MONTHYEARML24276A1002024-10-0202 October 2024 Email: Perry LRA - Requests for Confirmatory Information (RCI) ML24276A1282024-10-0202 October 2024 LRA - Requests for Additional Information - Round 1 (Set 3) - Email to Applicant ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24241A1012024-08-28028 August 2024 LRA - Requests for Additional Information - Round 1 (Set 2)_Email to Applicant ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A2222024-07-0909 July 2024 LRA Changes - Selective Leaching Program (AMP XI.33) ML24192A2232024-07-0808 July 2024 License Renewal Clarification (AMP XI.33) ML24103A1262024-05-0808 May 2024 Email to Phil Lashley Decision on the Exemption Request for Perry ML24127A1992024-05-0606 May 2024 NRR E-mail Capture - (External_Sender) Perry License Renewal Scoping and Screening Breakout Question B.2.24 (Partial TRP-55) ML24103A1272024-05-0303 May 2024 Email to Phil Lashley Availability of Environmental Assessment for the Perry Exemption ML24120A3222024-04-26026 April 2024 Response from State of Oh Regarding Review of Environmental Assessment for Perry HI-STORM Exemption Request ML24120A3212024-04-25025 April 2024 Email to State of Oh Requesting Review of EA for Perry HI-STORM Exemption Request ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML24060A0392024-02-28028 February 2024 Email SUNSI Action: Perry Nuclear Power Plant, Unit 1, ISFSI, Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24052A0092024-02-16016 February 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-264 ML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions 2024-09-06
[Table view] |
Text
INITIAL DOCUMENT REQUEST INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION DOCUMENT REQUEST Inspection Procedures:
IP 60853, OnSite Fabrication of Components and Construction of an ISFSI IP 60856 Review of 10 CFR 72.212(b) Evaluations Inspector: Vijay Meghani (630) 829-9751, email: vijay.meghani@nrc.gov A. Information Requested for the In-Office Preparation Week The following information (paper or electronic, unless otherwise indicated) is requested to be available in Region III by May 15, 2009 or earlier where possible.
Please call the inspector if you have any questions.
- 1) A copy of the following documents related to the outdoor concrete storage pad / haul path design during independent spent fuel storage installation:
- i. Calculations, modifications, evaluations (10CFR50.59 or 10CFR72.48) associated with evaluation of buried utilities and the haul path for transport of Independent Spent Fuel Storage Installation ii. Calculations, modifications, evaluations (10CFR50.59 or 10CFR72.48) associated with the evaluation of ISFSI pad for design/licensing basis loading conditions (ISFSI pad design) including the pad design, dynamic analysis, tip over analysis, soil investigation report, soil structural analysis, soil liquefaction analysis, etc. as applicable.
iii. Corrective Action Program reports related to ISFSI iv. The following Geotechnical Calculations and Reports (which may satisfy some of the documents requested above):
- 1. G58-S-G-001
- 2. G58-S-G-002
- 3. G58-S-G-003
- 4. G58-S-G-004
- 5. G58-S-G-005
- 6. G58-S-G-006
INITIAL DOCUMENT REQUEST
- 7. G58-S-G-007
- 8. G58-S-R-G-008
- 9. G58-S-R-G-009
- 10. G58-S-R-G-010
- 2) An electronic copy of the UFSAR.
- 3) C of C, FSAR, Technical Specification for the spent fuel storage casks