Summary of Meeting Between NRC Region III Management and Exelon Generation Company Representatives to Discuss the Nrc'S Assessment
ML091180297
Person / Time
Site: Quad Cities, 05000365  Constellation icon.png
Issue date: 04/28/2009
From: Ring M
NRC/RGN-III/DRP/B1
To:
References
Download: ML091180297 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 28, 2009 LICENSEE: Exelon Generation Company, LLC FACILITY: Quad Cities Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE APRIL 7, 2009, PUBLIC MEETING TO DISCUSS THE QUAD CITIES STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 7, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Best Western SteepleGate Inn in Davenport, Iowa. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Quad Cities Station, Units 1 and 2, for the period from January 1 through December 31, 2008. The NRC letter and meeting notice for this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML090780748 and ML090780766, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Quad Cities Station, Units 1 and 2, in calendar year 2008, which was documented in the March 4, 2009, End-Of-Cycle assessment letter, as ML090630361. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. The presentations, including the licensees presentation, are documented as ML091180214 and ML091180225. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA J. Benjamin, Acting For/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-365;72-053 License Nos. DPR-29; DPR-30

Enclosure:

As Stated DISTRIBUTION See next page

April 28, 2009 LICENSEE: Exelon Generation Company, LLC FACILITY: Quad Cities Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE APRIL 7, 2009, PUBLIC MEETING TO DISCUSS THE QUAD CITIES STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 7, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Best Western SteepleGate Inn in Davenport, Iowa. The meeting was between NRC Region III management and Exelon Generation Company management to discuss the NRCs assessment of the safety performance of Quad Cities Station, Units 1 and 2, for the period from January 1 through December 31, 2008. The NRC letter and meeting notice for this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML090780748 and ML090780766, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Quad Cities Station, Units 1 and 2, in calendar year 2008, which was documented in the March 4, 2009, End-Of-Cycle assessment letter, as ML090630361. As part of this regulatory performance meeting, Exelon briefly responded to the NRCs assessment. The presentations, including the licensees presentation, are documented as ML091180214 and ML091180225. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA by J. Benjamin, Acting For/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-365;72-053 License Nos. DPR-29; DPR-30

Enclosure:

As Stated DISTRIBUTION See next page DOCUMENT NAME: G:\1-SECY\1-WORK IN PROGRESS\QUAD 2008 EOC MTG

SUMMARY

.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JBenjamin for MRing:cms DATE 04/28/09 OFFICIAL RECORD COPY

Memo to C. Pardee from M. Ring dated April 28, 2009

SUBJECT:

SUMMARY

OF THE APRIL 7, 2009, PUBLIC MEETING TO DISCUSS THE QUAD CITIES STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Manager Regulatory Assurance -

Quad Cities Nuclear Power Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency M. Rasmusson, State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security Chairman, Rock Island County Board Rock Island County Sheriff Coordinator, Rock Island Emergency Services and Disaster Chairman, Whiteside County Board Whiteside County Sheriff Coordinator, Whiteside County Emergency Services Chairman, Board of Supervisors Clinton County Sheriff Coordinator, Clinton County Emergency Management Scott County Administrator Scott County Sheriff Coordinator, Scott County Emergency Management Mayor of Albany Mayor of Rapids City President, Village of Port Byron President, Village of Cordova Mayor of Camanche Mayor of Clinton Clinton City Administrator Mayor of Low Moor Mayor of LeClaire LeClaire City Administrator Mayor of Princeton Mayor of McCausland G. Mortensen, INPO

Memo to C. Pardee from M. Ring dated April 28, 2009

SUBJECT:

SUMMARY

OF THE APRIL 7, 2009, PUBLIC MEETING TO DISCUSS THE QUAD CITIES STATION, UNITS 1 AND 2, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-2 RidsNrrPMQuad Cities RidsNrrDirsIpab Resource Patrick Hiland Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

PUBLIC MEETING PRINCIPAL ATTENDEES April 7, 2009 NRC M. Ring, Chief, Branch 1, Division of Reactor Projects, Region III J. McGhee, Senior Resident Inspector, Quad Cities Station B. Cushman, Resident Inspector, Quad Cities Station T. Ray, Resident Office Assistant, Quad Cities Station H. Logaras, State and local Official Liaison, Region III V. Mitlyng, Public Affairs Officer, Region III Exelon Generation Company - Quad Cities T. Tulon, Site Vice President R. Gideon, Plant Manager W. Beck, Regulatory Assurance Manager J. Burkhead, Nuclear Oversight Manager D. Collins, Radiation Protection Manager S. DeVore, Communications Manager K. Donovan, Maintenance Deputy Director J. Hansen, Licensing Manager, Corporate Office H. Madronero, Engineering Director T. Petersen, Principal Regulatory Engineer S. Specht, Outage Manager B. Stoermer, Public Affairs Manager M. Sullivan, Project Management Manager R. Svaleson, Operations Director P. Tzomes, Emergency Preparedness Manager K. Moser, Training Manager V. Neels, Chemistry Manager MidAmerican Energy Company D. Tubbs, Manager of Nuclear Illinois Department of Public Health M. Rasmusson, Iowa State Liaison Officer and Chief of Iowa Bureau of Radiological Health Illinois Emergency Management Agency C. Mathews, Resident Inspector Scott County Emergency Management R. Bergen, Emergency Management Director Staff Members from the Office of Congressman Phil Hare P. OBrien J. Stone Public H. Neels Enclosure