XcelEnergy-June 24, 2009 L-PI-09-083 10 CFR 54 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Revised Scoping Boundary Drawings to Facilitate Review of Application for Renewed Operating Licenses By letter dated April 11, 2008, Northern States Power Company, a Minnesota Corporation, (NSPM) submitted an Application for Renewed Operating Licenses (LRA) for the Prairie Island Nuclear Generating Plant (PINGP) Units 1 and 2. On June 4, 2009, the NRC issued the Safety Evaluation Report With Open Items Related to the License Renewal of the Prairie Island Nuclear Generating Plant Units 1 and 2 (SER).
The SER contained Open Item 2.1.4.1.2-01 related to the PINGP Waste Gas Decay Tanks not being included in the scope of License Renewal under 10 CFR 54.4. The NSPM response to Open Item 2.1.4.1.2-01 was provided in a letter dated June 5, 2009.
That letter indicated that the Waste Gas Decay Tanks had been reclassified as in scope, and included revisions to the LRA scoping, screening, aging management review information to reflect that change. Subsequently, to facilitate NRC review of those changes, the NRC License Renewal Project Manager requested that updated Scoping Boundary Drawings be provided which showed the scoping boundary changes resulting from the reclassification of the tanks. provides the applicable Scoping Boundary Drawings, updated to show the new boundaries that resulted from reclassifying the Waste Gas Decay Tanks as in scope of License Renewal.
If there are any questions or if additional information is needed, please contact Mr. Eugene Eckholt, License Renewal Project Manager.
Summary of Commitments This letter contains no new commitments or changes to existing commitments.
Michael D. Wadley Site Vice President, Prairie Island Nuclear Generating'Plant Units 1 and 2 Northern States Power Company - Minnesota
/3S 1717 Wakonade Drive East 9 Welch, Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 Enclosure (1) cc:
Administrator, Region III, USNRC License Renewal Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Prairie Island Indian Community ATTN: Phil Mahowald Minnesota Department of Commerce Revised Scoping Boundary Drawings LR-39246-2 LR-39247 LR-XH-1 -124 LR-XH-550-1 LR-XH-550-6-2
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT License Renewal Boundary Drawing "Waste Disposal System" Units 1 & 2 Flow Diagram Rev. 4 LR-XH-1 -124 WITHIN THIS PACKAGE...
D-O1
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT License Renewal Boundary Drawing "Waste Disposal System" Units 1 & 2 Flow Diagram Rev. 6 LR-XH-550-1 WITHIN THIS PACKAGE...
D-02
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT License Renewal Boundary Drawing "Catalytic Hydrogen Recombiner-B (#122)
Spin NSP-Ghreca-01 (High Level)
Rev. 2 LR-XH-550-6-2 WITHIN THIS PACKAGE...
D-03
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT License Renewal Boundary Drawing "Component Cooling System" Unit 2 Flow Diagram Rev. 3 LR-39246-2 WITHIN THIS PACKAGE...
D-04
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT License Renewal Boundary Drawing
"'Miscellaneous Gas System" Units 1 & 2 Flow Diagram Rev. 4 LR-39247 WITHIN THIS PACKAGE...
D-05X