ML090780284

From kanterella
Jump to navigation Jump to search
Initial Exam 2008-301 Final Sim/In-Plant JPMs
ML090780284
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/21/2008
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
Download: ML090780284 (89)


Text

  • FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE LOCAL OPERATION OF BORON CONCENTRATION CONTROL - UNIT 2 NRC P-1 Developed/Revised by: _ _-=.:La:..:..:....:.rry~Ri..:....:...ch'------_ 4/01/08 Date Training Management Approval: _ _ _ _ _ _ _ _-----=--:--_

Date JPM NRC P-1 Rev 0 Plant Page 1 of 8

JOB PERFORMANCE MEASURE Task: Perform local blend to the VCT in accordance with 2-0NP-02.01 Boron Concentration Control.

Alternate Path JPM? No Facility JPM #: N/A K/A Rating(s):

Duty Area(s): N/A Task Information: . N/A Task Standard:

This JPM is completed when the VCT is blended to the normal band.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-0NP-02.01 Boron Concentration Control Validation Time: 20 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-0NP-02.01 Boron Concentration Control Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • Standard in plant PPE Radiological Protection and RWP Requirements:
  • General entry RWP requirements JPM NRC P-1 Rev 0 Plant Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Locally operate the Boron Concentration Control system to blend to the VCT in accordance with Appendix A of 2-0NP-02.01 Boron Concentration Control.
  • The performance level to be used for this JPM is SIMULATE.
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 Control Room is not able to verify proper Boric Acid and Primary water flow on FR-2210Y and FR-221OX to blend to the VCT. The crew has implemented 2-0NP-02.01 Boron Concentration Control.

INITIATING CUES:

The US directs you to locally blend to the VCT using Appendix A from 2-0NP-02.01 Boron Concentration Control. The blend ratio is 10: 1.

JPM NRC P-1 Rev 0 Plant Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

Appendix A of 2-0NP-02.01 Boron Concentration Control STEP 1 (1) Establish communication with the Control Room.

- - SAT STANDARD: ESTABLISH Communications with Unit 2 Control Room using Radio at the

- - UNSAT Boric.Acid station.

EXAMINERS CUE: Unit 2 Control Room acknowledges communications COMMENTS:

STEP 2: (3) Start 2A or 2B Boric Acid Pump:

- - SAT STANDARD: VERIFY Control Room has started 2A or 2B Boric Acid Pump

- - UNSAT EXAMINERS CUE: Control Room has started 2A Boric Acid Pump COMMENTS:

JPM NRC P-1 Rev 0 Plant Page 4 efa

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (4) ENSURE V2514 is CLOSED:

- - SAT STANDARD: ENSURE Control Room has verified V2514 is CLOSED.

EXAMINERS CUE: Control Room has ensured V2514 is closed.

- - UNSAT COMMENTS:

STEP 4: (5) ENSURE FCV-2210Y is CLOSED

- - SAT STANDARD: ENSURE Control Room FCV-2210Y is CLOSED

- - UNSAT EXAMINERS CUE: Control Room has ensured FCV-2210Y is closed.

COMMENTS:

JPM NRC P-1 Rev 0 Plant Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST CRITICAL CAUTION STEP

  • V2647 provides a direct Boric Acid flow path to the Charging pump suction at 20 gpm when full open. _ _ SAT
  • With V2647 open, the Boric Acid flow rate can NOT be monitored
  • V2180 provides a direct Primary Water flow path to the Charging pump suction

_ _ UNSAT EXAMINERS CUE: Control Room calls to OPEN V2647 EMERG Boration from BAM Pumps Dish Iso I % turn OPEN.

STEP 5: (6) DIRECT the Operator at the Boric Acid station to throttle V2647, EMERG )

Boration From BAM Pumps Disch Isol, OPEN Y4 turn.

STANDARD: OPENS V2647 Y4 turn and communicates to Control Room valve is Y4 turn open.

EXAMINERS CUE: V2647 is turned Counter Clockwise % turn EXAMINERS CUE: Acknowledges as Control Room V2647 is % turn open.

COMMENTS:

EXAMINERS CUE: Control Room calls to OPEN V2180 PMW to Charging CRITICAL Pumps Suct Manuallsol1 (one) turn open. STEP STEP 6: (7) _ _ SAT DIRECT the Operator at the Boric Acid station to throttle V2180, PMW to Charging Pumps Suct Manuallsol, OPEN to the calculated blend ration.

V2180 is located in the 2A Charging Pump Room. _ _ UNSAT STANDARD: OPENS V2180, PMW to Charging Pumps Suct Manuallsol, 1 (one) turn open and communicates to Control Room valve is 1 (one) turn open.

EXAMINERS CUE: V2180 is turned Counter Clockwise 1 (one) turn open.

EXAMINERS CUE: Acknowledges as Control Room V2180 is 1 (one) turn open.

COMMENTS:

JPM NRC P-1 Rev 0 Plant Page 6 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST EXAMINERS CUE: Reactor Makeup water flow indication FRC-2210X has CRITICAL malfunctioned. You are to CLOSE V2180 and REOPEN STEP V2180 % turn.

