ML090910150
| ML090910150 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 04/02/2009 |
| From: | Joel Wiebe Watts Bar Special Projects Branch |
| To: | Tennessee Valley Authority |
| Wiebe, Joel NRR/DORL/LPL3-2, 415-6606 | |
| Shared Package | |
| ML090770080 | List: |
| References | |
| TAC MD9182 | |
| Download: ML090910150 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 2, 2009 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Power Plant, Unit 2 SUB~IECT:
SUMMARY
OF MARCH 17, 2009, MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING CORRECTIVE ACTION PROGRAM (CAP)
FOR CABLE ISSUES AT WATTS BAR NUCLEAR PLANT UNIT 2 (TAC NO. MD9182)
On March 17, 2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of TVA at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1) technical issues related to the electrical cable issues CAP as discussed in TVA's response dated January 14, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090210473), to an NRC request for additional information dated November 25, 2008 (ADAMS Accession No. ML083260202) and (2) the scope of certain electrical issues presented in the September 26,2008, TVA letter (ADAMS No. ML082750019).
A list of attendees is provided as Enclosure 1.
The licensee presented information (ADAMS Accession No. ML090771062) and discussed their January 14, 2009, response. The discussion included clarifications and additional detail needed for the staff's review.
The staff queried the licensee to provide additional needed clarification and detail regarding technical issues related to the licensee's January 14, 2009, response and the licensee's presentation. The clarifications and additional detail requested is provided as Enclosure 2.
The licensee agreed to respond to the requested items in writing.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
- 2 Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
- 1. List of Attendees
- 2. Requested Clarifications and Additional Detail cc w/encls: Distribution via Listserv
LIST OF ATTENDEES MARCH 17.2009, MEETING WITH TENNESSEE VALLEY AUTHORITY CORRECTIVE ACTION PROGRAM FOR CABLE ISSUES AT WATTS BAR NUCLEAR PLANT (WBN), UNIT 2 Nuclear Regulatory Commission
Participants:
L. Raghavan Branch George Wilson Robert Haag Parick Milano Joel Wiebe Roy Mathew Matthew McConnell Prem Sahay Position/Title Chief Chief Chief Sr. Project Manager Sr. Project Manager Electrical Team Leader Electrical Engineer Electrical Engineer Organization Watts Bar Special Project Branch (WBPB),
Electrical Engineering Branch (EEEB)
Construction Projects Branch 3. Region II WBPB/DORL WBPBIDORL EEEB EEEB EEEB Tennessee Valley Authority (TVA)
Participants:
Masoud Bajestani Kent Brown Gordon Arent Izhar Khan Mike Shulman Steven Hilmes Vice President, WBI\\l Unit 2 Manager, Electrical/Instrumentation and Controls, Corporate Engineering Manager, New Generation Licensing, WBN Unit 2 Consulting Engineer, WBN Unit 2 Licensing, WBN Unit 2 Engineering, WBN Unit 2
REQUESTED CLARIFICATONS AND ADDITIONAL DETAIL Silicon Rubber Cables
- Ten critical case conduits were evaluated for both Units. Provide the number of conduits evaluated for each Unit.
Provide the total number of silicone rubber cables in the Watts Bar Nuclear Plant (WBN),
Unit 2, population.
Provide the process/justification used to qualify the Unit 2 cables for a 40-year life.
Cable Jamming Provide the results of the review of cable pullinq techniques, including hand pulled versus assisted pull findings.
If cases of assisted pull are found, provide the evaluation methodology for ensuring jamming did not occur in these cases.
Provide a discussion of the technique for taping single conductors into a triplex configuration, along with clarification regarding which cables were subjected to the technique. Confirm that the reactor cooling pump cables were replaced and that the new cables were placed in a cable tray.
Provide a discussion explaining why single conductor cable configurations are more bounding than multi-conductor cable configurations when addressing jamming concerns.
Clarify how multi-conductor cables are not susceptible to damage from jamming.
Provide a discussion of how the coefficient of friction was determined. Provide supporting documentation.
Support in Vertical Conduits Provide a definition and characterization of the term "rework" as applied to cable trays, including examples.
Provide the basis for the determination that "creep" did not occur in the vertical conduits.
Provide the basis for "hand-lifting" cables.
