ML092260518

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000348/2010-301 and 05000364/2010-301
ML092260518
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/14/2009
From: Widmann M
Division of Reactor Safety II
To: Jerrica Johnson
Southern Nuclear Operating Co
References
IR-10-301
Download: ML092260518 (5)


See also: IR 05000348/2010301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

August 14, 2009

Mr. J. Randy Johnson

Vice President - Farley

Southern Nuclear Operating Company, Inc.

7388 North State Highway 95

Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000348/2010301 AND

05000364/2010301

Dear Mr. Johnson:

In a telephone conversation on August 14, 2009, between Mr. Gary Ohmstede, Lead Instructor

of Exam Development, and Mr. Mark Bates, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at the Farley Nuclear Plant. The

operating test is scheduled to be administered during the weeks of March 8 and March 15,

2010. The written examination is scheduled to be administered the week of March 15, 2010.

The on-site preparatory week is scheduled for the week of February 8, 2010.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make all

copies of examination materials that are necessary for administering the exam.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by September 8, 2009. Mr. Bates provided the written examination outline to your staff

in July, 2009. The operating test, written examination, and the supporting reference materials

identified in Attachment 3 to ES-201 will be due by January 4, 2010. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

SNC

3

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

SNC

2

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG 1021, contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,

DC 20503.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Ohmstede has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Bates at (404) 562-4612, (Internet

E-mail: Mark.Bates@nrc.gov) or me at (404) 562-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov).

Sincerely,

/FJE RA for/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-348, 50-364

License Nos.: NPF-2, NPF-8

cc: (See Page 3)

_

X SUNSI REVIEW COMPLETE FJE

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

MAB /RA/

FJE /RA for/

SMS /RA/

NAME

MBates

MWidmann

SShaeffer

DATE

08/14/2009

08/14/2009

08/14/2009

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

SNC

3

cc w/encl:

B. Doug McKinney

Licensing Manager

B-031

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Angela Thornhill

Managing Attorney and Compliance Officer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Jeffrey T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

William D. Oldfield

Fleet Support Supervisor

Southern Nuclear Operating Company

Electronic Mail Distribution

L. Mike Stinson

Vice President

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Paula Marino

Vice President

Engineering

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Aimee J. Gray

Performance Improvement Supervisor

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

C. Howard Mahan

Principal Licensing Engineer

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Mr. Mark Culver

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

Jim Sommerville

(Acting) Chief

Environmental Protection Division

Department of Natural Resources

Electronic Mail Distribution

Dr. D. E. Williamson

State Health Officer

Alabama Dept. of Public Health

Electronic Mail Distribution

SNC

4

Letter to J. Randy Johnson from Malcolm T. Widmann dated August 14, 2009

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000348/2010301 AND

05000364/2010301

Distribution w/encl:

C. Evans, RII

L. Slack, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMFarley Resource