LaSalle Training Job Performance Measure Emergency Start of the 0 DG IAW LOA-DG-201 via the K98 Relay.
JPM Number: i. 07-01 NRC SRO-RO Plant Revision Number: 08 Procedure: LOA-DG-201, Rev. 3 Date: 07/28/2008 Plant RO/SRO 3.6 Electrical 264000, EDGs K/A A2.09 I.R. 3.7/4.1 A, D, E, R Developed By:
Facility Author Date Validated By:
Facility Author Date Reviewed By:
Facility Representative Date Approved By:
Training Department Date
Page 2 of 10 Job Performance Measure JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 3 of 10 Job Performance Measure Revision Record (Summary)
- 1. Revision 3, Revised task numbers to reflect current task numbers Revised K/A numbers to reflect NUREG 1021 Rev 8 Revised format to meet NTAFT JLOR03 Rev 1 Changed JPM to Revised steps to reflect LOA-DG-201 Rev1 Made JPM unit specific
- 2. Revision 4, Revised task number for new operations task list.
- 3. Revision 5, Revised JPM for Windows 2000 computers and validation time.
- 4. Revision 6 Added step to check DC Power Available and initiating cue to the Examinees initial conditions.
- 5. Revision 7 Minor formatting and editorial changes. Updated to reflect criteria from NuReg 1021, Rev. 9, Supplement 1 and NuReg 1123, Rev. 2, Supplement 1.
- 6. Revision 8 Changed JPM (based on NRC comments) such that the examinee is provided a marked up copy of LOA-DG-201 and is directed to begin at step B.1.3 per the initial conditions. This resulted in changing the steps and cues in the JPM body.
Page 4 of 10 Job Performance Measure Materials
- 1. The following material is required to be provided to examinee:
- a. One copy of LOA-DG-201 marked up and ready to perform step B.1.3.
Page 5 of 10 Job Performance Measure INITIAL CONDITIONS
- You are an extra NSO.
- Unit 2 has experienced a LOCA.
- The Unit 2 SAT has tripped.
- The 0 DG has failed to start.
- The 0 DG READY FOR AUTO START light is lit.
- Radiation conditions in the plant are at or below normal levels.
- All other systems are normal.
INITIATING CUE The Unit 2 Supervisor has directed you to locally start the 0 DG IAW LOA-DG-201 DG Failure beginning at step B.1.3.
Notify the Unit 2 Control Room when the '0' DG is started.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 6 of 10 Job Performance Measure JPM Start Time:
Comment UNSAT 1
STEP ELEMENT STANDARD SAT Number CUE Provide the examinee with a marked up copy of LOA-DG-201, ready to perform step B.1.3.
CUE IF the Examinee calls the control room to verify steps B.1.1 and B.1.2 are complete, report that the 0 DG Ready for Auto Start light is still lit and DC Power is available.
B.1.3 Examinee simulates calling U-2 Control Room (ext. 2408 or ESTABLISH communications 2407)
- 2. between the Unit 2 Control ___ ___ ___
Room and 0 DDG Room to OBSERVE Air Start Motor operation during start attempts.
CUE You are talking to the Unit 2 Assist NSO.
B.1.4 Examinee coordinates with U-2 Assist NSO to remotely start 0 REMOTELY START - 0 DG
- 3. DG by taking the 0DG Engine ___ ___ ___
Control Switch in the U-2 Control Room to the START position.
CUE As U2 Assist NSO, state that the 0 DG Engine control switch is in the START position.
CUE Inform the examinee that there is no noise changes in the 0DG Room, nor any movement on the DG.
B.1.5 Examinee determines that 0 DG
- 4. is NOT running (remains in left ___ ___ ___
CHECK 0 DG - NOT RUNNING hand column of LOA-DG-201).
B.1.6 Examinee determines that Air Start Motors did NOT engage
- 5. CHECK Air Start Motors - DID ___ ___ ___
(remains in left hand column of NOT ENGAGE.
LOA-DG-201).
B.1.7 Examinee places switch 0HS-DGS001 to MAN.
- 6. PLACE 0DG02JB, ___ ___ ___
0HS-DGS001, 0 DG Engine Control Switch to - MAN
Page 7 of 10 Job Performance Measure Comment UNSAT 1
STEP ELEMENT STANDARD SAT Number CUE The switch you identified is in the position you indicated.
