Summary of Public Meeting with Detroit Edison Company to Discuss the 2008 Fermi Unit 2 End-of-Cycle Performance Assessment
ML091530537
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/02/2009
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML091530537 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 2, 2009 LICENSEE: Detroit Edison Energy Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE MAY 27, 2009, PUBLIC MEETING TO DISCUSS THE 2008 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On May 27, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs assessment of the safety performance of Fermi Power Plant Unit 2 for the period from January 1, 2008, through December 31, 2008. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091210230 and ML091460668, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2008. The results of that assessment were discussed in a letter to the licensee dated March 4, 2009 (ADAMS ML090630270). As part of this regulatory performance meeting, Detroit Edison responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As Stated DISTRIBUTION See next page

LICENSEE: Detroit Edison Energy Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE MAY 27, 2009, PUBLIC MEETING TO DISCUSS THE 2008 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On May 27, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs assessment of the safety performance of Fermi Power Plant Unit 2 for the period from January 1, 2008, through December 31, 2008. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091210230 and ML091460668, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2008. The results of that assessment were discussed in a letter to the licensee dated March 4, 2009 (ADAMS ML090630270). As part of this regulatory performance meeting, Detroit Edison responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As Stated DISTRIBUTION See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC 2008\EOC Letters\EOC Meeting Summaries\Fermi EOC 08 public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt:dtp JGiessner DATE 06/02/09 06/02/09 OFFICIAL RECORD COPY

Letter to Detroit Edison Energy Company from J. Giessner dated June 2, 2009

SUBJECT:

SUMMARY

OF THE MAY 27, 2009, PUBLIC MEETING TO DISCUSS THE 2008 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality G. Williams, Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO

Letter to Detroit Edison Energy Company from J. Giessner dated June 2, 2009

SUBJECT:

SUMMARY

OF THE MAY 27, 2009, PUBLIC MEETING TO DISCUSS THE 2008 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource Patrick Hiland Jared Heck Kenneth Obrien Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

PUBLIC MEETING PRINCIPAL ATTENDEES Nuclear Regulatory Commission J. Giessner, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi M. Chawla, Project Manager, NRR M. Tonacci, Safety Project Manager, NRO S. Lemont, Environmental Project Manager, NRO V. Mitlying, Senior Public Affairs Officer, RIII H. Logaras, Regional Governmental Liaison Specialist, RIII E. Martinez, NSPDP, NRO M. Kamprath, Resident Office Assistant, Fermi Detroit Edison Company K. Scott, Acting Plant Manager C. Walker, Director Organizational Effectiveness M. Caragher, Director Nuclear Engineering R. Johnson, Licensing Manager P. Smith, Nuclear Development G. Ohlemacher, Licensing Compliances Supervisor, DTE Energy S. Hassoun, DTE Energy S. Stasek, DTE Energy Other Attendees C. Slat, Monroe Evening News