ML091760322

From kanterella
Jump to navigation Jump to search

Draft RAI on the Core Operating Limits Report for Cycle 25
ML091760322
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/24/2009
From: Tam P
Plant Licensing Branch III
To: Loeffler R, Salamon G
Northern States Power Co
Tam P
References
TAC ME1422
Download: ML091760322 (2)


Text

Accession No. ML091760322 From:

Tam, Peter Sent:

Wednesday, June 24, 2009 2:53 PM To:

Loeffler, Richard A.; Salamon, Gabor Cc:

Huang, Tai

Subject:

Monticello - Draft RAI on COLR for Cycle 25 (TAC ME1422)

Rick:

We would like to have a conference call with you to clarify a few items described in the Cycle 25 COLR, such as which version of TRACG code was used to generate confirmation count setpoint and amplitude setpoint, and the backup stability protection (BSP) calculation in Table 23 corresponding to power/flow map shown in Figuress 5 and 6.

This e-mail aims solely to prepare you and others for the requested phone call. It does not convey a formal NRC staff position, and it does not formally request for information.

Peter S. Tam Senior Project Manager (for Kewaunee and Monticello)

Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451