MONTHYEARML0905400052009-02-26026 February 2009 University of Wisconsin-Madison - Request for Additional Information Amendment Request for Conversion of High Enriched Uranium to Low Enriched Uranium (Tac MD9592) Project stage: RAI ML0914703912009-04-10010 April 2009 University of Wisconsin, Madison, Response to Request for Additional Information Regarding Heu/Leu Conversion for License Amendment No. 17 Project stage: Response to RAI ML0914703902009-05-0101 May 2009 University of Wisconsin, Madison, Response to Request for Clarification Regarding Heu/Leu Conversion for License Amendment No. 17 Project stage: Request ML0916107042009-06-0808 June 2009 University of Wisconsin, Madison, Response to Request for Clarification for License Amendment No. 17 to Facility License No. R-74 Project stage: Request ML0913908022009-06-11011 June 2009 Issuance of Order Modifying License No. R - 74 to Convert from High - to Low Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor Project stage: Approval ML0916300852009-06-11011 June 2009 University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592) Project stage: Other ML0915907342009-06-11011 June 2009 Enclosure 3- Replacement Pages for Technical Specifications, Issuance of Order Modifying License No. R-74 Project stage: Approval NRC-2009-0245, University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592)2009-06-11011 June 2009 University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592) Project stage: Other ML1017404322010-06-21021 June 2010 Reactor Start-Up Report Following Order to Convert from High to Low Enriched Uranium Fuel at the University of Wisconsin Nuclear Reactor TAC No. MD9592 (EA-09-141) Project stage: Other 2009-05-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000156/20244102024-11-25025 November 2024 University of Wisconsin - U.S. Nuclear Regulatory Commission Security Inspection Report No. 050000156/2024410 ML24262A2212024-09-13013 September 2024 2023-2024 Annual Report for the University of Wisconsin Nuclear Reactor Laboratory ML24052A0452024-06-25025 June 2024 Examination Report Letter No. 50-156/OL-24-01, University of Wisconsin ML24052A0462024-06-25025 June 2024 Examination Result Letter No. 50-156/OL-24-01, University of Wisconsin IR 05000156/20242012024-05-30030 May 2024 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2024201 ML24109A0632024-04-22022 April 2024 University of Wisconsin - Change of Facility Backup Project Manager ML24099A0562024-03-27027 March 2024 University of Wisconsin-Madison - 10 CFR 50.74; Notification of Change in Operator or Senior Operator Status ML24037A2162024-02-13013 February 2024 Examination Confirmation Letter No. 50-156/OL-24-01, University of Wisconsin IR 05000156/20232012023-08-0101 August 2023 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2023201 - Cover Letter and Enclosure IR 05000156/20222022022-12-28028 December 2022 University of Wisconsin - U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000156-2022202 Cover Letter ML22340A0052022-11-30030 November 2022 Univ of Wisconsin - Madison, Submittal of 2021 - 2022 Annual Report ML22292A2982022-11-28028 November 2022 University of Wisconsin Research Reactor, Closure of Confirmatory Action Letter No. NRR-03-002 on the Site-Specific Compensatory Measures Implementation Plan ML22224A0852022-08-0808 August 2022 University of Wisconsin - Madison, Physical Security Protection Plan Cover Page & CAL No. NRR-03-002; Confirmatory Action Letter - Site Specific Compensatory Measures Implementation Plan, Request to Change Commitment ML22200A0422022-07-13013 July 2022 University of Wisconsin-Madison - Change to Physical Security Protection Plan in Accordance with 10 CFR 50.54(p) (2) IR 05000156/20222012022-06-0101 June 2022 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2022201 ML22138A1872022-05-12012 May 2022 Univ. of Wisconsin - Madison, Technical Specification 6. 7. 2 (2) (a) Change in Operating Organization ML22062A7662022-04-20020 April 2022 The University of Wisconsin - Issuance of Amendment No. 18 to Facility License No. R-74 to Revise the Organizational Structure in the Technical Specifications for the University of Wisconsin Nuclear Reactor ML22046A0592022-02-24024 February 2022 Examination Confirmation Letter No. 50-156/OL-22-01, University of Wisconsin- Madison ML21253A2452021-09-23023 September 2021 University of Wisconsin - Change of Facility Project Manager ML21251A4862021-09-0202 September 2021 Univ. of Wisconsin, Madison - Annual Operating Report Fiscal Year 2020-2021 IR 05000156/20212012021-06-0303 June 2021 Univesity of Wisconsin - U.S. NRC