ML090930060
| ML090930060 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/02/2009 |
| From: | Heather Gepford Reactor Projects Region 2 Branch 6 |
| To: | Swafford P Tennessee Valley Authority |
| References | |
| Download: ML090930060 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 3 PUBLIC MEETING/OPEN FORUM, SEQUOYAH NUCLEAR PLANT, DOCKET NOS. 50-327 AND 50-328
Dear Mr. Swafford:
This letter informs you of a Category 3 public meeting/open forum which has been scheduled for April 15, 2009, at 5:00 p.m. (EDT). The purpose of the meeting is to discuss with the public the NRCs Reactor Oversight Process and the annual assessment of your Sequoyah Nuclear Plant performance. The meeting notice, which provides additional details, is enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4659.
Sincerely,
/RA/
Heather J. Gepford, Acting Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosure:
As stated cc w/encl.: (See page 2)
X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE LG HG NAME LGarner HGepford DATE 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 2
cc w/encl:
Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority Electronic Mail Distribution William R. Campbell Senior Vice President Fleet Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Place Chattanooga, TN 37402-2801 Christopher R. Church, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Thomas Coutu, Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution Michael J. Lorek, Vice President Nuclear Engineering & Projects Tennessee Valley Authority Electronic Mail Distribution Timothy P. Cleary, Site VP Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Ludwig E. Thibault, General Manager Nuclear Oversight & Assistance Tennessee Valley Authority 3R Lookout Place 1101 Market Steet Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority Electronic Mail Distribution Fredrick C. Mashburn, Acting Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Lawrence Edward Nanney Director Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution County Mayor Hamilton County Hamilton County Courthouse Hamilton County Courthouse Chattanooga, TN 37402-2801 Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority Electronic Mail Distribution Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority Electronic Mail Distribution James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854
TVA 3
Letter to Preston D. Swafford from Heather J. Gepford dated April 2, 2009
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 3 PUBLIC MEETING/OPEN FORUM, SEQUOYAH NUCLEAR PLANT, DOCKET NOS. 50-327 AND 50-328 Distribution w/encl:
Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Regional Counsel Region II State Liaison Officer Region II Public Affairs Officers Region II Resource Management Branch Chief Region II Receptionist R. Pascarelli, NRR ((Regulatory Conferences Only))
RidsNrrPMSequoyah Resource Headquarters Operations Officer RIDSNRRDIRS OEMAIL PUBLIC
Enclosure
SUBJECT:
PUBLIC MEETING/OPEN FORUM REGARDING SEQUOYAH NUCLEAR PLANT ANNUAL ASSESSMENT FACILITY:
Sequoyah Nuclear Power Plant DOCKETS:
50-327 and 50-328 DATE & TIME:
Wednesday, April 15, 2009 5:00 p.m. to 7:00 p.m. (EDT)
LOCATION:
Sequoyah Training Center 2600 Igou Ferry Road, Soddy Daisy, TN, 37379 PURPOSE:
The purpose of this meeting/open forum is to provide opportunities to discuss with the public the NRC Reactor Oversight Process and the annual assessment of the Sequoyah Nuclear Plant performance. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS ML090630432) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/seq_2008q4.p df. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
CATEGORY:
This is a Category 3 meeting: The public is invited to fully participate in this meeting/open forum.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE(S)
PARTICIPATING:
Region II (RII)
OTHER ORGANIZATIONS PARTICIPATING:
None PARTICIPANTS:
NRC (partial list)
H. Gepford, Acting Chief, Reactor Projects Branch 6, Division of Reactor Projects (DRP), RII C. Young, Senior Resident Inspector, DRP, RII M. Speck, Resident Inspector, DRP, RII MEETING CONTACT:
Heather J. Gepford, NRC, RII 404-562-4659 Heather.Gepford@nrc.gov AUDIO TELE-CONFERENCE:
Not available VIDEO TELE -
CONFERENCE:
Not available