ML092020024
| ML092020024 | |
| Person / Time | |
|---|---|
| Issue date: | 04/14/1997 |
| From: | Han J, Morrison D Office of Nuclear Regulatory Research |
| To: | |
| Han, James T. | |
| References | |
| Download: ML092020024 (31) | |
Text
Core Was Always Covered with Water During the 8-Hour Test (Shown is the RPV Collapsed Water Level with Top of the Core at 1.515 m) 6.0 I
I I
I I
I I
I I
I 5.0 I
E--
Q)>
~
4.0 r I Q) co S
J 3.0 I
2.0 0.0 10000.0 20000.0 30000.0 Time (s) 6A
(()
<.0 0
0000
("f)
~0-(I)
CO--
(I)
=:~
0 (1)<<
00 0
(I)(/)
0
=:c.
C\\J
(/)0 (1)1'-
(f)
- Jca Q)
(/)c.
E
(/)~
i=
(I)
"'M c.co 0
-~
0 0
(I)'t-0
~O 0
~
(I)--
=:_5 "C...J c:C:
ca~--
=(/)
(1)(1)
~c
~(I) 0
- .,e 0
0 0
0 00 c.*..
0 0
0 0
0 CD
-q-C\\J 0
co C\\J C\\J C\\J C\\J
~
(Bd)j) 8JnSS8Jd
Drywell and Wetwell Temperatures Were Well Below Design Limits (171°C for Drywall, 121°C for Wetwell) 130.0 120.0 OW 110.0 0
Q) 100.0
"-::J
+-'co 90.0 Q)
Q.
E
~
80.0 70.0 WW 60.0 50.0 0.0 10000.0 20000.0 30000.0 Time (s) 6C
After RPV Slowdown, Pressures in the RPV, Drywell, and Wetwell Came Together and Were Closely Coupled co Q..
260.0 OW
~"--'
Q)
"-:J enen
/
Q) 240.0 WW Q..
200.0 0.0 Time (5) 7A
2.0
..c
('I)
E--
Q) 1.0
+-'
ctS L..
~0 LL 0.0
-1.0 0.0 Goes Injected Water to the RPV at 214 Seconds and Afterwards Time (5) 78
..c M
E--
~
0.005 rn
~
~o LL
-0.005 0.0 Different Steam Condensation Rates Were Observed in the PCCS Condensers Time (s) 7C
Comparison of the RELAP5-Calculated RPV Pressure with PUMA Data for A MSLB Test 800.0 ro 0....
.:::£--
Q) 600.0
'-:J enen Q)'-
0....
400.0 Data 200.0 Cal.
0.00.0 1000.0 2000.0 3000.0 4000.0 Time (5) 8A
co (L
220.0
.::s:.
Q)~
- J C/)
C/)
~
200.0 (L
160.00.0 Comparison of the RELAP5-Calculated Drywell Pressure with PUMA Data for A MSLB Test 2000.0 Time (8) 9A
Comparison of the RELAP5-Calculated Wetwell Pressure with PUMA Data for A MSLB Test 240.0 Data con.
220.0
.::£ Q)
- I-
- J Cal.
enen Q) 200.0
- l-n.
160.0 0.0 2000.0 Time (s) 98