Text
A EDO Principal Correspondence Control FROM:
DUE: 07/24/09 EDO CONTROL: G20090359 DOC DT: 06/17/09 FINAL REPLY:
- Oswego, New York TO:
Borchardt, EDO FOR SIGNATURE OF
- GRN CRC NO:
- Leeds, NRR DESC:
ROUTING:
2.206 -
Entergy/Indian Point 2 & 3 (EDATS: OEDO-2009-0401)
Borchardt Virgilio Mallett Ash Ordaz Burns/Gray Collins, RI
- Burns, OGC
- Mensah, NRR
- Marco, OGC Trocine, OEDO DATE: 06/24/09 ASSIGNED TO:
NRR CONTACT:
Leeds SPECIAL INSTRUCTIONS OR REMARKS:
T~Qv~w~ &~O~oot E-110bs', &1b6-o
EDATS Number: OEDO-2009-0401 Source: OEDO Assigned To: NRR Other Assignees:
Subject:
2.206 - Entergy/Indian Point 2 & 3
==
Description:==
OEDO Due Date: 7/24/2009 5:00 PM SECY Due Date: NONE CC Routing: Region I; OGC ADAMS Accession Numbers -
Incoming: NONE Response/Package: NONE Cross Reference Number: G20090359 Staff Initiated: NO Related Task:
Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO Roadmap Item: NO Prcss Infomaio Action Type: Letter Priority: Medium Sensitivity: None Signature Level: NRR Urgency: NO OEDO Concurrence: NO, OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Copies to T. Mensah, NRR and C. Marco, OGC.
Originator Name: Tom Gurdziel Date of Incoming: 6/17/2009 Originating Organization: Citizens Document Received by OEDO Date: 6/24/2009 Addressee: R. W. Borchardt, EDO Date Response Requested by Originator: 7/24/2009 Incoming Task Received: 2.206 Page 1 of l
9 Twin Orchard Drive Oswego, NY 13126 June 17, 2009 Mr. R. William Borchardt, Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Mr. R. William Borchardt:
This is a 2.206 request letter.
I am greatly disturbed by the lack of progress I see in repairing a boiler feedwater pump at Entergy/Indian Point 3. On the one hand, it is a non-safety related item. However, on the other hand, they just repaired it in their Spring 2009 Refuel Outage about 2 months ago. It ran only about 3 weeks before it failed. Currently, they have spent about another 3 weeks working on it unsuccessfully.
Request One While this type of repair performance can be tolerated for non-safety related equipment, I do not find it acceptable for repair of safety-related equipment. Therefore, I am requesting that Entergy/Indian Point Unit 3 be shut down immediately if any journeyman (or higher) Entergy employee who has worked on the feedwater system from the outage to now is not restricted from working on Unit 3 safety-related equipment. Also, if all such employees are not restricted from working on Unit 2 safety-related equipment, I request that Entergy/Indian Point Unit 2 be shut down immediately, too. Also include all Unit 2 feedwater system engineers and all Unit 2 component engineers accountable for pumps. Do not include any helper-type mechanics.
Request Two And, until Entergy/Indian Point 3 can prove that they can suitably maintain plant equipment less than 40 years old, I request that any NRC actions for relicensing Indian Point Unit 3 (to a 60 year life) be put on hold.
Thank 3TQ Tom Gurdziel
,EDO -- G2009035 9
,?n 4nI nn