UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 31, 2009 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Power Plant, Unit 2 SUB..IECT:
SUMMARY
OF AUGUST 6,2009, MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING WAITS BAR UNIT 2 CONSTRUCTION REFURBISHMENT PROGRAM On August 6,2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of TVA at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Watts Bar Nuclear Plant (WBN) Unit 2 construction refurbishment program information submitted by letter dated July 8, 2009.
The licensee presented information (ADAMS Accession No. ML092310466) that described the WBN Unit 2 Material Condition, Refurbishment Program, Refurbishment Program Implementation, and Testing Program.
The staff queried the licensee on specific issues related to the July 8, 2009, letter and the licensee's presentation. A summary of the questions and comments discussed is contained in enclosure 2.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
d'-}3d:!'!:.;or Project Manager atts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
List of Attendees Summary of Questions and Comments cc w/encls: Distribution via Listserv
LIST OF ATTENDEES AUGUST 6,2009, MEETING WITH TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 CONSTRUCTION REFURBISHMENT PROGRAM Nuclear Regulatory Commission
Participants:
L. Raghavan Greg Casto Patrick Milano Joel Wiebe Edward Smith Dan Hoang Sam Miranda Emma Wong John Billesbeck Farhad Farzam James Isom Keith Hoffman Steve Tingen Harold Walker George Thomas Position/Title Chief Chief Sr. Project Manager Sr. Project Manager Reactor Systems Engineer Structural Engineer Reactor Systems Engineer Chemical Engineer Organization Watts Bar Special Projects Branch (WBPB)
Balance of Plant Branch (SBPB)
WBPBIDORL WBPB/DORL SBPBIDE Mechanical and Civil Engineering Branch (EMCB)/DE Reactor Systems Branch {SRXB)IDSS Steam Generator Tube Integrity and Chemical Engineering Branch (CSGB)IDCI Reactor Operations Engineer Reactor Inspections Branch (IRIB)IDIRS Sr. Structural Engineer Sr. Reactor Operations Engineer Materials Engineer Engineer Sr. Reactor Systems Engineer Structural Engineer Matthew McConnell Electrical Engineer Tennessee Valley Authority (TVA)
Participants:
Gordon Arent Licensing Manager Bill Crouch Engineering Manager Jerry Schlessel Construction Manager EMCBIDE IRIBIDIRS Component Performance and Testing Branch (CPNB)/DCI CPTBIDCI Containment and Ventilation Branch
{SCVB)IDSS EMCB/DE Electrical Engineering Branch {EEEB)IDE TVA TVA TVA
SUMMARY
OF QUESTIONS AND COMMENTS AUGUST 6,2009, MEETING WITH TENNESSEE VALLEY AUTHORITY WADS BAR NUCLEAR PLANT, UNIT 2 CONSTRUCTION REFURBISHMENT PROGRAM During the meeting presentation by Tennessee Valley Authority (TVA), the Nuclear Regulatory Commission staff asked a number of questions to obtain further clarification of the overall program plan and the method of implementation. In addition, the NRC staff had certain comments regarding some of the details presented. The folloWing is a summary of the questions and comments:
- 1.
Describe how TVA will be establishing the qualified life for each type of component in its plan.
- 2.
For Watts Bar Nuclear (WBN) Unit 2, what is the edition (year) used for the code of record of the American Concrete Institute (ACI) Code and American Institute of Steel Construction (AISC) Code?
- 3.
TVA's Master Equipment List (MEL) does not include all components. Describe the process to update the MEL and reconcile the final MEL prior to system turnover for startup testing. In addition, how will subcomponents inside panels or other devices be addressed?
- 4.
Spring-can type pipe supports have been considered as passive components. What will the program require for refurbishment of them to ensure that the springs have not been damaged (spring constant changed) due to being in a loaded configuration for a number of years? For example, spring cans locked or pinned since construction.
- 5.
Describe how masonry-block walls will be addressed in the program.
- 6.
For each component commodity or attribute listed in Attachment 3 to the program plan, discuss how the specific acceptance criteria will be prOVided to the inspection personnel.
Describe the specific acceptance criteria that will be used for the evaluations.
- 7.
