MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 ML23341A0062023-12-21021 December 2023 Project Manager Assignment AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 2024-01-08
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 07/01/09 EDO CONTROL: G20090327 DOC DT: 05/31/09 FINAL REPLY:
Tom Gurdziel Oswego, New York TO:
Borchardt, EDO FOR SIGNATURE OF : ** GRN ** CRC NO:
Leeds, NRR DESC: ROUTING:
Pressurized-Water Reactor - Palo Verde/Cook Unit 1 Borchardt (EDATS: OEDO-2009-0359) Virgilio Mallett Ash Ordaz Burns/Gray DATE: 06/09/09 Satorius, RIII Collins, RIV ASSIGNED TO: CONTACT: Shoop, OEDO NRR Leeds SPECIAL INSTRUCTIONS OR REMARKS:
I-emPI a~e, El_ýO -00
EDATS Number: OEDO-2009-0359 Source: OEDO GeneralInfomaio Assigned To: NRR OEDO Due Date: 7/1/2009 5:00 PM Other Assignees: SECY Due Date: NONE
Subject:
Pressurized-Water Reactor - Palo Verde/Cook Unit I
==
Description:==
CC Routing: Region 1Il; Region IV ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Ote Infomaio Cross Reference Number: G20090327 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO Roadmap Item: NO Action Type: Letter Priority: Medium Sensitivity: None Signature Level: NRR Urgency: NO OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions:
Doumn Infomaio Originator Name: Tom Gurdziel Date of Incoming: 5/31/2009 Originating Organization: Citizens Document Received by OEDO Date: 6/9/2009 Addressee: R. W. Borchardt, EDO Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I
9 Twin Orchard Drive Oswego, NY 13126 May 31, 2009 Mr. R. William Borchardt, Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Mr. R. William Borchardt:
I am writing this letter to explain a problem I have with what appears to be a PWR practice.
My recollection from when I worked on an Operations Department shift at a BWR is that, when there was a problem with the turbine, (like high vibration), the turbine was tripped.
It followed that the reactor tripped automatically if the steam flow was above the capacity of the bypass valves.
Recently, I have been reading about a couple of PWR turbine vibration problems where the practice appears to be to trip, not the turbine, but the reactor. Could you have somebody check that what is presently being done is appropriate?
(The two problems I have seen are the Cook 1 turbine blade failure in about September, 2008, and Palo Verde 3 from Event Number 44970.)
Thank ou, Tom CGurddziel EDO -- G20090327
.U.S. GPO: 2004-307-316/81187 U
NRC.FORM 253"_ :,U.S. NUCLEAR REGULATORY COMISSION ýDATEIOF REQUEST (9-96)
MESSENGER/COURIER RECEIPT 9 U OFFCE BUILDING T1'
/
FROM: . ..- OFFIcE* ' '-," BUILDING E" DESCRIPTION MESSENGER/COURIER SIGNATURE 70*;*"' 32 j30 6 " / 22 y ' MESSENGER/COURIER DATE E MESSENGER/COURIER DATE RECEIVED TIME RECEIVED
.RECIPIENT'S SIGNATURE RECIPIENT .. DATE RECEIVED
______________________ ________________ f TIME RECEIVED SENDER::".. MESSENGERICOURIER .: RECIPIENT:
l.:Complete "DATE OF REQUESTi"TIO:," "FROM:;" 1.. Deliver package to recipient or next messengerF 1. .Provide-signature, date received, and time received
.:and unclassified "DESCRIPTION" blocks. - courier enroutetd 'ddbrssee.. in the appropriate blocks. "
- 2. !Obtain MESSENGER/COURIER signature; date. 2.: ObtainMESSENGER/COURIER or RECIPIENT 2.. Retain RECIPIENTS COPY. .
received, and time received in first blocks provided. .. signature, date received, and time received in the 3. Return original-to mesenger/courier immediately,
- 3. Retain'SENDER'S SUSPENSE COPY." " 1 appropriate blccks'proi6Aded. who wilt return it to thesender.-
NRC FORM 253 ý,(9-96) PRINTED ON RECYCLED PAPER
.MESSENGER/COURIER COPY 7i