2009-02-Public Forms
ML090830281
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/06/2009
From: Brian Larson
Operations Branch IV
To:
Pacific Gas & Electric Co
References
50-275/09-301, 50-323/09-301
Download: ML090830281 (12)


Text

OBDlZO2 - INITIAL OPERATOR LICENSING PROCESS Chief: Brian T. Larson Facility: DC Date of Written Exam: 2/6/2009 Start of Op Test: 2/9/2009 End of Op Test: 2/13/2009 11 11/7/2008 IReference material due (if NRC authored) I R f l IES-201 Att-3 II

Diablo Canyon Date of Examination: 02/09/09 Initials Item Task Description a b* I c#

1.

w R

I T

T I I r

a Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients I I I

b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.
c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
3. a Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2 (I) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is wthin the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power emerqency and RCA tasks meet the criteria t i a Author b Facility Reviewer (*)

c NRC Chief Examiner (#)

d NRC Supervisor Note: f Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

Not aoolicable for NRC-oreoared examination outlines ES-201 Page 26 of 28

ES-404 ritten ~ x a ~ i n a t i o nuality Checklist Form ES-401-6 item Description I. Questions and answers are techntcally accurate and applicable to the facilii.

5. Question duplication from the license screeninglaudt exam was controlled RF 00 as indicated below (check the item that applies) and appears appropriate:

- the audit exam was systematically and randomly developed; or

- the audit exam was completed before the license exam was started; or

_. the examinations were developed independently; or X the licensee certifies that there is no duplication; or

- other (explain)

6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified): enter the actual RO I SRO-onlv
7. Between 50 and 60 percent ofthe questions on the RO exam are written at the cornprehensioni analysis levei; rt the higher wgnitiie levels; enter I/ 8.

Referenceslhandouts provided do not give away answers or aid in the eiiminath d disWctrJrs.

9. Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justifred.

r

a. Author
b. Facility Reviewer r)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Note:
  • The facilii reviewer's initialslsignature are not applicable for NRCdeveloped examinations.
  1. Independent NRC reviewer initial items in Column "e"; chief examiner concurrence required.

Rev 1.

Facility: Diablo Canyon Power Plant Date of Examination: 02/09/2008 Operating Test mber: L061C t . General Criteria

a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.

C. The operating test shall not duplicate items from the applicants' audit test@). (see Section D.l .a.)

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. Walk-Through Criteria
a. Each JPM includes the following, as applicable:

initial conditions

  • initiating cues e

references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

Printed Name / Signature Date

a. Author
b. Facility Reviewerr)
c. NRC Chief Examiner (#)
3. NRC Supervisor
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

~S-301 S~mulatorSc~nario Form ES-301-Ij I

Facilty: Diablo Canyon Power Plant Date of Exam: 02/09/2008 Scenario Numbers: 1/2/3 Operating Test No.: L061C I

I/

1 QUALITATIVE ATTRIBUTES nitiate the event incorporated into the scenario

8. The simulator modelins is not altered.
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelitv is maintained while runnina the Dlanned scenarios.

10 Every operator will be evaluated using at least one new or significantly modified scenario

12. Each applicant will be significantly involved in the minimum number of transients and events saecified on Form ES-301-5 (submit the form with the simulator scenarios).

I I I I

4. Major transients (1-2)

Facility: DCPP Date of Exam: 02/06/09 Exam Le\ ? l : R O m SRO nitial:

item Description a b r,

1. Clean answer sheets copied before grading RF 00
2. Answer key changes and question deletions justified nla nia and documented
3. Applicants scores checked for addition errors RF 00 (reviewers spot check > 25% of examinations)
4. Grading for all borderline cases (80 22% overall and 70 or 80, RF 00 as applicable, 24% on the SRO-only) reviewed in detail
5. All other failing examinations checked to ensure that grades nla nla are justified
6. Performance on missed questions checked for training RF 00 deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Printed Name/Signature Date
a. Grader __02106109-
b. Facility Reviewer(*) 02106109-
e. NRC Chief Examiner (*)
d. NRC Supervisor (*)

(*) The facility reviewers signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

t-: I-'

Z Z z z z 2m 4 K

m 4

K m

4 K

m 4

K m

Z- Z- z- z- i 2 2 2 2 2K 4 4 2 2 <

L L L L L L L L L L L

.-c c E E v o 2  % : E N N T - - -

0 0 0 m m m m m m 0 0 0 0

N m

N r 0

N w

. N 0

N m

m N m 0 0 0 0 0 0 0 0 0 m w w 0 0 0

0 r

0 x

c 0

0" m

-0 0 0

a m e b-L 7

0 L

2

- 2 m m z

c c 0

t-0 0 B 0 cc Y Y 0 0 3 3 B B v) v) 0 0 0

cc iv) i P

i

In al v

0 0

al u) m 4 z a

d

.-5 u) 2

a, P

0 0

a, In m

r:

Q d

C

.-00 d

b N

%I-O W

n J

/I///IlI

/1/l//I/

a, tn m

a Ii'lII E

E

.-c0 .-0

.b-m m

E .-E I-f f X

X W Y J v) a 2 a.

0 r 4