ML091810978

From kanterella
Jump to navigation Jump to search
Idaho State Univ. - Change in Reactor Supervisory Position
ML091810978
Person / Time
Site: Idaho State University
Issue date: 06/19/2009
From: Kunze J
Idaho State University
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML091810978 (1)


Text

June 19, 2009 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555 STATE UNIVERSITY Re.:

SUBJECT:

Docket #50-284, Reactor License R-1 10 Change in Reactor Supervisory Position College of Engineering 921 South 8th Avenue, Stop 8060 Pocatello, Idaho 83209-8060 Phone: (208) 282-2902 Fax:

(208) 282-4538 email: engineering@isu.edu

Dear Sir/Madam:

Effective June 15, 2010, Mr. Adam Mallicoat has been appointed Reactor Supervisor for the AGN-20 I Training Reactor at Idaho State University, under license # R-110, Mr. Mallicoal replaces Interim Reactor Supervisor Mr. Kenyon Hart.

Mr. Mallicoat holds a Senior Reactor Operating License (SOP-70589) for the subject reactor, license R-1 10.

Sincerely, ay F. Kunze, PhE, PE, CHP Reactor Administrator and Professor kunzejay(2isu.edu c: Mr. Duane.Hardesty, Project Manager Research and Test Reactors U.S.ýNuclear Regulatory Commission Mail Stop: 0-12 D03 11555 Rockville Pike Rockvil~le, MD.20852 Dr. Pam Crowell, Vice President for Research t..,!:,-

Ao2-o ISU Is An Equal Opportunity Employer