Licensed Operator Requal Request for Information
ML091940390
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/09/2009
From: Hironori Peterson
Operations Branch III
To: O'Connor T
Northern States Power Co
References
Download: ML091940390 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 9, 2009 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT REQUALIFICATION PROGRAM INSPECTION

Dear Mr. OConnor:

In a telephone conversation on June 19, 2009, Mr. G. Allex, License Operator Requalification Lead, and Mr. M. Bielby, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Monticello Nuclear Generating Plant, Unit 1.

The inspection is planned for the week of October 26, 2009, which coincides with your regularly scheduled requalification examination cycle. The inspection was originally scheduled for the week of September 28, 2009, but was changed based on emerging scheduling conflicts at another facility. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by October 9, 2009. Mr. Allex has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budge control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact M. Bielby at 630-829-9726, or me at 630-829-9707.

Sincerely,

/RA by B. Palagi Acting For/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc:

D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.

J. Stine, State Liaison Officer, Minnesota Department of Health Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office M. Walter, Training Department

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budge control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact M. Bielby at 630-829-9726, or me at 630-829-9707.

Sincerely,

/RA by B. Palagi Acting For/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc:

D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.

J. Stine, State Liaison Officer, Minnesota Department of Health Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office M. Walter, Training Department DOCUMENT NAME: G:\\DRS\\WIP\\Monticello Requal Insp Program Ltr.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME M. Bielby: te HPeterson DATE 07/09/09 07/09/09 OFFICIAL RECORD COPY

Letter to Timothy OConnor from Hironori Peterson dated July 9, 2009.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT REQUALIFICATION PROGRAM INSPECTION cc:

D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.

J. Stine, State Liaison Officer, Minnesota Department of Health Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office M. Walter, Training Department DISTRIBUTION Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Kenneth Obrien Jared Heck Allan Barker Jeannie Choe Linda Linn Janet Kweiser DRPIII DRSIII Patricia Buckley Tammy Tomczak Nancy Salgado ROPreports Resource