_ _ SAT STEP 7 (9) IE the Reactor Makeup water flow indication malfunctions, Then DIRECT the operator to OPEN V2180 ~ turn. _ _ UNSAT STANDARD: CLOSES V2180 and REOPENS V2180 to ~ turn open and communicates to control room V218C is ~ turn open.

EXAMINERS CUE: V2180 is closed EXAMINERS CUE: V2180 is OPEN % turn EXAMINERS CUE: Acknowledges as control room V2180 is % turn open COMMENTS:

STEP 8: (10) MONITOR for any abnormal change in Tave.

EXAMINERS CUE: Control room states Tave is constant. JPM is complete STANDARD: COMMUNICATES with control room to ensure Tave is not changing.

COMMENTS:

STOP TIME: _ _ _ __

JPM NRC P-1 Rev 0 Plant Page 7 of 8

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 Control Room is not able to verify proper Boric Acid and Primary water flow on FR-2210Y and FR-221OX to blend to the VCT. The crew has implemented 2-0NP-02.01 Boron Concentration Control.

INITIATING CUES:

The US directs you to locally blend to the VCT using Appendix A from 2-0NP-02.01 Boron Concentration Control. The blend ratio is 10:1

fJ FPL Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP Bank JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP NRC P-2 Developed/Revised by: ----------------

Ron Lauver 9/25/2006 Date Training Management Approval: _ _ _ _ _ _ _ ___

Date JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1 C AFW PP Page 1 of 9

JOB PERFORMANCE MEASURE Align Unit 2 CST to Supply the 1C AFW Pump.

Alternate Path JPM? No Facility JPM #: 0821062 K/A Rating(s):

Duty Area(s): NA Task Information: NA Task Standard:

This JPM is complete when the candidate has reported to the Unit 1 US that the Unit 2 CST has been lined up to supply the 1C AFW Pump. .

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • Watch Stander Key Ring for Locked Valves Validation Time: 20 minutes Time Critical:

Tools/Equipment/Procedures Needed:

Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • None JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 2 of9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Align Unit 2 CST to Supply the 1C AFW Pump.
  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, and Unit 2 CST level is 43 feet.

INITIATING CUES:

You are the Unit 1 NPO. The Unit 1 US has directed you to line up the 1C AFW Pump to take a suction from the Unit 2 CST lAW 1-0NP-09.02, "Auxiliary Feedwater," Appendix D.

JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 30f9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

1-0NP-09.02, "Auxiliary Feedwater,"

Appendix D, SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.

CAUTION

  • During the performance of this Appendix, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units. In the event the Unit 1 AFW SAT Pump suction pressure decreases to 3 psig during the performance of this appendix, the AFW Pump discharge valves must be throttled to maintain suction pressure. _ _ UNSAT
  • Performance of this Appendix will require Unit 1 to enter action statement for Tech.

Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech. Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Step 1B NIOTE

  • In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 19'6" gallons must be maintained in the Unit 2 CST unless Unit 2 is in Mode 4,5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degress.
  • The following valve lineups shall be performed with the pumps off.

STEP 1 (1A) NOTIFY Unit 2 Control Room.

STANDARD: NOTIFY Unit 2 Control Room that Unit 2 CST will be ALIGNED to supply the 1C AFW Pump.

  • EXAMINER'S CUE: Unit 2 Control Room ACKNOWLEDGES COMMENTS:

STEP 2 (1.B.1) At the Unit 2 CST, establish flow from the Unit 2 CST to Unit 1 AFW Pumps CRITICAL by one of the following: STEP

1. !f the Unit 2 CST level is greater than 40 feet, Then LOCK OPEN _ _ SAT V12803, CST Inlet to / from Unit 1 Isol.

STANDARD: UNLOCK and POSITION V12803 to OPEN and then RELOCK. UNSAT

  • EXAMINER'S CUE: V12803 is OPEN and LOCKED.

EVALUATOR'S NOTE: Initiating Cue gives Unit 2 CST level as 43 Feet.

Valve does not have to be re-Iocked to meet the Critical Step.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821 062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 4 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 3 (1.C) Lock Open V12805, CST Crosstie to Unit 1 1501. STEP STANDARD: UNLOCK and POSITION V12805 to OPEN and then RELOCK. SAT

  • EXAMINER'S CUE: V12805 is OPEN and LOCKED.

UNSAT EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 5 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: (1.E.1) To supply 1C AFW pump, perform the following: CRITICAL STEP

1. Lock closed V12506, Unit 1 CST to 1C AFW Pump at the Unit 1 CST. _ _ SAT STANDARD: UNLOCK and POSITION V12506 to CLOSE and then RELOCK.

_ _ UNSAT

  • EXAMINER'S CUE: V12506 is CLOSED and LOCKED.

EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.

COMMENTS:

STEP 5: (1.E.2) To supply 1C AFW pump, perform the following: CRITICAL STEP

2. Lock open V12175, Unit 2 CST to 1C AFW Pump at the Unit 1 CST.

_ _ SAT STANDARD: UNLOCK and POSITION V12175 to OPEN and then RELOCK.