B.1.8 Examinee depresses 0HS-DGS004, 0 Diesel DEPRESS and HOLD Generator Engine Start
- 7. 0HS-DGS004, 0 Diesel ___ ___ ___
pushbutton for at least 2 Generator Engine Start seconds.
pushbutton for a minimum of 2 seconds.
CUE You hear no noise changes nor see any movement on the 0 DG.
B.1.9 Examinee determines that 0 DG
- 8. is not running (remains in left ___ ___ ___
CHECK 0 DG - NOT RUNNING hand column of LOA-DG-201).
B.1.10 Examinee determines that Air Start Motors did not engage
- 9. CHECK Air Start Motors - DID ___ ___ ___
(remains in left hand column of NOT ENGAGE.
LOA-DG-201).
B.1.11 Examinee PLACES 0HS-DGS001, 0 DG Engine
- 10. PLACE 0DG02JB, ___ ___ ___
Control Switch to - AUTO 0HS-DGS001, 0 DG Engine Control Switch to - AUTO CUE The switch you identified is in the position you indicated.
B.1.12 Examinee checks with U2 Assist NSO, or determines LOCA CHECK LOCA initiation signal
- 11. signal is present due to Initial ___ ___ ___
present.
Conditions (Unit 2 has experienced a LOCA).
CUE As U2 Assist NSO, there is a LOCA signal present on Division 1.
B.1.13 Examinee goes to Unit 2 Div. 1 Auxiliary Electric Equipment ESTABLISH communications
- 12. Room and calls control room. ___ ___ ___
between Unit 2 Control Room and Unit 2 Div. 1 Auxiliary Electric Equipment Room.
CUE You are talking to the Unit 2 Assist NSO.
Page 8 of 10 Job Performance Measure Comment UNSAT 1
STEP ELEMENT STANDARD SAT Number B.1.14 Examinee checks relay status
- 13.
describing how relay would look CHECK Low Level/ Hi Drywell ___ ___ ___
Critical if open/closed.
Pressure relay 2E12A-K098A at Step 2H13-P629 - CLOSED CUE The relay is as you see it.
NOTE This starts the alternate path. Examinee moves to right hand column of LOA-DG-201.
- 14. B.1.14.1 Examinee simulates/describes removing the relay cover. ___ ___ ___
Critical REMOVE relay 2E12A-K098A Step cover.
CUE The relay cover is removed.
B.1.14.2 Examinee repositions (pushes
- 15.
in) relay and holds for a MANUALLY INITATE and HOLD ___ ___ ___
Critical minimum of 20 seconds.
relay 2E12A-K098A for a Step minimum of 20 seconds.
CUE The relay is in the positioned you described.
B.1.15 Examinee determines that 0 DG
- 16. is running. ___ ___ ___
CHECK 0 DG - NOT RUNNING CUE When the examinee returns to the phone with U2, as the U2 Assist NSO report that the 0 DG running light is lit, and the field is flashed.
B.1.15.1 Examinee determines that the
- 17. next step to be performed is step If 0DG is running, then go to step 26.
26.
Terminating Cue When the examinee determines that step 26 is the next step to be informed, inform the examinee the JPM is complete at this time.
JPM Stop Time:
Page 9 of 10 Job Performance Measure Operators Name: ______________________________________________________
Job
Title:
Title:
Emergency Start of the 0 DG IAW LOA-DG-201 via the K98 Relay JPM Number: i. 07-01 NRC SRO-RO Plant Rev. Number: 08 Task Number and
Title:
11.003 Perform the in-plant actions for a DG start failure Safety Function: 3.6 Electrical K/A Number and Importance: 264000 A2.09 I.R. 3.7/4.1 Suggested Testing Environment: Plant Actual Test Environment: Simulator Plant CR Other ______
Test Method: Simulate Perform Alternate Path: Yes No SRO Only Yes No Time Critical: Yes No Estimated Time to Complete: 25 minutes Actual Time Used: ________minutes
References:
LOA-DG-201, Rev. 3 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained within this JPM, and determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name:__________________________________________________(Print)
Evaluators Signature:_____________________________________ Date:_______
Page 10 of 10 Job Performance Measure STUDENT COPY INITIAL CONDITIONS
- You are an extra NSO.
- Unit 2 has experienced a LOCA.
- The Unit 2 SAT has tripped.
- The 0 DG has failed to start.
- The 0 DG READY FOR AUTO START light is lit.
- Radiation conditions in the plant are at or below normal levels.
- All other systems are normal.
INITIATING CUE The Unit 2 Supervisor has directed you to locally start the 0 DG IAW LOA-DG-201 DG Failure beginning at step B.1.3.
