MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML22201A1012022-07-18018 July 2022 Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply ML21271A2342021-09-23023 September 2021 EN 55282 (Updated) - Framatome Part 21 Reportable Defect - Vacuum Breakers ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19261A1942019-09-0606 September 2019 Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17199F8902017-07-11011 July 2017 Flowserve 10 CFR Part 21 Update - Stem-Wedge Separation of an Anchor/Darling Double Disc Gate Valve at LaSalle County Station, Unit 2 ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15259A5252015-09-16016 September 2015 Part 21 Report - Potentially Affected Coils Used in Freedom Size 1 and Size 2 Starters and Contactors ML15259A5242015-09-15015 September 2015 Westinghouse Electric Co. - Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML15077A3792015-03-13013 March 2015 Notifications of Potential Part 21 Re Weir Valves & Controls USA, Inc., - Improper Weld Used on Gate Valve Cover ML14303A2582014-10-27027 October 2014 10 CFR Part 21 Notification of an Error in Powerplex MCPR and LHGR Limit Input for Browns Ferry, Unit 2 ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12292A1972012-10-0505 October 2012 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0106, Rev. 0 ML12283A2442012-10-0505 October 2012 Part 21 - Temperature Switch Potentially Shipped Without Set Screw ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12258A3992012-09-10010 September 2012 Potential Part 21 Issue Related to Tyco Timing Relay ML12219A3042012-08-0202 August 2012 Potential Part 21 Issue Related to Tyco Timing Replay ML1219103332012-07-0707 July 2012 ATC Nuclear, Part 21 Notification Concerning Moore Process Controllers ML1219103372012-07-0202 July 2012 Update 10 CFR Part 21 Notification of Defective Moore 535 Controllers ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11284A0172011-10-0606 October 2011 10 CFR Part 21 Notification of Defective Moore 535 Controllers ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance 2024-09-06
[Table view] |
Text
'i - ';
AREVA A
August 27, 2009 NRC:09:092 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 10 CFR Part 21 Notification of an Error in LaSalle Units I & 2 Power Dependent MCPR and LHGR Operating Limits Calculation Due to High Measured Liftoff This letter provides notification of a reportable defect in accordance with 10 CFR Part 21. This situation was reported to the NRC Operations Center by facsimile on July 29, 2009.
The defect is in the calculation of power dependent core Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) operating limits used for ATRIUM-10 fuel.
Specifically, the defect is in the assumption that total liftoff (crud + oxide) on the LaSalle Fuel would be consistent with prior AREVA experience. The LaSalle fuel has been subject to operation with zinc levels that exceeded EPRI Guidelines for reactor water chemistry and resulted in higher than expected measured liftoff.
The affected utility has been informed and the planned actions and actions already taken to address the issue are provided in the attachment to this letter.
If you have any questions related to this submittal, please contact Mr. Alan B. Meginnis, Product Licensing Manager. He may be reached by telephone at 509-554-4584 or by e-mail at Alan. Meqinnis(aareva.com.
Sincerely, Ronnie L. Gardner, ~a~nager Corporate Regulatory Affairs AREVA NP Inc.
Enclosure cc: H.D. Cruz Project 728 E
AREVA NP INC. ------
An AREVA and Siemens company I- _" I 3315 Old Forest Road, P.O. Box 10935, Lynchburg, VA 24506-0935 Tel.: 434 832 3000 - Fax: 434 832 3840 - www.areva.com
Document Control Desk NRC:09:092 August 27, 2009 Page A-1 Attachment 1 Reportable Defect (i) Name and addressof the individual informing the Commission.
Alan B. Meginnis, AREVA NP Inc., 2101 Horn Rapids Road, Richland, WA 99354 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
The power dependent MCPR and LHGR operating limits used to monitor LaSalle Units 1 and 2.
(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
AREVA NP Inc.
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such a defect or failure to comply.
Measurements obtained during poolside exams at the two LaSalle units show high total liftoff on fuel rod surfaces. Liftoff is the sum of the thicknesses of the zirconium oxide corrosion film and coolant system deposits (crud), and is typically measured using eddy current and/or profilometry techniques. Typical past and recent BWR measurements of oxide at other plants have been low - with maximum values of less than 60 pm and with low amounts of crud. Based on the use of profilometry, measurements on ATRIUM-10 fuel at the LaSalle units are as high as 93 pm. AREVA's fuel rod thermal-mechanical methodology requires an explicit account for the maximum amount of oxidation along with an additional consideration for the effect of crud. The fuel rod analyses for the LaSalle fuel do not sufficiently account for the high liftoff measurements since it was assumed that the oxidation and crud would be consistent with prior AREVA experience.
In addition, the AREVA thermal-hydraulics analyses for the LaSalle units did not account for the higher liftoff. The greater than expected liftoff present on LaSalle fuel has been attributed to operation with zinc levels that exceeded EPRI guidelines for reactor water chemistry.
(v) The date on which the information of such a defect or failure to comply was obtained.
The issue was determined to be a deviation on February 16, 2009.
(vi) In the case of a basic component which fails to comply, the number and the location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulationsin this part.
LaSalle Units 1 and 2.
Document Control Desk NRC:09:092 August 27, 2009 Page A-2 Data from other plants currently operating with fuel licensed using AREVA methods indicate that the liftoff is low and within historical levels. Recent higher than expected liftoff measurements at Columbia Generating Station were evaluated by AREVA in a separate Condition Report (CR) and concluded that the condition was not a defect.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organizationresponsible for this action; and the length of time that has been or will be taken to complete the action.
Following the discovery of the deviation, AREVA supplied an operability assessment to Exelon that identified limitations on the operating limit MCPR and rod average exposure.
These limitations also were provided to the NRC as part of an Interim Report (Letter, R.
L. Garner (AREVA NP Inc.) to Document Control Desk (NRC), "Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21 (a)(2)," April 16, 2009).
Revised operating limits were provided to Exelon based on liftoff values that are lower than used in the original operability assessments.
Responsible organization: AREVA NP Inc.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasersor licensees.
Actions have been identified in the AREVA corrective action program to assure that AREVA obtains information from the licensees on the anticipated water chemistry environment to be implemented for the next operating cycle, in advance of AREVA core design efforts supporting that cycle. This will assure that AREVA can adequately project the impact of this chemistry environment on liftoff, and to account for it during the design activities.