  • EXAMINER'S CUE: V12175 is OPEN and LOCKED. _ _ UNSAT EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.

COMMENTS:

STEP 6: (1.E.3) To supply 1C AFW pump, perform the following: CRITICAL STEP

3. Open the PI-12-18C, 1C AFW Pump Suct Press, instrument isolation valve.

_ _ SAT STANDARD: POSITION PI-12-18C instrument isolation to OPEN.

  • EXAMINER'S CUE: PI-12-18C instrument isolation valve is OPEN. _ _ UNSAT COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821 062/Rev 17 Unit 1 and 2 CSTs, 1 C AFW PP Page 6 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7: (1.EA) To supply 1C AFW pump, perform the following:

4. Verify greater than 3 psig suction pressure on PI-12-18C, 1C AFW _ _ SAT Pump Suction Pressure.

STANDARD: VERIFY GREATER THAN 3 psig on PI-12-18C. _ _ UNSAT

  • EXAMINER'S CUE: PI-12-18C INDICATES 15 psig.

COMMENTS:

STEP 8: (1.E.5.a) To supply 1C AFW pump, perform the following:

5. PERFORM the following: _ _ SAT
a. OPERATE 1C Auxiliary Feedwater Pump as necessary.

_ _ UNSAT STANDARD: OPERATE 1C Auxiliary Feedwater Pump as necessary.

  • EXAMINER'S CUE: Contact control room.

COMMENTS:

CRITICAL STEP 9: (1.E.5.b) To supply 1C AFW pump, perform the following: STEP

6. PERFORM the following:

_ _ SAT

b. CLOSE V08399, 1C AFW Pump Recirc. Isol.

STANDARD: POSITION V08399, 1C AFW Pump Recirc. Isol. To CLOSE _ _ UNSAT

  • EXAMINER'S CUE: V08399, 1C AFW Pump Recirc. Iso I. is closed COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 7 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: (done) NOTIFY Unit 1 US that the task is COMPLETE SAT UNSAT STANDARD: NOTIFY 1 Unit 1 US that 1C AFW Pump is LINED UP to take a SUCTION on the Unit 2 CST lAW 1-0NP-09.02, Appendix D

  • EXAMINER'S CUE: Unit 1 US ACKNOWLEDGES.
  • EXAMINER'S NOTE: If the applicant continues onward, then inform him "This JPM is Complete."

COMMENTS:

STOP TIME: _ _ __

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821062/Rev 17 Unit 1 and 2 CSTs. 1C AFW PP Page 8 of9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, and Unit 2 CST level is 43 feet.

INITIATING CUES:

You are the Unit 1 NPO. The Unit 1 US has directed you to line up the 1C AFW Pump to take a suction from the Unit 2 CST lAW 1-0NP-09.02, "Auxiliary Feedwater," Appendix D.

fj Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DISCONNECT 1B INSTRUMENT INVERTER FROM SERVICE FOR PREVENTIVE MAINTENANCE - UNIT 1 Bank JPM 0821067/Rev 16 1 B Battery Charger Room NRC P-3 Developed/Revised by: _ _ _ _ _ _ __

Date Training Management Approval: _ _ _ _ _ _ __

Date JPM 0821067/Rev 16 1B Battery Charger Room Page 1 of 8

JOB PERFORMANCE MEASURE Disconnect the 1B 120V Instrument Inverter from service on Unit 1.

Alternate Path JPM? No Facility JPM #: 0821067 KIA Rating(s):

Duty Area(s): NA Task Information: NA Task Standard:

This JPM is complete when the Control Room has been notified that the 1B Instrument Inverter has been transferred to the Maintenance Bypass Bus and the 1B Instrument Inverter is out of service.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E)"

Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E)"

Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • None JPM 0821067/Rev 16 1 B Battery Charger Room Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Disconnect the 1B 120V Instrument Inverter from service.
  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The 1B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove 1B 120V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E)."

JPM 0821067/Rev 16 1 B Battery Charger Room Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E),"

Step 8.6 Removing the 1B Inverter From Service CAUTION CRITICAL

  • Incorrect execution of this section can result in the actuation of Safeguards STEP equipment and a Reactor trip. If any discrepancies are noted during the execution of this section, notify the Control Room immediately. _ _ SAT
  • Prior to closing the applicable bypass breaker, verify that the affected maintenance bypass bus is not currently in use.

_ _ UNSAT NOTE Re-energize the Instrument Bus from its associated inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

STEP 1:(1) Close the following maintenance bypass bus breaker on the maintenance bypass bus for ALTERNATE feed.

  • Inverter 1B: Maintenance Bypass Bus 1B CKT 13 STANDARD: POSITION Maintenance Bypass Bus 1B CKT 13 Breaker to ON.

EXAMINER'S CUE: CKT 13 Breaker is ON COMMENTS:

STEP 2:(2) Verify the following maintenance bypass bus power available light in Transfer panel is on.

