Category:Drawing
MONTHYEARML14125A2702014-05-0202 May 2014 Missing Jam Nuts on Size 4, Pressure Class 600 Normally Open, In-Line Check Valve Per Flowserve Drawing No. 07-45546-01 ML13038A5042013-01-13013 January 2013 License Renewal Application, Drawing LRA-1,2-47W852-2, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains. ML13038A3452013-01-0202 January 2013 License Renewal Application, Drawing LRA-1-47W838-2, Revision 0, Flow Diagram - Mechanical Condensate Demineralizer Unit 1 Condensate Polishers ML13038A5222012-12-13013 December 2012 License Renewal Application, Drawing LRA-1,2-47W856-1, Revision 0, Flow Diagram Demineralized Water and Cask Decon System. ML13038A5072012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-4, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains. ML13038A4702012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W844-4, Revision 0, Mechanical Flow Diagram Raw Cooling Water. ML13038A4772012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W848-1, Revision 0, Compressed Air System Flow Diagram. ML13038A5062012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-3, Revision 0, Mechanical Flow Diagram Floor and Equipment Drains. ML13038A5082012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-5, Revision 0, Mechanical Flow Diagram Roof Dr & Floor Eqpt Dr. ML13038A5092012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-6, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains. ML13038A5592012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W881-8, Revision 0, Mechanical Flow Diagram Water Quality and Sampling System. ML13038A3822012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W814-1, Revision 0, Flow Diagram Ice Condenser System. ML13038A4562012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W834-2, Revision 0, Flow Diagram Make Up Water Treatment and Demineralizers. ML13038A4732012-12-0303 December 2012 License Renewal Application, Drawing LRA-1,2-47W845-2, Revision 0, Mechanical Flow Diagram - Essential Raw Cooling Water System. ML13038A4962012-11-30030 November 2012 License Renewal Application, Drawing LRA-1,2-47W850-5, Revision 0, Flow Diagram - Transformer Yard & Makeup Water Treatment Plant Hpfp. ML13038A3642012-11-30030 November 2012 License Renewal Application, Drawing LRA-1-47W881-1, Revision 0, Flow Diagram Water Quality and Sampling System ML13038A3882012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W816-2, Revision 0, Flow Diagram Diesel Generator Lube Oil System. ML13038A3792012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W810-1, Revision 0, Flow Diagram Residual Heat Removal System. ML13038A4612012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W838-4, Revision 0, Mechanical Flow Diagram Waste Disposal. ML13038A4622012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W838-7-1, Revision 0, Mechanical Flow Diagram Filter System and Utilities. ML13038A3702012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W805-4, Revision 0, Flow Diagram High Pressure and Low Pressure Heater Drains and Vents. ML13038A4592012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-2, Revision 0, Flow Diagram Potable Water Distribution System. ML13038A4602012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-4, Revision 0, Flow Diagram Potable Water Distribution System. ML13038A3672012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W803-3, Revision 0, Flow Diagram Auxiliary Feedwater. ML13038A3592012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W801-2, Revision 0, Flow Diagram Steam Generator Blowdown System. ML13038A3692012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W805-3, Revision 0, Flow Diagram High Pressure and Low Pressure Heater Drains and Vents. ML13038A3662012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W803-2, Revision 0, Flow Diagram Auxiliary Feedwater. ML13038A3362012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W802-1, Revision 0, Flow Diagram Extraction System ML13038A3782012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-7, Revision 0, Flow Diagram Flood - Mode Boration Makeup System. ML13038A3752012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-4, Revision 0, Flow Diagram CVCS Chemical Control. ML13038A3762012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-5, Revision 0, Flow Diagram CVCS Chemical Control. ML13038A3722012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-2, Revision 0, Flow Diagram CVCS Chemical Control. ML13038A3682012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W804-2, Revision 0, Flow Diagram Condensate. ML13038A3742012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-3, Revision 0, Flow Diagram CVCS Chemical Control. ML13038A5762012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W807-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping. ML13038A3572012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W801-1, Revision 0, Flow Diagram Condensate ML13038A3382012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W805-01, Revision 0, Flow Diagram High Pressure Heater Drains and Vents ML13038A3402012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W807-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping ML13038A4582012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-1, Revision 0, Flow Diagram Potable Water Distribution System. ML13038A3372012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W804-1, Revision 0, Flow Diagram Condensate ML13038A5802012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W811-2, Revision 