ML091870837

From kanterella
Jump to navigation Jump to search
Summary of Non-Public Meeting with Palisades Nuclear Plant to Discuss EOC Security Performance for Calendar Year 2008
ML091870837
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/06/2009
From: Eric Duncan
Plant Support Branch II
To: Schwarz C
Entergy Nuclear Operations
Shared Package
ML091820279 List:
References
Download: ML091870837 (5)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON LISLE, ILLINOIS 60532 July 6, 2009 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

SUMMARY

OF THE PALISADES NUCLEAR PLANT JUNE 17, 2009, NON-PUBLIC MEETING TO DISCUSS END-OF-CYCLE SECURITY PERFORMANCE FOR CALENDAR YEAR 2008

Dear Mr. Schwarz:

On June 17, 2009, the Nuclear Regulatory Commission (NRC) held a Non-Public Meeting at the Palisades Nuclear Plant, located at 27780 Blue Star Memorial Highway, Covert, Michigan. The purpose of the meeting was to discuss the NRC End-of-Cycle assessment of the Palisades Nuclear Plant security performance for the 2008 calendar year.

Mr. Eric Duncan, Chief, Plant Support Branch, Division of Reactor Safety, Region III, opened the meeting with an introduction of NRC officials, the reason for the meeting, and a review of the NRCs Reactor Oversight Process. Mr. Duncan then discussed the Palisades Nuclear Plant security performance for the 2008 calendar year and provided the licensee with an opportunity to provide any response and remarks. Following the completion of the licensees presentation and remarks, Mr. Steve West, Director, Division of Reactor Safety, Region III, and Mr. Mark Satorius, Regional Administrator, Region III, provided additional insight on the security performance of the Palisades Nuclear Plant. Mr. Satorius then adjourned the meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and the attendance listing will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of

C. Schwarz NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20

Enclosure:

Meeting Attendees cc: Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, State Liaison Officer, State of Michigan Michigan Department of Environmental Quality Michigan Office of the Attorney General

Letter to Christopher J. Schwarz from Eric R. Duncan dated July 6, 2009

SUBJECT:

SUMMARY

OF THE PALISADES NUCLEAR PLANT JUNE 17, 2009, NON-PUBLIC MEETING TO DISCUSS END-OF-CYCLE SECURITY PERFORMANCE FOR CALENDAR YEAR 2008 DISTRIBUTION:

Susan Bagley RidsNrrPMPalisades RidsNrrDorlLpl3-1 RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak

C. Schwarz NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20

Enclosure:

Meeting Attendees cc: Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, State Liaison Officer, State of Michigan Michigan Department of Environmental Quality Michigan Office of the Attorney General DOCUMENT NAME: Ltr 07__09 Palisades EOC 08 Non-Public meeting summary.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII RIII RIII NAME JMaynen for GHansen:co JMaynen for JGeissner EDuncan DFunk DATE 07/01/09 07/01/09 07/06/09 07/06/09 OFFICIAL RECORD COPY

MEETING PRINCIPAL ATTENDEES June 17, 2008 Entergy Chris Schwarz Entergy/Site Vice President Tom Kirwin Entergy/General Manager Plant Operations John McCann Entergy/Director Nuclear Safety & Licensing Ed Weinkam Entergy/Senior Manager Nuclear Safety & Licensing Marty Frato Entergy/Security Manager Alan Blind Entergy/Engineering Director Paula Anderson Entergy/Licensing Manager Mike Balduzz Entergy/Senior Vice President COO Judy Ford Entergy/Corrective Action and Assessment Manager John McCann Entergy/Director, Nuclear Safety & Licensing Tim Mitchell Entergy/Senior Vice President, Eng & Tech Services Fred Marcussen Entergy/Senior Manager Security Operations Nuclear Regulatory Commission Mark Satorius Regional Administrator, Region III Steve West Director, Division of Reactor Safety, Region III Eric Duncan Chief, Plant Support Branch, Region III Jack Geissner Chief, Branch 4, Division of Reactor Projects, Region III John Ellegood Senior Resident Inspector, Palisades Gregg Hansen Physical Security Inspector, Region III Enclosure