For instrumentation subcomponents that will not be replaced (e.g., resistance temperature detectors, thermocouple probes, etc.), describe how TVA plans to verify their acceptability. During its review of the program plan, the staff may need to review selected TVA procedures for instrumentation.
- 8.
Discuss the qualification requirements for Engineering or other field personnel who would be performing the inspections and/or evaluations.
- 9.
Were any of the safety-related structures at WBN Unit 2 supported by steel piles? If so, how are these piles being inspected or evaluated? Similarly, confirm the methods for inspecting subsurface foundations for structures.
- 2
- 10.
Describe the source criteria that will be used during the refurbishment of relief valves.
- 11.
How will be disk to valve seat coefficient of friction be assessed for air-operated valves?
- 12.
Is a summary of the test data for the concrete in structures available? Summarize the results of the closure report for the Concrete Issues Corrective Action Program Plan.
Describe the monitoring and management of potential corrosion of embedded steel and degradation of concrete. Is the groundwater tested for non-aggressive elements in order to understand how ground-water intrusion impacts concrete and reinforcing steel.
- 13.
For the WBN Unit 2 equipment that is already in service to support Unit 1, discuss the manner in which TVA will determine that the equipment meets the design and licensing conditions related to the qualified life at Unit 2.
- 14.
Describe the scope of the pre-service inspection of the containment liner and associated containment penetrations, bellows, and coatings.
- 15.
Does TVA have a program to monitor the differential settlement of structures at Unit 2?
- 16.
In reference to the information on page 20 of the plan, state the reasons for not replacing all elastomer or other seals such as ice condenser inlet door seals. What will be done to evaluate these seals?
- 17.
Describe TVA's plans for oversight and auditing of the implementation of the program and the accomplishment of program objectives.
- 18.
If there will be procurement of equipment and parts from suppliers not possessing programs and qualifications under Title 10, Code of Federal Regulations, Part 50, Appendix B, how will the commercial grade dedication be accomplished?
- 19.
What is being done to evaluate the load-carrying requirements for anchor bolts?
- 20.
Provide the schedule for completion of procedures for refurbishment, inspection, and engineering evaluations under the program plan. The staff will use the schedule and listing to determine if it will audit selected procedures.
Meeting Summary to Tennessee Valley Authority from Joel S. Wiebe dated DISTRIBUTION:
PUBLIC RidsNrrPMWattsBar2 Resource ESmith NRR SJones NRR RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCTR Resource PMilano NRR SMiranda NRR FFarzam NRR STingen NRR MMcConnell NRR LPWB Reading File RidsNrrLABClayton SGardocki NRR JPurciarello NRR CTucci NRR EDavidson NRR JWiebe NRR EWong NRR
,/lsom NRR HWalker NRR RidsNrrDorlLp_WB RidsNrrDeSbpb GCasto NRR ResourceRidsOgcRp Resource DDiaz-Toro, EDO GArmstrong NRR DHoang NRR
,IBillesbeck NRR KHoffman NRR GThomas NRR
August 31, 2009 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Power Plant, Unit 2
SUBJECT:
SUMMARY
OF AUGUST 6,2009, MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING WATTS BAR UNIT 2 CONSTRUCTION REFURBISHMENT PROGRAM On August 6, 2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of TVA at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Watts Bar Nuclear Plant (WBN) Unit 2 construction refurbishment program information submitted by letter dated July 8, 2009.
The licensee presented information (ADAMS Accession No. ML092310466) that described the WBN Unit 2 Material Condition, Refurbishment Program, Refurbishment Program Implementation, and Testing Programs.
The staff queried the licensee on specific issues related to the July 8, 2009, letter and the licensee's presentation. A summary of the questions and comments discussed is contained in enclosure 2.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
IRAI Joel S. 'v\\/iebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-391
Enclosures:
List of Attendees Summary of Questions and Comments cc w/encls: Distribution via Listserv DISTRIBUTION: See Next Page ADAMSAccession No. PKG ML092310428 MeetIng Summary ML092380145 M r N r ML092080363 eeln ~
olce H
d t ML092310466 an ou s Office DORLILP-WB/PM DORLILP-WB/LA DORLILP-WB/BC DORLILP-WB/PM Name JWiebe BClayton LRaghavan JWiebe Date 08/27/09 08/27/09 08/31/09 08/31/09
---l OFFICIAL RECORD COpy