Support in Vertical Trays Provide a summary as to how the vertical cable trays were assessed to determine that no cable damage occurred.
Provide a discussion that clarifies that no credit was taken for tie-wraps to support vertical cables.
Proximity to Hot Pipe Provide a definition and characterization of the term "rework" as applied to raceways, including examples.
Provide the methodology used for developing the criteria for "Hot Pipe" configurations.
Provide the basis and assumptions for characterizing the piping fluid and ambient room temperatures.
- 2
- Confirm that walk downs of "Hot Pipe" configurations will be conducted as part of project completion to ensure field run configurations meet installation specifications.
Provide Tennessee Valley Authority's (TVA's) G-40 specification.
Cable Pullby
- WBN Final Safety Analysis Report (FSAR), Section 8.3, does not require an evaluation when the fill percentage exceeds that cable fill criteria. The licensee agreed to submit a correction to the FSAR, including defining when performing evaluations is an acceptable alternative.
Provide the current WBN Unit 2 conduit fill percentages. Provide the number of conduits with greater than 35 percent and 40 percent fill for moderate and high risk cables.
- Confirm that new cables will be pulled in accordance with TVA's G-38 specification.
Bend Radius Submit the Bend Radius Report, including interviews with cable vendors.
Splices
- Provide a definition and characterization of the term "rework" as applied to splices for cables in mild environments.
- Confirm that splices, which had the potential for moisture intrusion, were replaced.
Side Wall Bearing Pressure Provide a discussion of how the 43 cable samples that were evaluated were extrapolated to all cable configurations and how margin was applied to side wall bearing pressure limitations.
Provide the cable manufacturer's certificate of conformance to the TVA specified side wall bearing pressure.
Pulling Cable Through go-Degree Condulets and Mid-Route Flexible Conduits
- Provide a discussion of why 12 and 14 gauge wire was determined to be limiting.
Computerized Cable Routing System lCCRS) Software and Database Verification and Validation Provide a discussion as to how cable materials are tracked and can be recovered using mark numbers. Describe how this information will be linked to the notes in the Integrated Cable and Raceway Design System (ICARDS) for future use.
Provide documentation as to how the use of mark numbers is accomplished at WBN.
- The note in ICARDS appears to indicate that the cable insulation for all cables that are important to safety (i.e., cables other than environmentally qualHied cables) have not been verified. Confirm that the cable properties (e.g., insulation material) will be verified for all cables that are important to safety.
- 3
- Provide a clarification of design cable length versus installed cable length, including a discussion as to how each length is used. Confirm that the cable lengths from pull cards will be used for electrical calculations for WBN Unit 2 and not from ICARDS.
Provide a discussion of the medium voltage cable testing program. Provide the results of the program.
Provide the methodology used for installation of conduit.
Provide a specific discussion for each item in the CAP (ADAMS Accession No. ML073540992) forwarded by TVA letter dated February 15, 1989 (ADAMS Accession No. ML073540990) that resolved Physical Separation and Electrical Isolation.
Provide a specific discussion for each item in the CAP (ADAMS Accession No. ML073540992) forwarded by TVA letter dated February 15, 1989 (ADAMS Accession No. ML073540990) that resolved the Torque Switch and Overload Relay Bypass Capability for Active Safety Related Valves.
- 2 Please direct any inquiries to me at 301-415-6606 or JoeI.Wiebe@nrc.gov.
Ira!
Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
- 1. List of Attendees
- 2. Requested Clarifications and Additional Detail cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPWB Reading File RidsNrrDorlLpwb RidsNrrPMWattsBar2 Resource RidsNrrLABClayton Watts_BarUnit2 Resource RidsNrrDeEeeb RMathew NRR RHaag RII MMcConnell NRR PSahay NRR GMorris NRR ADAMSAccession No. PKG ML090770080 Meetlng Summary ML090910150 ResourceRidsOgcRp Resource RidsRgn2MailCenter Resource CTucci NRR JAdams, EDO RidsAcrsAcnw_MailCTR Resource Meeting Notice ML090560427 H
dou s ML090771062 an t
OFFICE DORLILP-WB/PM DORLlLP-WB/LA DORLILP-WB/BC DORLILP-WB/PM NAME JWiebe BClayton LRaghavan JWiebe DATE 04/02/09 04/02/09 04/02/09 04/02/09 OFFICIAL RECORD COPY