Routine Inspection Report 05000156/2021201 ML21103A2532021-04-13013 April 2021 Examination Confirmation Letter No.50-156/OL-21-01, University of Wisconsin - Madison IR 05000156/20202022020-11-16016 November 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2020202 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20276A1192020-09-25025 September 2020 Univ. of Wisconsin, Madison - Transmittal of 2019-2020 Annual Report ML20253A3162020-09-22022 September 2020 Examination Report No. 50-156/OL-20-01, University of Wisconsin-Madison ML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications IR 05000156/20202012020-05-20020 May 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Security Inspection Report No. 050000156/2020-201 - Non-OUOSRI (Cover Ltr) ML19351C7472019-12-0606 December 2019 Univ. of Wisconsin - Madison - Transmittal of 2018-2019 Annual Report ML19190A0912019-07-0202 July 2019 University of Wisconsin-Madison - Technical Specification 6.7.2 (2)(a): Change in Operating Organization IR 05000156/20192012019-04-24024 April 2019 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-156/2019-201 ML18365A3502019-01-0808 January 2019 University of Wisconsin - Change of Facility Project Manager IR 05000156/20182012018-08-15015 August 2018 University of Wisconsin - Nuclear Regulatory Commission Security Inspection Report No. 50-156/2018-201 (Letter) ML18200A0652018-07-16016 July 2018 Transmittal of 2017-2018 Annual Report for the University of Wisconsin Nuclear Reactor Laboratory ML18179A1692018-06-25025 June 2018 University of Wisconsin-Madison - 10 CFR 50.74, Notification of Change in Operator or Senior Operator Status ML18178A3882018-06-22022 June 2018 Examination Report No. 50-156/OL-18-01, University of Wisconsin-Madison IR 05000156/20182022018-05-22022 May 2018 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-156/2018-202 (Cover Letter & Enclosure) ML18086B3102018-03-27027 March 2018 Examination Confirmation Letter 50-156/OL-8-01, Wisconsin ML17202D0782017-07-17017 July 2017 University of Wisconsin Nuclear Reactor Laboratory: 2016-2017 Annual Report IR 05000156/20172012017-06-0505 June 2017 University of Wisconsin - Nuclear Regulatory Commission Routine Inspection Report 05000156/2017201 ML17104A0982017-04-19019 April 2017 Non-Power Reactor Closeout of Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools University of Wisconsin Docket No. 50-156 (CAC No. A11010) ML16286A2352016-10-0505 October 2016 Univ. of Wisconsin - Madison, Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools IR 05000156/20162022016-08-11011 August 2016 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2016202 ML16217A4602016-07-29029 July 2016 University of Wisconsin, Submittal of Annual Operating Report 2015-2016 Fiscal Year IR 05000156/20162012016-05-23023 May 2016 IR 05000156/2016-201 - May 2-5, 2016 - University of Wisconsin - Nuclear Regulatory Commission Security Inspection Report ML16096A1552016-04-0707 April 2016 Examination Notification Letter No. 50-156/OL-16-01,University of Wisconsin ML15218A0302015-07-31031 July 2015 University of Wisconsin, Madison - Transmittal of the 2014-2015 Annual Operating Report IR 05000156/20152012015-06-24024 June 2015 IR 05000156/2015201 - 06/08/15 - 06/11/15, University of Wisconsin- NRC Routine Inspection ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures ML15055A5962015-02-20020 February 2015 Technical Specification 6.7.2(2)(a), Change in Operating Organization 2024-09-13
[Table view] |
Text
UNIVERSITY OF WISCONSIN NUCLEAR REACTOR LICENSE NO. R-74 DOCKET NO. 50-156 RESPONSE TO REQUEST FOR CLARIFICATION REGARDING HEU/LEU CONVERSION REDACTED VERSION SECURITY-RELATED INFORMATION REMOVED REDACTED TEXT AND FIGURES BLACKED OUT OR DENOTED BY BRACKETS
1 Nuciear Reactor Laboratory UWNR University of Wisconsin-Madison 1513 University Avenue, Room 1215 ME, Madison, WI 53706-1687, Tel: (608) 262-3392,.. FAX: (608) 262-8590 email: reactor@engr.wisc.edu, http://reactor.engr.wisc.edu May 1, 2009 RSC 1008 Mr. William Schuster Project Engineer, Research and Test Reactors United.States Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Docket 50-156, License. R-74 Response to Request for Clarification for Amendment No. 17 to Facility License No. R-74 University of Wisconsin Nuclear Reactor TAC No. MD9592
Dear Mr. Schuster:
By telephone conference, on April 301 2009, you requested clarifying information to our April 10, 2009 response to the Commission's request for additional information, dated February 26, 2009. Specifically, you requested clarification to the responses to questions 52 and.55.
