MONTHYEARIR 05000333/20240902024-10-29029 October 2024 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090 JAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation IR 05000333/20244022024-10-28028 October 2024 Material Control and Accounting Program Inspection Report 05000333/2024402 (Cover Letter Only) ML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24207A0192024-10-0909 October 2024 SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation 2024-09-04
[Table view] |
Text
/
U. S. NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions. If paid by check, Invoice No.: RL0314-09 make check payable to the NRC (reference Invoice no.) and mail to:
U.S. Nuclear Regulatory Commission Invoice Date: 01/21/09 Accounts Receivable Team P.O. Box 979051 St. Louis, MO 63197-9000
Contact:
BILLY BLANEY Phone: 301/415-5092 TO: ENTERGY NUCLEAR OPEARTIONS,INC ATTN: MS THERESA KNIGHT P.O. BOX 110 LYCOMING, NY 13093-0000 Docket: 050-00333 Period: 09/14/08 - 12/20/08 FITZPATRICK Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 287.7 HRS @ $238.00 $ 68,472.60 Contract Costs: $ 18,044.00 Project Manager: $ 15,041.60 AMOUNT DUE $ 101,558.00 TERMS. Interest will accrue from the invoice date at the annual rate of 3.000 %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinquent invoice. Additional terms and conditions are attached, if applicable.
NOTES. If there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.
03/05/09 11:39:50 Page Number: 1 Detail Line For Invoice RL0314-09 For the Period 09/14/08 - 12/20/08 Job Docket Reg NonReg Contractual Cost Applicnt Code Number TAC/B&R Hours Hours Rate Hourly Costs PM Costs Costs Date Date Names/Remarks 050-00333 MD8556 61.7 2.0 238.00 15,160.60 0.00 0.00 / 04/22/08 FITZPATRICK - Amendment to TS Regarding Relocation of P-T Cu 050-00333 MD8717 14.0 1.0 238.00 3,570.00 0.00 0.00 / 04/30/08 FITZPATRICK - Plant Inservice Inspection Program Relief Requ 050-00333 MD9780 61.0 0.0 238.00 14,518.00 0.00 0.00 / 09/26/08 FITZPATRICK - James A. FitzPatrick Request for Relief (RR-7) 050-00333 MD9782 20.5 1.0 238.00 5,117.00 0.00 0.00 / 09/30/08 FITZPATRICK - License Amendment Request for Licensee Name Ch 050-00333 111104 11.0 0.5 238.00 0.00 2,737.00 0.00 / / / PM - OTHER LICENSING TASKS - (H) 050-00333 122122F 39.0 5.5 238.00 0.00 10,591.00 0.00 / / / PM - PM LICENSEES/REGIONAL/HQ STAFF INTERFACES 050-00333 MD7927 53.0 4.5 238.00 13,685.00 0.00 0.00 / 01/22/08 FITZPATRICK - Revise Tech Specs per TSTF-374 and TSTF-501, E 050-00333 MD8556 69.0 0.0 238.00 16,422.00 0.00 0.00 / 04/22/08 FITZPATRICK - Amendment to TS Regarding Relocation of P-T Cu 050-00333 111100AA 6.0 0.0 238.00 0.00 1,428.00 0.00 / / / PM - PH LICENSEE INTERFACES 050-00333 9AIA 0.9 0.3 238.00 0.00 285.60 0.00 / / / PM - GENERAL ADMINISTRATION J3217 050-00333 MD8717 0.0 0.0 0.00 0.00 0.00 17,401.00 2008/09 / / FITZPATRICK - Plant Inservice Inspection Program Relief Requ J3217 050-00333 MD8717 0.0 0.0 0.00 0.00 0.00 397.00 2008/11 / / FITZPATRICK - Plant Inservice Inspection Program Relief Requ J3217 050-00333 1w8717 0.0 0.0 0.00 0.00 0.00 246.00 2008/10 / / FITZPATRICK - Plant Inservice Inspection Program Relief Requ 336.1 14.8 68,472.60 15,041.60 18,044.00 Total Invoice Cost: 101,558.00
U. S. NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions. If paid by check, Invoice No.: RS0173-09 make check payable to the NRC (reference Invoice no.) and mail to:
U.S. Nuclear Regulatory Commission Invoice Date: 01/19/09 Accounts Receivable Team P.O. Box 979051 Docket No: 050-00333 St. Louis, MO 63197-9000 License No: DPR-59 TO: ENTERGY NUCLEAR OPEARTIONS,INC
Contact:
BILLY BLANEY FAC: FITZPATRICK ATTN:MS THERESA KNIGHT Phone: 301-415-5092 P.O. BOX 110 LYCOMING, NY 13093-0000 Period: 09/14/08 - 12/20/08 Part 50 Routine/Reactive Inspections, Investigations Routine Manpower Fees: $ 400,615.60 Non-Routine Manpower Fees: 0.00 Resident Inspector Fees: 47,243.00 Subtotal Staff Hour Fees: $ 447,858.60 Contract Costs: $ 0.00 Common Costs: $ 0.00 Total Billed Amount: $ 447,859.00 REVENUE CODE: AMOUNT DUE $ 447,859.00 TERMS. Interest will accrue from the invoice date at the annual rate of 3.000 %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinquent invoice. Additional terms and conditions are attached, if applicable.
NOTES. If'there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.
03/05/09 11:48:46 Page Number: - 1 Report Line Items For Hours Included on Invoice RS0173-09 For the Period 09/14/08 - 12/20/08 Docket No: 050-00333 Total Routine NonRtine Total NonRoutine Total Resident Report Report Routine Non-Reg Routine Hourly Fees NonRtine Non-Reg NonRtine Hourly Fees Insp Regular Non-Reg Resident Fees Number Sent Hours Hours Hours Rate Amount Hours Hours Hours Rate Amount Site Init Hours Hours Hours Rate Amount Totals 2008004 11/07/08 837.6 52.0 889.6 238.00 211724.80 0.0 0.0 0.0 238.00 0.00 211724.80 2008004 11/07/08 289.1 3.7 292.8 258.00 75542.40 0.0 0.0 0.0 258.00 0.00 75542.40 12008008 09/02/08 6.0 0.0 6.0 238.00 1428.00 0.0 0.0 0.0 238.00 0.00 1428.00 2008008 09/02/08 396.8 37.0 433.8 258.00 111920.40 0.0 0.0 0.0 258.00 0.00 111920.40 FITZ GPH 62.0 5.0 67.0 238.00 15946.00 15946.00 FITZ SPU 70.0 0.0 70.0 238.00 16660.00 16660.00 FITZ GPH 5.5 0.0 5.5 238.00 1309.00 1309.00 FITZ SPU 44.0 12.0 56.0 238.00 13328.00 13328.00 1529.5 92.7 1622.2 400615.60 0.0 0.0 0.0 0.00 181.5 17.0 198.5 47243.00 447858.60