Transfer Panel 1B _ _ SAT

  • Ll1 01 0-2 Maint. Bypass Bus 1B Feed to Instr. Bus 1MB

_ _ UNSAT STANDARD: VERIFY light Ll1 01 0-2 is ON at Transfer Panel 1B.

EXAMINER'S CUE: Light Ll1 01 0-2 is ON COMMENTS:

JPM 0821067/Rev 16 1B Battery Charger Room Page 4 of8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION The "IN SYNC light shall be verified to be on prior to removing the instrument inverter from service. If the light is not on, stop. Do not continue. Notify ElM Department.

SAT STEP 3: (3) Verify the following sync signal breaker on the maintenance bypass bus is closed. _ _ UNSAT

  • Inverter 1B: Maintenance Bypass Bus 1B CKT 3 STANDARD: VERIFY Inverter 1 B Maintenance Bypass Bus 1B CKT 3 Breaker is CLOSED.

EXAMINER'S CUE: CKT 3 Breaker is ON.

COMMENTS:

STEP 4: (3A) Verify the "IN SYNC" light is on (on the applicable inverter).

STANDARD: VERIFY IN SYNC light is "ON" on Inverter 1B SAT EXAMINER'S CUE: IN SYNC light on Inverter 1 B is ON UNSAT COMMENTS:

STEP 5: (4) Place the following Transfer switch in the Maintenance Bypass Bus position. CRITICAL STEP

  • Transfer Panel 1B Transfer switch SS-1 01 0-1 1MB Maintenance Bypass _ _ SAT Bus 1B STANDARD: POSITION Transfer switch SS-1010-1 to MAINTENANCE BYPASS BUS 1B UNSAT EXAMINER'S CUE: Transfer switch 55-1010-1 is in MAINTENANCE BYPASS BUS 1 B POSITION COMMENTS:

JPM 0821067/Rev 16 1 B Battery Charger Room Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (5) Notify the Control Room the 1B instrument bus is being powered from the Maintenance Bypass Bus.

STANDARD: NOTIFY Control Room that 1B Instrument Bus is now being powered from SAT the Maintenance Bypass Bus.

EXAMINER'S CUE: CONTROL ROOM ACKNOWLEDGES UNSAT COMMENTS:

STEP 7(6) Open the inverter breakers on the front of the 1B inverter in the following CRITICAL order: STEP A. 1MB-CB-6 (Inverter System Output) _ _ SAT B. 1MB-CB-4 (Inverter Alternate Source)

C. 1MB-CB-2 (Inverter Output)

D. 1MB-CB-1 (DC Input) _ _ UNSAT STANDARD: POSITION Breakers 1MB-CB-6, 1MB-CB-4, 1MB-CB-2, and 1MB-CB-1 on Inverter 1B to OFF in that order EXAMINER'S CUE: As Student positions these Breakers, cue that the respective breaker is OFF COMMENTS:

STEP 8 (7) Open the 1B inverter supply breaker on the 125V DC bus. CRITICAL STEP

  • Inverter 1B: DC Bus 1B 1-60224

_ _ SAT STANDARD: POSITION DC Bus 1B Breaker 1-60224 to OFF EXAMINER'S CUE: Breaker 1-60224 is OFF _ _ UNSAT COMMENTS:

JPM 0821067/Rev 16 1 B Battery Charger Room Page 6 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9: (8) Open the 1B sync signal breaker on the maintenance bypass bus. CRITICAL STEP

  • Inverter 1B: Maintenance Bypass Bus 1B CKT 3

, _ _ SAT STANDARD: POSITION Maintenance Bypass Bus 1B CKT 3 Breaker to OFF EXAMINER'S CUE: CKT 3 breaker is OFF UNSAT COMMENTS:

STEP (done ): Notify the Control Room the 1B inverter is out of service.

STANDARD: NOTIFY the Control Room that Inverter 1B has been REMOVED from service _ _ SAT EXAMINER'S CUE: CONTROL ROOM ACKNOWLEDGES UNSAT COMMENTS:

END OF TASK STOP TIME: _ _ __

JPM 0821067/Rev 16 1B Battery Charger Room Page 7 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The 1B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove 1B 120V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E)."

Page 8 of 8

JOB PERFORMANCE MEASURE Task: Start the 2C AFW pump and feed the 2A SG.

Alternate Path JPM? Yes Facility JPM #: N/A K/A Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is completed when the 2C AFW pump electrical overspeed trip is reset and the 2C AFW pump is feeding the 2A SG.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

Tools/Equipment/Procedures Needed:

  • 2-NOP-09.02 AUXILIARY FEEDWATER Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:

None JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Start the 2C AFW Pump and feed the 2A SG.
  • The performance level to be used for this JPM is PERFORM.
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The Unit is in Mode 3 NOP/NOT. The 2A AFW tripped. The 2C AFW pump is ready to be started to feed the 2A SG.

INITIATING CUES:

The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 6.4.5 and feed the 2A SG.

JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

2-NOP-09.02 Auxiliary Feedwater STEP 1: (6.4.5) START the 2C Auxiliary Feedwater Pump FAULTED STEP

_ _ SAT STANDARD: OPEN MV-08-12, B MS to 2C AFW Pump Isol.

AND/OR OPEN MV-08-13, A MS to 2C AFW Pump Isol. _ _ UNSAT EXAMINERS NOTE: 2C AFW will trip on electrical overs peed COMMENTS:

STEP 2: (6.4.6) ENSURE turbine speed is stable between 3700 and 3800 rpm and the governor is not hunting / oscillating.

_ _ SAT STANDARD: RECOGNIZE 2C AFW pump has tripped on electrical overspeed.

_ _ UNSAT EXAMINERS NOTE: Candidate should recognize electrical overspeed by:

. MV-08-3 in closed position AND annunciator G-46 resetting.

EXAMINERS CUE: If Candidate asks US permission to feed the 2A SG with the 28 AFW via crosstie valves, state you want him to use AFW ONP and attempt to use 2C AFW pump to feed the 2A SG.

COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (2.A) IMPLEMENT 2-0NP-09.02 Appendix A Step 2 and reset the 2C AFW pump CRITICAL electrical overspeed by: STEP STANDARD: CLOSE MV-08-12 SG 2B Stem to AFW Pp 2C.

- - SAT EXAMINERS CUE: - - UNSAT COMMENTS:

CRITICAL STEP 4: (2.B) RESET 2C AFW Pp electrical overspeed STEP STANDARD: CLOSE MV-08-13 SG 2A Stem to AFW Pp 2C.

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

STEP 5: (2.C.1) PERFORM the following to reset and open MV-08-3, 2C Pump on RTGB- CRITICAL 202 STEP STANDARD: PLACE MV-08-3 2C Pump Key 78, key switch to CLOSE.

- - SAT EXAMINERS CUE: - - UNSAT COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (2.C.2) PERFORM the following to reset and open MV-08-3, 2C Pump on RTGS- CRITICAL 202 STEP STANDARD: RETURN MV-08-3 Srk2C Pump Key 78, key switch to OPEN

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

STEP 7: (2.C.3) PERFORM the following to reset and open MV-08-3, 2C Pump on RTGS-202

- - SAT STANDARD: VERIFY MV-08-3 Throttle / Trip Valve for AFW Pump 2C OPEN.

- - UNSAT EXAMINERS CUE:

COMMENTS:

STEP 8: (2.0) VERIFY the pump has stopped rotating.

- - SAT STANDARD: CONTACT the NOP to determine if pump has stopped rotating.

EXAMINERS CUE: Inform the Candidate the Pump has stopped rotating.

- - UNSAT COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9: (2.E) PERFORM ONE of the following to drain oil from the underside of the governor main speed piston

- - SAT STANDARD: 1. WAIT 3 minutes after the pump stops rotating

- - UNSAT OR

2. a. PLACE manual control knob on the side of the turbine governor FULL Y COUNTER CLOCKWISE
2. b. RETURN manual control knob on turbine governor FULL CLOCKWISE EXAMINERS CUE: It has been three minutes since pump has stopped rotating COMMENTS:

STEP 10: (2.F) ENSURE MV-09-11, Pump 2C to S/G 2A is CLOSED - - SAT STANDARD: VERIFY MV-09-11, Pump 2C to S/G 2A is CLOSED.

- - UNSAT EXAMINERS CUE:

COMMENTS:

STEP 11: (2.Gl ENSURE MV-09-12, Pump 2C to S/G 2B is CLOSED

- - SAT STANDARD: VERIFY MV-09-12, Pump 2C to S/G 2B is CLOSED EXAMINERS CUE:

- - UNSAT COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12: (2.H) IF BOTH Steam Generators are intact and NOT faulted, THEN OPEN the CRITIAL following SIMULTANEOUSLY STEP STANDARD: 1.:. OPEN MV-08-13, SG 2A Steam to AFW Pp 2C - - SAT

2. OPEN MV-08-12, SG 2B Steam to AFW Pp 2C EXAMINERS CUE:

- - UNSAT COMMENTS:

CRITICAL STEP 13: (2.J) IF flow is to be restored to the 2A S/G THEN ENSURE OPEN SE-09-4 2C STEP Pump Disch to 2A S/G Vlv Key 85 STANDARD: OPEN SE-09-4 2C Pump Disch to 2A S/G Vlv Key 85

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

CAUTION CRITICAL Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can STEP result in water hammer and thermal shock. Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows: - - SAT

  • If using Main Feedwater OR Condensate, 'As low as possible' for the first 5 minutes OR until SG level has risen. - - UNSAT STEP 14: (2.L) To restore flow to the 2A S/G THROTTLE MV-09-11, Pump 2C to S/G to desired f1owrate.

STANDARD: THROTTLE MV-09-11, Pump 2C to S/G to 150 gpm.

EXAMINERS CUE: Terminate JPM when candidate has established flow to the 2A SG from the 2C AFW pump.

