Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activities
ML091950413
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/24/2009
From: Mahesh Chawla
Plant Licensing Branch III
To:
Entergy Operations
Chawla M, NRR/DORL, 415-8371
References
Download: ML091950413 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 24, 2009 LICENSEE: Entergy Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 30, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Based on the progress of the transition so far, the NRC staff has decided to temporarily scale back on these teleconferences from monthly to every two months. However, if the need arises to go back to monthly teleconferences, the licensee will be duly informed. The licensee was in agreement with this approach to monitor the progress. Enclosure 2 provides the list of all attendees.

Background

On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the Palisades Nuclear Plant NFPA 805 transition activities.

Sincerely, Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ

6/2912009 Palisades NFPA 80LS Project Milestones Net Tellk Mlleatone Start ntllI Status!

No. Oete' Date' TlllIlSlIio/'l 01 NueJeIlf Safety Perfol'ma/'lC8 Crileria See TaslI 1: 00130109 IU"el 04-02 Table 8-2.1 Comme/'lls Task 2:

FlJfldamIII'ltal Fife ProteoctionProgram & Oesigl'l 07124109 sea IElements Cornmel"lls Task 3; Aadioacllve Relea5ll Transition 07/31/09 On Track Nuclear Safely Analy$is Tr!l/l$ltion TaSll 4: 09I30I09 On Track NEI 04-02 Table B*31 ST 4.1.1 Off-Site Power Cable Seleclion and AnElIy$ls 08114109 sea Comments ST 4.1.2 Other Power Cable Selection and Analy!lis 031'15109 Complete .

ST 4.1.3 SubS$QU9nt Cable/Instrument ldentlhcallon & Analysis 091'11109 On Track Non*Power OperatiOOllJ Modes Tra/'l$~ion Task 5: O~ On Track NEt 04-02 Table F*lI Task 6: Internal EVII/'lls PRA 02/17/10 On TraCk ST 6.2.1 PrllparllLERf Model 07131109 On Track ST62.2 Update Flooding Analysis 07131109 On Track ST6,3 Therma! ~ulic AnalysiS 'Of MSOIHRA 11116109 On Track 6T 6 .* INema! Evenls PRA Peer Review 1013Q(09 No4 Started 10126109 Task 7: F'Q PM 12122109 On Track -

ST 7.6.4 A3 Intemsl EV6/'lts Model 05,10ll09 COmplete -

ST 7.7 Quantification Risk Screening 06121109 On Track ST7,8 $oop4ng lor Fire Modeling 07/15109 OnT'lICk ST 7.9110 Circuit Faiju!e Mode Uke-Ilhood Analy!liS 09I30I09 OnT,ack ST7.12 Post Fire HRA 10113109 0r1 Track ST7.13 811lSmioc Fire Interaction Assessment 07131109 On Track Fire Risk OuanCiflcatlon 10/07109 See 5T7.14 06f2l:lI09 Comments ST 7.15 lJncertainty and 5e-nsltivily Analysis 09125109 See Comments ST7.17 Fire PRA Peer Review 01122110 Not Slarled 01118110 Task 8: NFPA 805 Chanoe Eva'uations 02/01110 On Track ST B 1 Change Evaluations 12/01/09 On Track S-5T82 f\I()I}-compllanc~Risk Evaluations 12101/09 10!08I09 Comments Palisades MapI'in9 of Post Transrtion Procedures &

Task 9: 01108110 Not Slaned 11l02*'OQ Document ReviSions Task 10: T ransillon Report W18'10 Sa. 09128/09 Comments See Task 11: UCen5ll Amendmenl Request (LAR) 03l1W10 sterted Commeotll

'I n *.'Jt'V/ItfWJ ~ __ ,.. ~ Jl'\.p em S1-1 WIFe ~ 12troVOlt.-a ifill aIDfeCt 10~. T'l'\e ~ Itt"MIdiAO 11:>>5 S5-j\' 08JUN

()III,."._.....,. u8datlld ~ be on t"# bell:w'e .... dttn. Id-. ~ rnliId f'OroTI"Idr*,.,.,... .......... CUl'lW"t~~I8~N~ . . ~tIIID'l~Ind,.~~ ratIt..,.. ..... u.* *

'3.f¥I . . . . 1)I'(W~ Wftma_lJn:I ~~..., ~'\)!l'1t 14U' DI"~ o.~¥Id ~.~ r'~ It1"ill JImt. E:-'1IJfl'1{ lhI"'*""".

~ boompllJloo \Ij _ ~ lIl'CII rn.r ......... W*.8ted ~

~

UILL' &-2Table Reo.......ing longer ",,'" o<!QInioDy :l/1l1OpIllt<l

~

Pa_ tllom\._

P...._ _ fQqi(~llhan ._alo_

Pr_ "'"

Iuk.J.l.1 lAk"'lllonger 11\." . .pec1t<l10 obo.....

III1L.Z.U P_ _ "...Il.d """ Blllr1_~dat&O.

IIIi.lJ.t ~ ""rnploollon ""'"

IaIIL.Li' P_IIOI "'*""d Ill**Iatl aal*. ~""'....-.aJno 11>0 lame.

1MIlJlI: P_.MOf pushed "'" .w. dQle. ComoIotion ,....-.. III........

1AIIU1' Ki<_ meeting be_n LAR _ _ I.£ .... ong eooeo '" ~ ''1IJrlg In 68"Y ,tall '" lI'1io UJsk.

Enclosure 1

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS JUNE 30, 2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief John Ellegood Senior Resident Inspector REGION 3 ENTERGY Alan Blind Acting Director of Engineering PALISADES NUCLEAR PLANT Bob VanWagner Program Engineering Manager Paula Anderson Licensing Manager Brian Brogan Probabilistic Safety Assessment Engineer Tom Swiecicki Fire Protection Engineer Roger Stobert Contract Project Manager NFPA 805 Jim Kuemin Licensing Engineer Enclosure 2

'.. ML091950413 OFFICE LPL3-1/PM LPL3-1/LA DRAlAFPB/BC LPL3-1/BC NAME MChawla BTuily AKlein LJames DATE 07/16/09 07/16/09 07/15/09 07/24/09