ML090830187

From kanterella
Jump to navigation Jump to search
Personnel Changes at the Rensselaer Polytechnic Institute Reactor Critical Facility
ML090830187
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 03/10/2009
From: Wei T
Rensselaer Polytechnic Institute
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML090830187 (1)


Text

rensselaepr Rensselaer LL SCHOOL OF ENGINEERING TIMOTHY WEI, INTERIM DEAN March 10, 2009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Personnel Changes at the Rensselaer Polytechnic Institute Reactor Critical Facility NRC License CX-22 Docket Number 50-225 To Whom It May Concern:

This letter reports changes in the supervisory positions at the RPI Reactor Critical Facility (RCF).

The current Facility Director, Glenn Winters, is taking a position with the International Atomic Energy Agency, effective April 1, 2009. Dr. Jeffery Geuther will take over the position of Facility Director on that date. His position of Operations Supervisor will be filled by Jessica Berry, a licensed Senior Reactor Operator at the facility. Mrs. Berry will replace Mr. Winters on the NSRB. Dr. Geuther is already an NSRB member.

To assure the*continuity of RCF operationi,the'tlfansfer of'responsibilities'.for both positions will be completed before Mr. Winters leaves RPI to assume his new position at IAEA.

Yours truly, Timothy Wei, Ph.

Professor and Inte~i Dean Cc: Dr. Michael Podowski, NSRB Chair Dr. Achille Messac; Acting Department Head; Mechanical, Aerospace and Nuclear Engineering Rensselaer Polytechnic Institute J10 8th Street l.Troy, NY 12180.-3590 USA 13006 jqnsson Engineering Center Phone (518) 276-6298' I"Fa 5i8):216-87h88 1weit ri.edu