COMMENTS:

STOP TIME: _ _ _ __

JPM NRC S-1 Rev 0 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The Unit is in Mode 3 NOP/NOT. The 2A AFW tripped. The 2C AFW pump is ready to be started to feed the 2A SG.

INITIATING CUES:

The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 6.4.5 and feed the 2A SG.

9 of 10

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET

1. IC #6 File S-5 Afw.lsn Mode 3 NOP/NOT
2. Scenario triggers electrical overspeed of the 2C AFW pump 30 seconds after start
3. Ensure 2C steam admission valves are closed and 2C AFW pump is NOT running
4. Place 2A AFW pump to stop and close associated valves 10 of 10

fj FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-2 Developed/Revised by: _ _ _

La_rryL-R_ic_h_ _ 4/01/08 Date Training Management Approval: - - - - - - -

Date JPM NRC S-2 Rev 0 SIMULATOR Page 1 of 8

JOB PERFORMANCE MEASURE Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM? Yes Facility JPM #: N/A KIA Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

Tools/Equipment/Procedures Needed:

  • 2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-2 Rev 0 SIMULATOR Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Re-establish RCP bleedoff flow.
  • The performance level to be used for this JPM is PERFORM.
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning ,the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The Unit is at 100%. RCP controlled bleedoff flow has been lost.

INITIATING CUES:

The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.

JPM NRC S-2 Rev 0 SIMULATOR Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (6.3.5.1} IF normal Controlled Bleedoff can NOT be VERIFIED, Then open CRITICAL V2507 RCP Bleedoff Relief Stop Vlv. STEP STANDARD: OPEN V2507 RCP Bleedoff Relief Stop Vlv.

- - SAT EXAMINERS NOTE: Upon opening V2507, three seals fail on 281 RCP

- - UNSAT EXAMINERS CUE:

COMMENTS:

STEP 4: (6.3.9.A} IF three seals have failed Then TRIP the Reactor CRITICAL STEP TRIP the Reactor STANDARD: TRIP the Reactor

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

STEP 5: (6.3.9.B} IF three seals have failed Then: TRIP the Turbine

- - SAT STANDARD: TRIP the Turbine

- - UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-2 Rev 0 Simulator Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (6.3.9.C) Done STOP the affected RCP(s) CRITICAL STEP STANDARD: STOP the 2B1 RCP SAT EXAMINERS CUE: The JPM is complete when the 2B1 RCP has been stopped.

UNSAT COMMENTS:

STOP TIME: _ _ _ __

JPM NRC S-2 Rev 0 Simulator Page 6 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The Unit is at 100%. RCP controlled bleedoff flow has been lost.

INITIATING CUES:

The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.

7 of 8

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET

1. Trigger S-3 Rep .lsn 8 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: FAULTED V2505 RCP Bleedoff Cntmt Isol. Is open. STEP STANDARD: OPEN V2505 RCP Bleedoff Cntmt Isol.

- - SAT

- - UNSAT EXAMINERS NOTE: V2505 will not open COMMENTS:

STEP 2: (6.3.5.B) IF Controlled Bleedoffflow is Lost or Low, Then ENSURE:

V2524 RCP Bleedoff Cntmt Isol. Is open. - - SAT OPEN V2524 RCP Bleedoff Cntmt Isol.

STANDARD: - - UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-2 Rev 0 Simulator Page 4 of 8

JOB PERFORMANCE MEASURE fj FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN THE ECCS FOR SIMULTANEOUS HOT AND COLD LEG INJECTION - UNIT 2 NRC 5-3 Developed/Revised by: _ _...=.::La:.:.:....:.rry~Ri-=-=-ch~_ 4/01/08 Date Training Management Approval: _ _ _ _ _ __

Date JPM NRC S-3 Rev 0 Simulator Page 1 of9

JOB PERFORMANCE MEASURE 07003110, ALIGN SAFETY INJECTION FOR HOT AND COLD LEG INJECTION Alternate Path JPM? Yes Facility JPM #: 0821158 (Modified for NRC exam)

KIA Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US is informed that 28 Hot and Cold leg injection is aligned.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-EOP-99, Appendix 0, "Simultaneous Hot and Cold Leg Injection" Validation Time: 15 minutes Time Critical:

Tools/Equ i pmentiProcedu res Needed:

  • None Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-3 Rev 0 Simulator Page 2 of9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Align the 2B HPSI to Provide Hot and Cold Leg Injection - Unit 2
  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the p~rformance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can NOT be established. 2A and 2B HPSI pumps are running.

INITIATING CUES:

You are the RCO. The US has directed you to complete Section 2, Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for B side ONLY.

JPM NRC S-3 Rev 0 Simulator Page 30f9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

Section 2: Aligning 28 HPSI for Hot Leg Injection:

STEP 1 (1) OPEN V3551 , To Hot Leg 2B Valve. CRITICAL STEP STANDARD: POSITION V3551 control switch to OPEN.