0, Flow Diagram Mechanical SIS Upper Head Injection Abandoned in Place. ML13038A5772012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W809-1, Revision 0, Flow Diagram Chemical & Volume Control System ML13038A5752012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W805-2, Revision 0, Flow Diagram Low Pressure Heater Drains & Vents. ML13038A5742012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W805-1, Revision 0, Flow Diagram High Pressure Heater Drains and Vents. ML13038A5732012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W804-1, Revision 0, Flow Diagram Condensate. ML13038A5722012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W802-1, Revision 0, Flow Diagram Extraction Steam. ML13038A3412012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W809-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping ML13038A3432012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W811-2, Revision 0, Flow Diagram Mechanical SIS Upper Head Injection Abandoned in Place ML13038A3392012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W805-2, Revision 0, Flow Diagram Low Pressure Heater Drains & Vents ML13038A3612012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W803-1, Revision 0, Flow Diagram Feedwater. 2014-05-02
[Table view] Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] |
Text
Tennessee Valley Authority Post Office Box 2000 Soddy Daisy, Tennessee 37384-2000 Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant April 14, 2009 Department of the Army Offices U.S. Army Corps of Engineers Eastern Regulatory Field Office 501 Adesa Blvd, Suite 250 L~oir City, Tennessee 37771 7
Dea U.S. Army Corps of Engineers, TENIRIESSEE VALLEY AUTHORITY (TVA) - SEQUOYAH NUCLEAR PLANT (SQN)- JOINT APPLICATION FORM DEPARTMENT OF ARMY/TVA -
CONDENSER CIRCULATING WATER (CCW) INTAKE CHANNEL BANK STABILIZATION Enclosed are a Joint Application Form Department of the Army/TVA, a site map (Figure 1), a contour map of the CCW Intake Channel (Figure 2), photos of the bank erosion (Figures 3 and 4), CCW Intake Channel bank erosion remediation drawing (Figure 5), a shoreline rock riprap drawing (Figure 6), and a Snow Hill 7.5 minute quadrangle (Figure 7).: These enclosed maps and drawings are of the bank stabilization work to be performed at the Sequoyah Nuclear Plant in Hamilton County, Tennessee.
The bank stabilization consists of the removal of undercut trees along the south bank of the CCW intake channel (this area is located inside the skimmer wall of the Sequoyah Nuclear Plant. and not on the Tennessee River shoreline), with minimal reshaping and excavation to improve the bank slope. Cleared trees and brush will be chipped into mulch and placed in a spoils area onsite above the 500 year floodplain. Other debris such as dirt, sand, and rock will be spread onsite also above the 500 year floodplain. The bank will then be stabilized with approximately 12-24 inches of 6-12 inch rip-rap. Sand or crusher run may be used as fill material as necessary. The approximate linear length of the bank to be reshaped and stabilized is 450 feet, located inside the skimmer wall area at approximately Tennessee River mile (TRM) 484.7. Approximately 70 cubic yards flrintedi nn rnlvnlnrd nflfler printQd on recycled paper
of rip-rap will be placed below the normal summer water elevation of 682.5. The area in which rip-rap will be applied above the water level will vary as the ground slope varies along the shoreline. Appropriate Best Management Practices (BMPs) will be employed throughout the duration of this project and no significant adverse environmental impacts are anticipated. It is preferable that as much of the work as possible be performed before the Tennessee River reaches its normal summer water elevation; therefore, TVA requests expedited approval so that the work can proceed.
If you have any questions or need additional information, please contact Ann Hurt at (423) 843-6714 or Stephanie Howard at (423) 843-6700 of Sequoyah's Environmental staff.
Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Enclosures cc (Enclosures):
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 J. Scott Lea TVA Office (Chickamauga, Nickajack) 1101 Market Street, PSC 1E-C Chattanooga, TN 37402-2801
.OMB No. 3316-0060 JOINT APPLICATION FORM Department of the Army/TVA Paperwork Reduction Act Statement - Public reporting burden for this collection of information is estimated to average 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the .data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection ofinformation, including suggestions for reducing this burden to Agency Clearance Officer, Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402; and to the Office of Management and Budget, Paperwork Reduction Project (3316-0060), Washington, D.C. 20503.
The Department of the Army (DA) permit program is authorized by Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (P.L.95-217). These laws require permits authorizing structures and work in or affecting navigable waters of the United States and the discharge of dredged or fill material into waters of the United States. Section 26a of the Tennessee Valley Authority Act, as amended, prohibits the construction, operation, or maintenance of any structure affecting navigation, flood control, or public lands or reservations across, along, or in the Tennessee River or any of its tributaries until plans for such construction, operation, and maintenance have been submitted to and approved by the Tennessee Valley Authority (TVA).
