ML091410044

From kanterella
Jump to navigation Jump to search
Public Meeting with Industry to Discuss PWR and BWR Materials Issues June 2 and 3, 2009
ML091410044
Person / Time
Site: Nuclear Energy Institute, Boiling Water Reactor Owners Group, PROJ0704, PROJ0669, PROJ0694
Issue date: 05/21/2009
From: Holly Cruz
NRC/NRR/DPR/PSPB
To: Rosenberg S
NRC/NRR/DPR/PSPB
Cruz, H D, NRR/DPR 415-1053
References
Download: ML091410044 (11)


Text

May 21, 2009 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Holly D. Cruz, Project Manager

/RA/

Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CATEGORY 2 PUBLIC MEETING WITH INDUSTRY TO DISCUSS TECHNICAL ISSUES ON PRESSURIZED WATER REACTOR (PWR) AND BOILING WATER REACTOR (BWR)

MATERIALS INITIATIVES DATE & TIME:

Tuesday, June 2, 2009, 8:00 a.m. - 5:00 p.m. and Wednesday, June 3, 2009, 8:00 a.m. - 12:30 p.m.

LOCATION:

Legacy Hotel 1775 Rockville Pike Rockville, MD 20852 PURPOSE:

To discuss technical issues on PWR and BWR Materials Initiatives with the Electric Power Research Institute (EPRI) Materials Reliability Program, EPRI BWR Vessels and Internals Project, EPRI Nondestructive Examination Center, and the PWR Owners Group Materials Initiative.

CATEGORY 2:

This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

MEETING CONTACT:

Holly D. Cruz, NRR Ted J. Sullivan, NRR 301-415-1053 301-415-2796 holly.cruz@nrc.gov ted.sullivan@nrc.gov Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

S. Rosenberg PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC INDUSTRY Terence Chan, NRR Chuck Wirtz, First Energy Ted Sullivan, NRR Denny Weakland, FirstEnergy Matthew Mitchell, NRR Jim Cirilli, Exelon Robert Hardies, NRR Christine King, EPRI Holly Cruz, NRR Robin Dyle, EPRI Joseph Williams, NRR Craig Harrington, EPRI Randy Stark, EPRI Greg Selby, EPRI Project No. 669, 689, 691, 694, 704

Enclosure:

Agenda cc w/encl: See next page

S. Rosenberg PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC INDUSTRY Terence Chan, NRR Chuck Wirtz, First Energy Ted Sullivan, NRR Denny Weakland, FirstEnergy Matthew Mitchell, NRR Jim Cirilli, Exelon Robert Hardies, NRR Christine King, EPRI Holly Cruz, NRR Robin Dyle, EPRI Joseph Williams, NRR Craig Harrington, EPRI Randy Stark, EPRI Greg Selby, EPRI Project No. 669, 689, 691, 694, 704

Enclosure:

Agenda cc w/encl: See next page DISTRIBUTION PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb HollyCruz TedSullivan JosephWilliams MatthewMitchell RobertHardies TerenceChan GeorgeBacuta MichelleHoncharik TanyaMensah StephenPhilpott RidsNrrLADBaxley RidsOpaMail PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

RidsNrrDe RidsDci ADAMS ACCESSION NO.: ML091410044 NRC-001 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME HCruz SRosenberg for DBaxley SRosenberg DATE 5/21/09 5/21/09 5/21/09 OFFICIAL RECORD COPY

PWR Owners Group Project No. 694 cc:

Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Mr. Anthony Nowinowski, Manager Owners Group Program Management Office Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 nowinowa@westinghouse.com

BWR Owners= Group Project No. 691 cc:

Mr. Richard Libra Executive Vice Chair, BWR Owners=

Group Exelon Generation Co, LLC 200 Exelon Way Mail Code KSA 2-N Kennett Square, PA 19348 Rick.libra@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)

Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 rich.anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen, Vice Chair Regulatory Response Group BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.

11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com Frederick Emerson BWROG, Project Manager Frederick.emerson@ge.com Mr. Ken A. McCall, Program Manager GE-Hitachi Nuclear Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.

Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.

410 S. Wilmington St.

PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com Mr. Ted Schiffley Vice Chairman, BWROG Exelon Generation Co., LLC.

Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 frederick.schiffley@exeloncorp.com Mr. Randy C. Bunt, Chair Regulatory Response Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 rcbunt@southernco.com

BWRVIP Project No. 704 cc:

Randy Stark, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Larry Steinert, EPRI BWRVIP Electric Power Research Institute 3420 Hillview Ave.

