Withdrawal of Relief Request NDE-003 for the Fourth Interval ISI Program
ML092120353
Person / Time
Site: North Anna 
(NPF-004)
Issue date: 07/30/2009
From: Price J
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-449
Download: ML092120353 (2)


Text

10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 30, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNIT 1 WITHDRAWAL OF RELIEF REQUEST NDE-003 FOR THE FOURTH INTERVAL lSI PROGRAM Serial No.09-449 NL&OS/ETS RO Docket No.

50-338 License No.

NPF-4 In a letter dated October 17, 2008 (Serial No. 08-0595), Dominion submitted the North Anna Power Station Unit 1 inservice inspection (lSI) program for the fourth inservice inspection (lSI) interval. The lSI Plan described the programmatic aspects of lSI examinations applicable to Class 1, 2, and 3 components and component supports.

Included with the program were requests for alternatives or relief from the specific code requirements in accordance with 10 CFR 50.55a(a)(3)(i) and/or (ii) or 10 CFR 50.55a(g)(5)(iii).

During a recent review of the Unit 1 fourth interval plan in preparation for a Unit 2 submittal, several administrative omissions and errors were identified in the submitted Unit 1 Relief Request NDE-003. The errors significantly affect the basis of the relief request. Therefore, Dominion is withdrawing Relief Request NDE-003 at this time.

Following an assessment of how these events occurred, Dominion plans to revise Relief Request NDE-003 and resubmit for NRC review and approval. We apologize for any inconvenience this may have caused.

If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerely, J.'A.

ice V c President - Nuclear Engineering Commitments made in this letter: None

cc:

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Mr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Serial No.09-449 Docket No. 50-338 Fourth Interval lSI Plan - NDE-003 Withdrawal Page 2 of 2