liabilities COE Global Nuclear Fuel - Americas, LLC Castle Hayne Road Wilmington, NC 28401
SUBJECT:
APPROVAL OF ANNUAL FINANCIAL TEST UPDATE FOR DECOMMISSIONING FINANCIAL ASSURANCE (TAC NO. L32829)
Dear Mr. Murray:
This refers to the Annual Financial Test Update and affidavit transmitted by letter from Keith S. Sherin, General Electric (GE) Vice Chairman and Chief Financial Officer, dated March 19, 2009, for the Global Nuclear Fuel -
Americas, Reuter Stokes, Vallecitos Nuclear Center, and Morris facilities.
The reviewers determined that the financial test performed by GE demonstrated continued qualification to use a parent company guarantee as financial assurance for decommissioning costs. This was determined to be acceptable.
TAC L32829 is considered closed.
If you have any questions regarding this matter, I can be reached at (301) 492-3128 or by e-mail at Merritt.Baker@nrc.gov.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the U.S. Nuclear Regulatory Commissions (NRCs) Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The financial assurance information will not be available to the public.