Palo Alto, CA 94304 rstark@epri.com rpathani@epri.com kwolfe@contractor.epri.com ldsteine@contractor.epri.com Bob Geier, Technical Chairman BWRVIP Assessment Committee Exelon Corporation Cornerstone II at Cantera 4300 Winfield Rd.

Warrenville, IL 60555 robert.geier@exeloncorp.com Dennis Rickertsen, Technical Chairman BWRVIP Mitigation Committee Southern Nuclear Operating Company P. O. Box 1295 (M/S B234)

Birmingham, AL 35201-1295 ddricker@southernco.com Paul J. Davison, Executive Chairman BWRVIP Assessment Committee PSEG Nuclear, LLC Salem/Hope Creek Nuclear Station 11 Yubas Ave.

Burlington, NJ 08016 paul.davison@pseg.com Denver Atwood, Chairman BWRVIP Repair Focus Group Southern Nuclear Operating Co.

Post Office Box 1295 40 Inverness Center Parkway (M/S B031)

Birmingham, AL 35242-4809 dgatwood@southernco.com Rich Ciemiewicz, Chairman BWRVIP Inspection Focus Group Exelon Corporation 200 Exelon Way, Suite 210 (M/S KSA 2-N)

Kennett Square, PA 19349 richard.ciemiewicz@exeloncorp.com Charles J. Wirtz, Technical Chairman BWRVIP Integration Committee FirstEnergy Corp.

Perry Nuclear Power Plant (M/S A250) 10 Center Road Perry, OH 44081 cjwirtz@firstenergycorp.com Oscar Limpias, Executive Chairman BWRVIP Integration Committee Entergy Nuclear Operations, Inc.

Echelon One 1340 Echelon Parkway.

Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue BWRVIP Vice Chairman V. P., Nuclear Engineering & Services Progress Energy, Inc.

410 S. Wilmington St. (M/S PEB6)

Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Richard Anderson BWRVIP Executive Oversight Committee Site Vice President FPL Energy Duane Arnold Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 rich_anderson@fpl.com Robert Carter, EPRI BWRVIP Assessment Manager Jeff Landrum, EPRI BWRVIP Inspection Manager EPRI NDE Center P.O. Box 217097 1300 W. T. Harris Blvd.

Charlotte, NC 28221 bcarter@epri.com jlandrum@epri.com Dennis Madison, Executive Chairman BWRVIP Mitigation Committee Site Vice President Southern Nuclear Operating Co.

Edwin I. Hatch Nuclear Plant US Hwy 1 N Baxley, GA 31515-2010 drmadiso@southernco.com

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Acting Vice President for Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 cblarsen@epri.com Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com

AGENDA FOR THE JUNE 2-3, 2009, PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) AND INDUSTRY REGARDING PRESSURIZED WATER REACTOR (PWR) AND BOILING WATER REACTOR (BWR) MATERIALS INITIATIVES June 2, 2009 Industry BWR Discussion Legacy Hotel-Breakout Room 1 9:00 a.m. to 12:00 p.m.

Documentation Submittals NRC Program Welds 12:00 p.m. to 12:15 p.m.

Public Comment 12:15 p.m.

Lunch 1:15 p.m. to 3:45 p.m.

Jet Pump Cracking Crack Growth Research and Development Mitigation Topics Inspection Schedules 3:45 p.m. to 4:00 p.m.

Public Comment 4:00 p.m.

Adjourn ENCLOSURE June 2, 2009 Industry PWR Discussion Legacy Hotel-Breakout Room 2 8:00 a.m. to 11:45 a.m.

Reactor Vessel Integrity Alloy 600/690 Mitigation and Testing Stainless Steel Research and Development Boric Acid Testing 11:45 a.m. to 12:00 p.m.

Public Comment 12:00 p.m.

Lunch 1:00 p.m. to 4:30 p.m.

PWR Nondestructive Examination (NDE)

Reactor Vessel Internals Regulatory Interaction 4:30 p.m. to 4:45 p.m.

General discussion of PWR and BWR Issues 4:45 p.m.

Public Comment 5:00 p.m.

Adjourn June 3, 2009 Industry Nondestructive Examination Legacy Hotel 8:00 a.m. to 12:00 p.m.

Mitigation/NDE Techniques Flaw Resolution Ultrasonic and Radiographic Testing Techniques High Density Plastic Pipe NDE NDE Mockups NDE Sizing Digital Radiography 12:00 to 12:30 p.m.

General NDE Discussion 12:30 p.m.

Adjourn