RAI Ptn AST LAR 196 from Courtesy Electronic Copy
ML091970683
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 07/16/2009
From: Mozafari B
Plant Licensing Branch II
To: Abbott L, Myers G, Tiemann P, Tomonto B
Florida Power & Light Co
Mozafari B, NRR/ADRO/DORL, 415-2020
References
Download: ML091970683 (1)


Text

From: Mozafari, Brenda Sent: Thursday, July 16, 2009 7:24 PM To: 'Myers, Gregory'; 'liz.abbott@fpl.com'; 'bob.tomonto@fpl.com';

'phillip.tiemann@fpl.com' Cc: Paige, Jason

Subject:

RAI re: PTN AST LAR 196 from courtesy electronic copy

Folks, As a heads up, Feedback so far has identified information needed to supplement your application that is classified so far as:

Non-acceptance with the opportunity to supplement You will have to supplement the application to demonstrate that the pH in the sump remains greater than 7 over the period of 30 days post-LOCA. You are requested to provide the following information:

1. Provide time dependant values of strong acid concentrations in the sump for a period of 30 days post-LOCA.
2. Describe the analysis methodology used, including assumptions and inputs, to determine the pH in the sump water during a period of 30 days post-LOCA. Include detailed calculations of time dependant pH values in the sump during a 30 day period post-LOCA to demonstrate that the pH remains greater than 7 throughout this time period.

(Please refer to Calvert Cliffs LAR for examples of calculations, ML082480671.)

This email will be placed in ADAMS to document our request to satisfy LIC-109 guidance.

Thanks, Brenda L. Mozafari, Senior Project Manager Division of Operating Reactors - LPL22 St. Lucie Units 1 and 2; Turkey Point Units 3 and 4 301-415-2020