Response to RIS 2009-11, Preparation and Scheduling of Operator License Examinations
ML092300085
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/12/2009
From: Geckle M
Constellation Energy Group, Nuclear Generation Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011
Download: ML092300085 (2)


Text

Mark Geckle R.E. Ginna Nuclear Power Plant, LLC Manager, Nuclear Training Department 1503 Lake Road Ontario, New York 14519-9364 585.771.5214 Mark.Geckle@constellation.com Nuclear Generation Group August 12, 2009 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2009-11. Preparation and Scheduling of Operator License Examinations Attached you will find NRC Form 536 providing R.E. Ginna's expected license examination schedule information.

Should you have any questions please contact Mr. Kyle Garnish, General Supervisor, Operations Training at 585-771-5321.

Very truly yu9 Mark Geckle

Enclosure:

Operator Licensing Examination Data, Form 536 cc (w/enc): S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC ix Pi~L-IO(-/cQ'2g9

~w3

~gA

U ~

NRC FORMi636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY SMB:NO. 3150-0131- EXPIRES: 10131120 i 10.2005 Estimated burden ,per, response to comply with this voluntary information collection request: I hour. This Information collection is used to plan budgets and'resources for operator examinations. Send comments t=eardng burden estimate to0theRecords and FOlA/Privacy,.Services. Branch (T-5 F53). U.S.

OPERATOR LICENSING Nuclear Reguilator commnission; Washington, DC' 20555-00Oil.or byintemet e-mail to infocollects@nrc:gov, and to'the Desk Officer, Office of Information EXAMINATION DATA. andRegulatory Affairs, NEOB-10202, (3,150,0131)) Office~of Managementend Budget, Washington;-DC 20503. . Ieameanrs used to, impose an inform6tiori collection does not display a 6urrently vaildOMB control number, the NRC may not conduct or sponso, Iand a person- IS not required to:respond to; the information collection.. * .

FACILITY' Ginna A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 .Cy 2011, ty 2012 ty 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED. NUMBER OF NRC-PREPARED 0 0 0. 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS 20 11 20 2 PROPOSED NUMBER CY 2010 Cy Cy l Cy 2013' NUMBER OF REACTOR 5 0 6 0 OPERATORS "NUMBER OF SENIOR REACTOR 7 4, 0 OPERATORS -INSTANT NUMBEROF SENIOR REACTOR .4 2 0 OPERATORS .UPGRADE, "

NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS v LIMITED PROPOSED. DATES PRIMARY DATE 05/24/2010 03/01/2012 ALTERNATE DATE 06/22/2010 04/01/2012, C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NpRINTEDON RECYCLED PAPER"