ML092370643
| ML092370643 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/24/2009 |
| From: | Hartz L Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 09-114A | |
| Download: ML092370643 (2) | |
Text
10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 24, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 WITHDRAWAL OF RELIEF REQUEST CMP-24 Serial No.
09-114A NL&OS/ETS RO Docket Nos. 50-338/339 License Nos. NPF-4/7 In a February 18, 2009 letter (Serial No.09-114), Dominion requested approval of Relief Requests CMP-24 and CMP-25 for North Anna Units 1 and 2, respectively. The relief requests proposed an alternative to volumetric examination requirements of American Society of Mechanical Engineers (ASME) Code,Section XI, Table IWB-2500-1, Category B-F, Item B5.1 0, Reactor Vessel Nozzle to Safe-End Butt Welds for the remainder of the third inservice interval.
As noted in our February 18, 2009 letter, Dominion was scheduled to perform the reactor vessel nozzle to safe-end butt weld inspections during spring 2009 refueling outage for North Anna Unit 1. Although there was no expectation that an identifiable indication existed which would require depth sizing during the examinations, Dominion submitted the subject relief requests as a proactive contingency.
Dominion successfully completed the Unit 1 reactor vessel nozzle to safe-end butt weld inspections during the spring 2009 refueling outage.
Therefore, Dominion is withdrawing CMP-24.
However, Dominion continues to request approval of relief request CMP-25 by December 31, 2009 for Unit 2.
If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.
Sincerely,
. --~~
/).
./l
,->f)//llrr-Leslie N. Hartz Vice President - Nuclear Support Services Commitments made in this letter: None
cc:
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 8 G9A 11555 Rockville Pike Rockville, Maryland 20852 Ms. K. R.Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, Maryland 20852 Serial No. 09-114A Docket Nos. 50-338/339 Withdrawal of Relief Request CMP-24 Page 2 of 2