ML091950507

From kanterella
Jump to navigation Jump to search
Letter Requalification Program Inspection
ML091950507
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/11/2009
From: Hironori Peterson
Operations Branch III
To: Meyer L
Point Beach
References
Download: ML091950507 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 11, 2009 Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR POWER PLANT REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Meyer:

In a telephone conversation on June 9, 2009, Mr. R. Amundson, General Supervisor, Operations Training, and Mr. D. McNeil, Senior Operations Specialist, made arrangements for the NRC to inspect the licensed operator requalification program at the Point Beach Nuclear Power Plant.

The inspection is planned for the week of August 31, 2009, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by August 24, 2009. Mr. Amundson has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

L. Meyer The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact D. McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License No. DPR-24; DPR-27 cc: M. Nazar, Senior Vice-President and Chief Nuclear Officer A. Khanpour, Vice-President, Engineering Support M. Warner, Vice-President, Nuclear Plant Support Licensing Manager, Point Beach Nuclear Plant R. Hughes, Director, Licensing and Performance Improvement M. Ross, Vice President and Associate General Counsel A. Fernandez, Senior Attorney T. O. Jones, Vice-President, Nuclear Operations, Mid-West Region P. Wells, Vice-President, Safety Assurance J. Bjorseth, Plant General Manager K. Duveneck, Town Chairman, Town of Two Creeks Chairperson, Public Service Commission of Wisconsin J. Kitsembel, Electric Division, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer D. Lauterbur, Training Department

L. Meyer The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact D. McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License No. DPR-24; DPR-27 cc: M. Nazar, Senior Vice-President and Chief Nuclear Officer A. Khanpour, Vice-President, Engineering Support M. Warner, Vice-President, Nuclear Plant Support Licensing Manager, Point Beach Nuclear Plant R. Hughes, Director, Licensing and Performance Improvement M. Ross, Vice President and Associate General Counsel A. Fernandez, Senior Attorney T. O. Jones, Vice-President, Nuclear Operations, Mid-West Region P. Wells, Vice-President, Safety Assurance J. Bjorseth, Plant General Manager K. Duveneck, Town Chairman, Town of Two Creeks Chairperson, Public Service Commission of Wisconsin J. Kitsembel, Electric Division, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer D. Lauterbur, Training Department DOCUMENT NAME: G:\DRS\WIP\Point Beach Requal Insp Program Ltr.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME D. McNeil:te HPeterson DATE 07/09/2009 07/11/2009 OFFICIAL RECORD COPY

Letter to Larry Meyer from Hironori Peterson dated July 11, 2009.

SUBJECT:

POINT BEACH NUCLEAR POWER PLANT REQUALIFICATION PROGRAM INSPECTION cc: M. Nazar, Senior Vice-President and Chief Nuclear Officer A. Khanpour, Vice-President, Engineering Support M. Warner, Vice-President, Nuclear Plant Support Licensing Manager, Point Beach Nuclear Plant R. Hughes, Director, Licensing and Performance Improvement M. Ross, Vice President and Associate General Counsel A. Fernandez, Senior Attorney T. O. Jones, Vice-President, Nuclear Operations, Mid-West Region P. Wells, Vice-President, Safety Assurance J. Bjorseth, Plant General Manager K. Duveneck, Town Chairman, Town of Two Creeks Chairperson, Public Service Commission of Wisconsin J. Kitsembel, Electric Division, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer D. Lauterbur, Training Department DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Kenneth Obrien Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak Nancy Salgado ROPreports Resource Janet Kweiser