- - SAT EXAMINER'S CUE:

COMMENTS: - - UNSAT STEP 2 (2) OPEN V3523, To Hot Leg 2B Valve. FAULTED STEP STANDARD: POSITION V3523 control switch to OPEN.

- - SAT EXAMINERS NOTE: V3523 will not open EXAMINER'S CUE: When Candidate recognizes V3523 will not open, inform him as US to align the A side for Hot and Cold Leg Injection - - UNSAT EXAMINERS NOTE: Although not procedurely driven, Candidate should go back and close V3551 , to Hot Leg 28 Valve COMMENTS:

Section 1: Aligning 2A HPSI for Hot Leg Injection STEP 3: (1) OPEN V3550, To Hot Leg 2A Valve. CRITICAL STEP STANDARD: POSITION V3550 control switch to OPEN.

EXAMINER'S CUE: - - SAT COMMENTS:

- - UNSAT JPM NRCS-3 RevO Simulator Page 4 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: (2} OPEN V3540, To Hot Leg Valve. CRITICAL STEP STANDARD: POSITION V3540 control switch to OPEN EXAMINER'S CUE:

- - SAT COMMENTS: - - UNSAT STEP 5: (3} CLOSE V3656, Pump 2A Discharge Valve. CRITICAL STEP STANDARD: POSITION V3656 control switch to CLOSE EXAMINER'S CUE:

- - SAT COMMENTS: - - UNSAT STEP 6: (4} VERIFY flow to the 2A Hot Leg is greater than or equal to 250 gpm on ANY of the following instruments:

  • FR-3317 HPSI to Hot leg 2A Flow STANDARD: OBSERVE FI-3315 or FR-3317 - - UNSAT EXAMINER'S CUE:

COMMENTS:

JPM NRCS-3 RevO Simulator Page 5 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7: (5) IE ONE HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 250 gpm by the TOTAL of all FOUR of the following instruments:

  • FI-3311 HPSI Loop 2A2 Flow
  • FI-3331 HPSI Loop 281 Flow
  • FI-3341 HPSI Loop 282 Flow - - UNSAT STANDARD: DETERMINE that two HPSI Pumps are running and this step is N/A EXAMINER'S CUE:

COMMENTS:

STEP 8: (6) IF TWO HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 440 gpm by the TOTAL of all FOUR of the following instruments:

. - - SAT

  • FI-3321 HPSI Loop 2A1 Flow
  • FI~3311 HPSI Loop 2A2 Flow
  • FI-3331 HPSI Loop 281 Flow - - UNSAT
  • FR-3313 13323 HPSI Loop 2A2 & 2A1 Flow
  • FR-3333 13343 HPSI Loop 282 & 281 Flow STANDARD: OBSERVE Flow instruments listed above EXAMINER'S CUE:

COMMENTS:

JPM NRCS-3 RevO Simulator Page 6of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP Done: Notify the US that the 2A HPSI train is Aligned for simultaneous Hot and Cold Leg injection.

STANDARD: NOTIFY the US that simultaneous Hot and Cold Leg injection is ALIGNED _ _ SAT to the 2A HPSI train.

EXAMINER'S CUE: US ACKNOWLEDGES. UNSAT COMMENTS:

END OF TASK STOP TIME: _ _ __

JPM NRCS-3 RevO Simulator Page 7 of 9

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE File XR021.Dat.
2. V3523 is failed closed in Ie set.
3. UNFREEZE the Simulator when the student is ready.

JPM NRC S-3 RevO Simulator Page 8 of 9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can NOT be established. 2A and 28 HPSI pumps are running.

INITIATING CUES:

You are the RCO. The US has directed you to complete Section 2 Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for 8 side ONLY.

Page 9 of9

fj Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ALTERNATE CHARGING FLOWPATH TO RCS THROUGH 'A' HPSI HEADER - UNIT 2 Bank JPM 0821115/R11 Simulator NRC S-4 Developed/Revised by: - - J.W. -- Weeks

--- 4/25/07 Date Training Management Approval: _ _ _ _ _ __

Date JPM 0821115/R11 Simulator or U2 Control Room Page 1 of 9

JOB PERFORMANCE MEASURE Task: 05002180, Respond to a Loss of Charging 07002130, ALIGN ALTERNATE CHARGING FLOW PATH 07002610, VERIFY BORATION FLOW PATH 07002650, EMERGENCY BORATE THE RCS Alternate Path JPM? No Facility JPM #: 0821115 KIA Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US is notified that emergency boration has been established through the

'A' High Pressure Safety Injection Header.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X X X

References:

2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header" Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • None JPM 0821115/R11 Simulator or U2 Control Room Page 2 of9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is:
  • Establish Alternate Charging Flow Path through 'A' HPSI Header - Unit 2
  • The performance level to be used for this JPM is Perform, or Simulate.

(Circle the performance level being used for this implementation of the JPM)

  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.

Subsequent to the trip it was discovered that two CEAs had stuck out and emergency boration was begun. The SNPO reported a pipe break in the charging header between V2429 and V2523, and the emergency boration line-up was secured. With the loss of the Reactivity Control safety function, it was decided to enter 2-EOP-15.

