2009-03 - Draft Outline Comments
ML091490482
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/27/2009
From: Brian Larson
NRC Region 4
To:
Omaha Public Power District
References
50-285/09-301 50-285/09-301
Download: ML091490482 (2)


Text

Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0 Facility:

FC First Exam Date:

03/27/2009 Written Exam Outline (1/22/2009)

Comment Resolution 1 Put revision number on all forms.

Will do.

2 Sampling methodology - were 000007 Reactor Trip and CE/E02 Reactor Trip Recovery sampled as separate E/APEs?

Yes.

3 Sampling methodology - were 000040 Steam Line Rupture and CE/E05 Excessive Steam Demand sampled as separate E/APEs?

Yes.

4 Provide ES-401-2/3s for Audit exam.

Will do.

Administrative JPM Outline (1/22/2009)

Comment Resolution 1 Use A designators (A1-A4 for RO, A5-A9 for SRO)

Will do.

2 Put revision number on all forms.

Will do.

3 Draft exam submittal for Modified JPMs must include a copy of the parent JPM.

Will do.

4 Provide ES-301-1 for Audit exam.

Will do.

5 SRO - G2.2.37 is also on written exam.

Ensure no content overlap.

Will do.

6 SRO - Is the Authorize Monitor Tank Release the same as the Radiation Control Admin JPM in the 2005 exam?

No.

OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (1/22/2009)

Comment Resolution 1 Use S designators (S1-S8) and P designators (P1-P3)

Will do.

2 Put revision number on all forms.

Will do.

3 Draft exam submittal for Modified JPMs must include a copy of the parent JPM.

Will do.

4 Provide ES-301-2 for Audit exam.

Will do.

Simulator Scenario Outline Comments (1/22/2009)

Comment Resolution 1 Provide ES-D-1s for Audit exam.

Will do.

2 For each scenario, complete Target Quantitative Attributes from ES-301-4 and include on D-1s.

Will do.

3 Last two NRC exams have included SGTR - replace this Major Event Will do.

4 Scenario 3, Event 2 - minor discriminatory value Will replace the event.

5 Scenario 3, Event 7 - include description of PT-910 Will do.

6 ES-305-1: blocks should identify event numbers, not totals (like the ES-301-6)

Will correct.

7 ES-305-1: final will depend on which scenarios are selected for exam (after validation)

Okay.

8 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call.

N/A 9

When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.

N/A 10 When preparing Draft Op Test, identify all procedure transitions in the D-2s.

N/A