Notify the Unit 2 Control Room when the '0' DG is started.
Page 1 of 8 07-01 NRC ILT Exam Plant JPM LaSalle Training Department Job Performance Measure Remove Fuses for a Stuck Open SRV per LOA-SRV-201 JPM Number: j. - SRO-RO Plant NRC 07-01 SRV Revision Number: 10 Procedure: LOA-SRV-201, Rev. 5 Date: 07/28/08 Plant RO/SRO 3.3 Reactor Pressure Control 239002 K/A A2.03 I.R. 4.1/4.2 D, E Developed By:
Facility Author Date Validated By:
Facility Author Date Reviewed By:
Facility Representative Date Approved By:
Training Department Date
Page 2 of 8 07-01 NRC ILT Exam Plant JPM JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 3 of 8 07-01 NRC ILT Exam Plant JPM Revision Record (Summary)
- 1) Rev. 08 08/24/98 Reformatted, revised to new procedure LOA-SRV-101
- 2) Rev. 09 10/10/05 Changed from F to K SRV. Made the JPM so it could be performed on either Unit. Updated task to Operations task list number.
- 3) Rev. 10 02/27/08 Minor editorial changes for use during 07-01 NRC ILT Exam. Updated to meet criteria of NuReg 1021, Rev.
9, Supplement 1.
Page 4 of 8 07-01 NRC ILT Exam Plant JPM INITIAL CONDITIONS
- 1. Unit-2 is operating at 80% power.
- 2. The Unit-2 Control Room has positive indication that SRV 2B21-F013K (K SRV) has spuriously opened.
INITIATING CUE You have been directed to remove the fuses for SRV 2B21-F013K in accordance with LOA-SRV-201, Step B.8.
Refer to LOA-SRV-201, Table 1, SRV Fuses for fuse identification.
Inform the Unit-2 NSO when the fuses are removed.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 5 of 8 07-01 NRC ILT Exam Plant JPM JPM Start Time:
Comment SAT UNSAT Number STEP ELEMENT STANDARD CUE:
Provide the examinee with a copy of LOA-SRV-201.
NOTE:
Panels 2H13-P628 & 2H13-P645 are located in the Division 1 AEER. The fuses for K SRV can be removed in any order. Steps below are in the order the fuses are listed in Table 1.
Examinee locates panel Examinee correctly identifies
- 1. 2H13-P628. ___ ___ ___
panel 2H13-P628 NOTE:
Fuse pullers are normally located in the SRV cabinets. If fuse pullers are not present in the SRV cabinet, ask examinee "Where can you get a set of fuse pullers?" If they identify any of the following, tell them that they now have a set of fuse pullers. (Do not add any time, the JPM time is validated assuming the fuse pullers are in the SRV cabinet).
-EO storage locker (Swgr rooms)
-LGA Locker
-From another SRV fuse cabinet.
-From an EO.
CUE:
As the examinee describes the removal of each fuse, acknowledge the fuse removal with the following response:
The fuse you have indicated is in the position you describe.
REFER to Table 1 SRV Examinee refers to Table 1 to Fuses to IDENTIFY fuses identify fuses F43 and F44 ___ ___ ___
Critical Step
Critical Step
Page 6 of 8 07-01 NRC ILT Exam Plant JPM Comment SAT UNSAT Number STEP ELEMENT STANDARD Examine locates panel Examinee correctly identifies
REFER to Table 1 to Examinee refers to Table 1 to IDENTIFY fuses associated identify fuses F63B and F64B ___ ___ ___
- 7. Remove fuse F-63B (TB DD, Examinee removes fuse F-11 from right). 63B (TB DD, 11 from right). ___ ___ ___
Critical Step
- 8. Remove fuse F-64B (TB DD, Examinee removes fuse F-12 from right.) 64B (TB DD, 12 from right.) ___ ___ ___
Critical Step Examinee reports to Unit NSO Examinee reports the fuses
- 9. that fuses for Unit-2 K SRV for 2B21-F013K have been ___ ___ ___
have been removed. removed.
CUE:
Acknowledge the report. The JPM is considered complete.