Name and Address of Applicant: Name, Address, and Title of Authorized Agent:
Timothy P. Cleary, TVA Sequoyah Nuclear Plant Site Vice President Same as Applicant TVA Sequoyah Nuclear Plant, Sequoyah Access Road P.O. Box 2000, Mail Stop: OPS-4A-SQN r~i~v ...[.e .n * .s~~ee .3..3Z. ....................................................................................
.Soddv.D d.................. .... ..........
Telephone Number: Home ............................. Telephone Number: Home _.
Office (.....843.00 .. .Office. .........................
Location where activity exists or will occur (include Stream Name and Mile, if known):
[Sequoyah Nuclear Plant Intake Forebay COW Channel, Tennessee River (Hamilton County, Tennessee)
Application submitted to "DA rITVA Date activity is proposed to commence: ,05/04/2009 activity is proposed to be completed: 0Date 08/28/2009 Describe in detail the proposed activity, its purpose and intended use (private,public, commercial, or other). Describe structures to be erected including those placed on fills, piles, or floating platforms. Also describe the type, composition, and quantity of materials to be discharged or placed in the water; the means of conveyance; and the source of discharge or fill material. Please attach additional sheets if needed.
'The repair consists of the removal of undercut trees along the south bank of the intake channel, with minimal reshaping and excavation to improve the bank slope. The bank will then be stabilized.with approximately 12-24
- Jinches of 6 - 12 inch rip-rap. Sand or crushed stone may be used as fill material as necessary. The approximate
,linear length of the bank to be reshaped and stabilized is 450 feet. Approximately 70 cubic yards of stone will be
!placed below the normal high water elevation. The area in which rip-rap will be applied above the water level will Wvary as the ground slope varies. Remove undercut trees along the bank of the CCW Intake Channel. Trees and other debris that may eventually release from the bank into the intake channel present possible plant operability issues. Also, the bank is to be reshaped in order to apply rip-rap to add stability and prevent further erosion.
Application is hereby made for-approval of the activities described herein. I certify that I am familiar with the information contained in this application, and that to the best of my knowledge and belief such information is true, complete, and accurate. I further certify that I possess the authority to undertake the proposed activities. I agree that, if this application is approved by IVA, I will comply with the attached terms and conditions and any special conditions that may be imposed by TVA at the time of approval. Please note the U.S. Army Corps of Engineers may impose additional conditions or restrictions.
I "- , "- -,- _Iq_ 'A-?-IZ---
Date Si ature of Appliant 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any depa rIment or agenye of The United States knowingly and willfully falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any. false, ffictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statement or entry, shall be fined not more than $10,000 or imprisoned not more than five years, or both. The appropriate DA fee will be assessed when a permit is issued.
"I"/A 17A9"4 ro.9nn*n- 1 m-,f 9
Names, addresses, and telephone numbers of adjoining property owners, lessees, etc., whose properties also join the waterway:
Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant List of previous DA/TVA permits/approvals fl DA "TVA L.................A.......
Permit Number Date Is any portion of the activity for which authorization is sought now complete? [ Yes [T No (If "Yes" attach explanation)
Month and year the activity was completed: ................. .................. ..... Indicate the existing work on the drawings.
List all approvals or certifications required by other federal, interstate, state, or local agencies for any structures, construction, discharges, deposits, or other activities described in this application.
Issuing Agency Type Approval Identification No. Date of Application Date of Approval
... ... ... ................ .......... ... I.'.... ... ... ... ... .... ... ... ... ..... . :,.' . ... ... .... ... ... ... ... .... ... .
Has any agency denied approv*al for the activity described herein or for any activity directly related to the activity described herein?
r-l Yes C] No (If "Yes" attach explanation)
Privacy Act Statement This information is being requested in accordance with Section 26a of the TVA Act as cited on the front page of this form. Disclosure of the information requested is voluntary; however, failure to provide any required information or documents may result in a delay in processing your application or in your being denied a Section 26a permit. An application that is not complete will be returned for additional information. TVA uses this information to assess the impact of the proposed project on TVA programs and the environment and to determine if the project can be approved. Information in the application is made a matter of public record through issuance of a public notice if warranted. Routine uses of this information include providing to federal, state, or local agencies, and to consultants, contractors, etc., for use in program evaluations, studies, or other matters, involving support services to the program; to respond to a congressional inquiry concerning the application or Section 26a program; and for oversight or similar purposes, corrective action, litigation or law enforcement.
