NRC Operator Licensing Initial Exam Results, Three Mile Island Nuclear Power Station, Unit 1 (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML092330918
Person / Time
Site: Crane 
Issue date: 08/18/2009
From: Hansell S
Operations Branch I
To: Wend C
Exelon Nuclear
Hansell S
Shared Package
ML082950624 List:
References
TAC U01760
Download: ML092330918 (3)


Text

August 18, 2009 Mr. Chris Wend Director, Training Exelon Nuclear Three Mile Island Nuclear Station, Unit 1 TMI Training Center, Route 411 South P. O. Box 480 Middletown, PA 17057

Subject:

NRC Operator Licensing Initial Exam Results Three Mile Island Nuclear Power Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Wend:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on July 15, 2009, and the walk-through (overall) and/or simulator operating tests administered July 6 - 10, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, ten individuals were administered the examination and eight passed.

However, we will not be issuing licenses for one of the applicant who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 (74 for SRO-only) percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.

contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

is a copy of the licenses.

Mr.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-289 License No. DPR-50

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. William Noll Vice President TMI, Unit 1 Exelon Nuclear Three Mile Island, Unit 1 Route 441 South P.O. Box 480 Middletown, PA 17057

Mr.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-289 License No. DPR-50

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. William Noll Vice President TMI, Unit 1 Exelon Nuclear Three Mile Island, Unit 1 Route 441 South P.O. Box 480 Middletown, PA 17057 Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials)

ADAMS PKG NO.: ML082950624 ADAMS NO.: ML092330918 DOCUMENT NAME: G:\\DRS\\Operations Branch\\CARUSO\\Exam 09-TMI Jul 09 (U01760)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JGCaruso/JGC SLHansell/SLH DATE 08/18/09 08/ 17/9 08/18/09 OFFICIAL RECORD COPY