NRC Operator Licensing Initial Exam Results, Seabrook Station (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML092170219
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/04/2009
From: Hansell S
Operations Branch I
To: Wright K
NextEra Energy Seabrook
Hansell S
Shared Package
ML082950700 List:
References
Download: ML092170219 (2)


Text

August 4, 2009 Mr. Kerry Wright Nuclear Training Manager NextEra Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874

Subject:

NRC Operator Licensing Initial Exam Results Seabrook Station (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Wright:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on June 12, 2009, and the walk-through (overall) and/or simulator operating tests administered June 15-19, 2009, at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, thirteen individuals were administered the examination and seven passed.

However, we will not be issuing licenses for two of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Also, until you certify in writing that the applicant that had been previously granted a waiver has acquired all of the training and experience.

contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

is a copy of the licenses.

Mr.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-443 License No. NPF-86

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Gene F. St. Pierre Vice President North NextEra Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874

Mr.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-443 License No. NPF-86

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Gene F. St. Pierre Vice President North NextEra Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874 Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials)

ADAMS PKG NO.: ML082950700 ADAMS NO.: ML092170219 DOCUMENT NAME: ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB PPresby//SLH for SLHansell/SLH DATE 07/31/09 08 /04 /09 08 / 04 /09 OFFICIAL RECORD COPY