Project plans or drawings should accompany the application. These should be on paper suitable for reproduction no larger than 11 x 17 inches or contained on a 3-1/2 inch floppy computer disc in "dxf" format, and should be submitted to the appropriate TVA and U.S.
Army Corps of Engineers offices. An application that is not complete will be returned for additional information Department of the Army Offices TVA Office Locations U.S.Army Engineer District, Nashville (Boone Dam Vicinity) (Ocoee 1,2,3)
Corps of Engineers 106 Tri-Cities BusinessPark Drive 221 Old Ranger Road Attention: Regulatory Branch Gray, TN 37615 Murphy, NC 28906 3701 Bell Road Nashville, Tennessee 37214 (Cherokee, Douglas, Nolichucky) (Chickamauga, Nickajack)
Phone: (615) 369-7500 3726 E. Morris Blvd 1101 Market Street, PSC 1E-C Morristown, TN 37813 Chattanooga, TN 37402-2801 U.S. Army Corps of Engineers Eastern' Regulatory Field Office (Guntersville, Tims Ford 501 Adesa Blvd, Suite 250 (Watts Bar, Melton Hill, Norris) Normandy)
Lenoir City, TN 37771 Watts Bar-Clinch Watershed Team 3696 Alabama Hwy 69 Phone: (865) 986-7296 260 Interchange Park Dr Guntersville, AL 359 Lenoir City, TN 37772 U.S. Army Corps of Engineers (Pickwick, Wheeler, Wilson Western Regulatory Field Office (Ft. Loudoun, Tellico) Bear Creek) 2042 Beltline Road, SW Little Tennessee Watershed Team P.O. Box 1010 Bldg. C, Suite 415 260 Interchange Park Dr. Muscle Shoals, AL 35662 Decatur, AL 35601 Lenoir City, TN 37772 Phone: (256) 350-5620 (Kentucky) 2835-A East Wood Street Paris, TN 38242
P;miri:- I - qPniinimb Mnolpnr Plnnt I
/
Figure 2: Intake Channel Topography - 2' Contours, E-tE22738C0 E2273800t CROSSSECTION 2
Locations
~
+ E2271600 E2271500+
?
ire I: Slone Remediatinn and Placement of Rin-Ran ure 4: Examnle of I Jndercut Trees
v I ,
S(.QUo'AM, W)tLEP. PROJECT SHEET OF 'IGUR*, 6 SHEET CALC. I.D.
SCALCULATION Prepared by - Mate3 u-09 Checked by Date
SUBJECT:
SMW .INTAK.E C.,ANNE(. BANK ER:-SJ(N REFERENCES RE)FD JATIGN~
g )KAIAPL6.
EXISTING 8ANK. PROiPIL.
(IUI~A1* RPO. W PAQw059-P 8AIV14.. M~FILE J.
IVA 10738C (ONEb-6-7)
NOTE: INCLUDE ALL DIMENSIONS AND ELEVATIONS WHERE INDICATED
-SHORELINE TO BE STABIUZED TO BE PLAN SHOWING PLAN SHOWING EXISTING SHORELINE STABILIZED SHORELINE NORMAL CUBIC YARDS OF FILL SUMMER WATER 70 cubic yards RipRap SECTION SHOWING EXISTING SHORELINE TOP OF ROCK RIPRAP e685' to 700' ROCK RIPRAP INFORMA PPROJEECT LOCATION a
APPLICANT . SHORELINE Timothy P. Cleary RESERVOIR Chirkamauiga TRACT NUMBER SUBDIVISION LOT NO. I RIVER Tennessee RIVER MILE approx. TRM 484.7
,.'.~<..,. I VI1486 I 4H býHorizontal cl kdlometer' (3300 feet) 0 \Vert cal Scale Kilom'eter (3300 feet)
,. x-'
ni Gaging station S" DSN 11-7'
~CNC) - -.z~ ý ERCW' Intake.,,
DSN11I A
ý,I .
..- > .... e
/c4 N 4% Towers 2
F" gge P'oin S 10 ..
SEQUOYAH NUCLEAR PLANT Soddy-Daisy, Hamilton County, Tennessee Snow Hill 7.5 minute Quadrangle Figure 7