JPM Stop Time:
Page 7 of 8 07-01 NRC ILT Exam Plant JPM Operators Name: ______________________________________________________
Job
Title:
Title:
Remove Fuses for a Stuck Open SRV per LOA-SRV-201 JPM Number: j. - SRO-RO Plant NRC 07-01 SRV Rev. Number: 10 Task Number and
Title:
40.005 Respond to a Stuck Open SRV IAW LOA-SRV-201 Safety Function: 239002 Relief/Safety Valves (3.3 Reactor Pressure Control)
K/A Number and Importance: A2.03, Stuck Open SRV, 4.1/4.2 Suggested Testing Environment: Plant Actual Test Environment: Simulator Plant MCR Other ______
Test Method: Simulate Perform Alternate Path: Yes No SRO Only Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: ________minutes
References:
LOA-SRV-201, Rev. 5 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained within this JPM, and determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name:__________________________________________________(Print)
Evaluators Signature:_____________________________________ Date:__________
Page 8 of 8 STUDENT COPY INITIAL CONDITIONS
- 1. Unit-2 is operating at 80% power.
- 2. The Unit-2 Control Room has positive indication that SRV 2B21-F013K (K SRV) has spuriously opened.
INITIATING CUE You have been directed to remove the fuses for SRV 2B21-F013K in accordance with LOA-SRV-201, Step B.8.
Refer to LOA-SRV-201, Table 1, SRV Fuses for fuse identification.
Inform the Unit-2 NSO when the fuses are removed.
LaSalle Training Job Performance Measure Line up the CRD System for Injection into the RPV JPM Number: k.07-01 NRC SRO-RO Plant Revision Number: 09 Procedure: LGA-RD-01, Rev. 09 Date: 07/28/2008 Plant RO/SRO 3.2 Reactor Water Inventory Control E/APE 295031 K/A EA1.10 I.R. 3.6/3.7 D, E, R Developed By:
Facility Author Date Validated By:
Facility Author Date Reviewed By:
Facility Representative Date Approved By:
Training Department Date
Page 2 of 9 Job Performance Measure JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 3 of 9 Job Performance Measure Revision Record (Summary)
- 1. Rev. 02 Added steps and revised step sequence consistent with current procedure. Added scoring instructions and this page.
- 2. Rev. 03 Revised to reflect Rev. 8 of LGA-RD-01.
- 3. Rev. 04 Not documented
- 4. Rev. 05 Revised to incorporate changes from Revision 9 of LGA-RD-01, added wording to clarify task standards.
- 5. Rev. 06 Revised to incorporate 2002 estimated time and other Windows 2000 changes.
- 6. Rev. 07 Added Notes to identify Manual Auto Stations for 1C11-F002A and B. Changed cue for two steps to indicate that knob is full clockwise not that the valve is open.
- 7. Rev. 08 Changed bank JPM titled PRD03R7 into this JPM for use in ILT Class 07-01 NRC Exam. The change includes minor formatting and editorial changes, and also any update required to reflect changes to NuReg 1021, Rev. 9, Supplement 1, and NuReg 1123, Rev. 2, Supplement 1.
- 8. Rev. 09 Changed step 5 such that it is not a critical step since the valve is normally in the open position. Changed step 5 to be in line with the valve being in the open position. Other minor editorial changes made to improve the JPM.
Page 4 of 9 Job Performance Measure INITIAL CONDITIONS
- 1. A LOCA has occurred on Unit1.
- 2. All control rods are fully inserted.
- 3. Reactor water level is currently at -112 inches and lowering at 0.5 inches per minute.
- 4. LGA-RD-01, Alternate Vessel Injection Using Both CRD Pumps is in-progress and has been completed up to and including step C.7.
INITIATING CUE The Unit 1 NSO has directed you to perform LGA-RD-01, Alternate Vessel Injection Using Both CRD Pumps beginning at Step C.8.
NOTIFY the Unit 1 NSO when the CRD Drive Water PCV BYPASS Valve, 1C11-F004, is OPEN.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM.
It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 5 of 9 Job Performance Measure JPM Start Time: _____
Comment SAT UNSAT Number STEP ELEMENT STANDARD NOTE The M/A Stations for 1C11-F002A/B are labeled 1C11-D009A/B.
CUE:
Provide the examinee a marked up copy of the Alternate Vessel Injection Using Both CRD Pumps Procedure, LGA-RD-01, procedure.
Step 8.a The Examinee simulates
- 1. placing the upper switch for PLACE AUTO-MAN upper switch for 1C11-F002A to MANUAL. ____ ____ ____
Critical 1C11-F002A, A CRD FLOW Step CONTROL VALVE to MAN.
CUE The valve you indicated is in manual.
Step 8.b The Examinee simulates turning the lower knob for
- 2.