the calculated drain time of to the In' question 52 we. indicate represents the time to drain during a postulated reduction in cooling accident, which is analyzed in section 13.3 of our safety analysis report (SAR), submitted to the Commission on August 25, I
2008. In question 55 we supplied the analysis that demonstrates a complete loss of coolant accident (LOCA) is more limiting than
- a partial LOCA.
The analyses in. section 13.3 of the SAR and in response to question 55 may not be bounding since the air cooled transients begin at ; however, using the assumptions in section 13.3.1 of the SAR, it would only takes to drain to This reduction in time before the air cooled transients begin results in a 5.6% higher initial decay heat power of 19.6kW,. as compared to the assumed power of 18.6kW and therefore, slightly higher rod temperatures.
However the drain time calculated in section 13.3.1 is based on nominal dimensions of the reactor pool and beam ports. Using
as-built measurements for the reactor pool surface area, accounting for beam port tube wall thickness and the actual low reactor pool water level SCRAM set point, a more accurate drain time can be calculated using equation 13.3.1 from the SAR as follows:
td = -AA0 -[ [l- ] Equation 13.3.1 where:
td- Time to drain pool from the low reactor pool water level SCRAM set point to-a height of , in seconds.
g Acceleration due to gravity given as 32.174 ft/s 2 .
AP Actual area of pool surface-measured as A0 = True open area of beam port tube is .
NOTE: Section 13.3.1 of the SAR incorrectly reports the nominal dimension of the beam port tube, of 0.5ft, as the inside diameter.
Cd Discharge coefficient assumed to be 0.6.
h, = Height of water from the low reactor pool water level SCRAM set point to determined to be 3 h = Height of water from the to determined to be The actual drain time to from an assumed sheared open beam port accident would be , which is greater than the assumed drain time of . As a result, the decay heat at is 18.5kW and the analyses of section 13.3.3 of the SAR and question 55 are bounding.
It should be noted however, that the analyses of SAR section 13.3.3 and question 55 neglect several mitigating-measures that minimize the occurrence and consequence of this type of
accident. Specifically, it is assumed the reactor has operated continuously for 50 days," but the facility is not staffed for round-the-clock operations. Additionally, the beam ports are filled with beam stop plugs when no experiment is inserted and the beam port can not be opened during reactor operations due to hazardous radiation levels. To limit the release of Ar-41 to the environment, administratively, beam ports can not be opened any earlier than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> following reactor operations. When experiments are inserted into the reactor beam port thiy must incorporate a flanged end that seals the experiment in the beam port and provide an air tight and water tight seal. Finally, the beam port incorporates.a lead shutter internal to the biological shield, that is normally~closed, and could easily reduce the flow out of a postulated sheared open beam port.
Therefore, true drain time from a damaged beam port would be' considerably longer and actual decay heat much lower than assumed in the foregoing analyses.
If you should have any further questions, please do not hesitate to contact me.
Reactor Director