TURN lower knob for 1C11-F002A; A 1C11-F002A in the Critical CRD FLOW CONTROL VALVE to clockwise direction to FULL Step FULL INCREASE (clockwise INCREASE.
direction).
CUE The knob is full clockwise.
Step 8.c The Examinee simulates
- 3. placing the upper switch for PLACE AUTO-MAN upper switch for 1C11-F002B to MANUAL. ____ ____ ____
Critical 1C11-F002B, B CRD FLOW Step CONTROL VALVE to MAN.
CUE The valve you indicated is in manual.
Step 8.d The Examinee simulates turning the lower knob for
- 4.
TURN lower knob for 1C11-F002B, B 1C11-F002B in the Critical CRD FLOW CONTROL VALVE to clockwise direction to FULL Step FULL INCREASE (clockwise INCREASE.
direction).
Page 6 of 9 Job Performance Measure Comment SAT UNSAT Number STEP ELEMENT STANDARD CUE The knob is full clockwise.
Step 9.a The Examinee simulates verifying open 1C11-F034.
- 5. ____ ____ ____
OPEN 1C11-F034, CRD CHARGING WATER HEADER STOP.
CUE The valve you indicated is open.
Step 9.b The Examinee simulates verifying open 1C11-
- 6. ____ ____ ____
VERIFY OPEN 1C11-F046A, A CRD F046A.
FCV UPSTRM VALVE.
CUE The valve you indicated is open.
Step 9.c The Examinee simulates
- 7.
verifying open 1C11-Critical VERIFY OPEN 1C11-F046B, B CRD F046B.
Step FCV UPSTRM VALVE.
CUE The valve you indicated is open.
Step 9.d The Examinee simulates verifying open 1C11-
- 8. ____ ____ ____
VERIFY OPEN 1C11-F047A, A CRD F047A.
FCV DWNST VALVE.
CUE The valve you indicated is open Step 9.e The Examinee simulates
- 9.
verifying open 1C11-Critical VERIFY OPEN 1C11-F047B, B CRD F047B.
Step FCV DWNST VALVE.
CUE The valve you indicated is open
Page 7 of 9 Job Performance Measure Comment SAT UNSAT Number STEP ELEMENT STANDARD Step 10. Examinee simulates
Critical PRESSURE CONTROL VLV at CR Step Panel 1H13-P603.
CUE The Control Room informs you that 1C11-F003 is open.
NOTE 1C11-F004 is located in the SE corner RB 761' north of the FCV'S.
Step 11. The Examinee simulates
- 11.
opening 1C11-F004.
Critical OPEN 1C11-F004, CRD DRIVE Step WATER PCV BYPASS VALVE.
CUE The valve you indicated is open.
Examinee INFORMS the Unit NSO The Examinee simulates
PCV BYPASS VALVE is OPEN. that 1C11-F004 is OPEN.
CUE The JPM is complete when the examinee informs the Unit 1 NSO the 1C11-F004, CRD DRIVE WATER PCV BYPASS VALVE is OPEN.
JPM Stop Time:
Page 8 of 9 Job Performance Measure Operators Name: ______________________________________________________
Job
Title:
Title:
Line up the CRD System for Injection into the RPV JPM Number: k.07-01 NRC SRO-RO Plant ` Rev. Number: 09 Task Number and
Title:
413.010, Evaluate plant conditions and Control RPV level using CRD Safety Function: 3.2 Reactor Water Inventory Control K/A Number and Importance: E/APE 295031 K/A EA1.10 I.R. 3.6/3.7 Suggested Testing Environment: Plant Actual Test Environment: Simulator Plant MCR Other ______
Test Method: Simulate Perform Alternate Path: Yes No SRO Only Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: ________minutes
References:
LGA-RD-01, Rev. 09 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained within this JPM, and determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name:__________________________________________________(Print)
Evaluators Signature:_____________________________________ Date:_______
Page 9 of 9 STUDENT COPY INITIAL CONDITIONS
- 1. A LOCA has occurred on Unit 1.
- 2. All control rods are fully inserted.
- 3. Reactor water level is currently at -112 inches and lowering at 0.5 inches per minute.
- 4. LGA-RD-01, Alternate Vessel Injection Using Both CRD Pumps is in-progress and has been completed up to and including step C.7.
INITIATING CUE The Unit 1 NSO has directed you to perform LGA-RD-01, Alternate Vessel Injection Using Both CRD Pumps beginning at Step C.8.
NOTIFY the Unit 1 NSO when the CRD Drive Water PCV BYPASS Valve, 1C11-F004, is OPEN.