INITIATING CUES:

You are the Desk RCO. The US has directed you to emergency borate using 'A' HPSI header and the 2A Charging Pump per 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through

'A' HPSI Header."

JPM 0821115/R11 Simulator or U2 Control Room Page 3 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header."

STEP 1: (1) ENSURE letdown is ISOLATED.

STANDARD: Verify all letdown Isolation Valves CLOSED.

- - SAT

  • EXAMINER'S CUE: All letdown isolation valves closed, Green light ON, - - UNSAT Red light OFF.

COMMENTS:

STEP 2: (2) PLACE ALL Charging Pump in STOP.

STANDARD: VERIFY ALL Charging Pump control switches to STOP.

- - SAT

  • EXAMINER'S CUE: ALL charging Pumps are in STOP, Green light ON, Red - - UNSAT light OFF.

COMMENTS:

STEP 3: (3) PLACE 2A HPSI Pump in STOP.

STANDARD: POSITION 2A HPSI Pump switch in STOP. - - SAT

  • EXAMINER'S CUE: 2A HPSI pump switch in STOP, Green light ON, Red light OFF. - - UNSAT COMMENTS:

STEP 4: (4) CLOSE V3656, HPSI Pump 2A Discharge Valve. CRITICAL STEP STANDARD: OBTAIN key #67, POSITION V3656 to CLOSED.

- - SAT

  • EXAMINER'S CUE: V3656 indicates Green light ON, Red light OFF Q-33 Alarms.

- - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821115/R11 Simulator or U2 Control Room Page 4 of9

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST STEP 5: (5.A) Locally OPEN V2340, Charging Pump Discharge to 'A' HPSI Header Isolation. (located in 2C Charging Pump Room). CRITICAL STEP STANDARD: DIRECT SNPO to OPEN V2340.

- - SAT

  • EXAMINER'S CUE: The SNPO Reports V2340 is OPEN.

COMMENTS: - - UNSAT STEP 6: (5.S) if desired to use ANY combination of Charging Pump, Then locally LOCK CRITICAL CLOSED V2429, Charging Pump Discharge Isolation. STEP STANDARD: DIRECT THE SNPO to locally LOCK CLOSED V2429. - - SAT

  • EXAMINER'S CUE: The SNPO REPORTS that V2429 is LOCK CLOSED.

- - UNSAT EXAMINER'S NOTE: Break is downstream of V2429 per the cue therefore V2429 is to be closed. Located in pipe penetration room at Penetration Number 27.

COMMENTS:

STEP 7: (5.0) Locally OPEN V3519, Charging Pump to 'A' HPSI Hdr Isol (Located in "A" CRITICAL HPSI pump room). STEP STANDARD: DIRECT THE SNPO to locally OPEN V3519. - - SAT

  • EXAMINER'S CUE: The SNPO REPORTS that V3519 is OPEN.

COMMENTS:

- - UNSAT

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821115/R11 Simulator or U2 Control Room Page 50f9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8: (6) ENSURE Charging Pump(s) have a suction flowpath from ONE of the following sources: - - SAT Boric Acid Makeup Tank Refueling Water Tank - - UNSAT Volume Control Tank STANDARD: Verify Charging Pump Suction Flowpath.

  • EXAMINER'S CUE: Charging Pump Suction is from the Boric Acid Makeup Tank.

COMMENTS:

STEP 9: (7) ENSURE Charging Pump(s) have a discharge f10wpath by OPENING at CRITICAL least ONE 'A' HPSI Header Loop Isolation Valve: STEP HCV-3617 2A2 Cold Leg - - SAT HCV-3627 2A 1 Cold Leg HCV-3637 2B1 Cold Leg HCV-3647 2B2 Cold Leg - - UNSAT STANDARD: POSITION Anyone of the four valves to OPEN.

  • EXAMINER'S CUE: As anyone of the four Valves is OPENED, indicate the Green light is OFF, Red light is ON.

COMMENTS:

STEP 10: (8) START Charging Pump(s) AS NECESSARY. CRITICAL STEP STANDARD: POSITION the 2A Charging Pump to START.

  • EXAMINER'S CUE: 2A Charging Pump indicates Green light OFF and Red

- - SAT light ON. Recirc Valve Indicates BOTH lights ON. After 3 minutes Recirc Indicates Green light ON and Red light OFF.

- - UNSAT EXAMINER'S CUE: As Recirc Valve closes, depending on which SI Header Valve is opened, R-46, 47, 56 or 57 Alarms and Loop Pressure PIA-3329, 3319, 3339 or 3349 Indicates -1980 psig.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821115/R11 Simulator or U2 Control Room Page 6 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (9) VERIFY flow to the RCS by ANY of the following:

Pressurizer level rising

- - SAT Indicated flow on applicable HPSI Loop Flow Indicator

- - UNSAT STANDARD: OBSERVE Pressurizer Level and HPSI flow for PROPER indication.

  • EXAMINER'S CUE: Pressurizer Level is slowly RISING and applicable HPSI Loop Flow Indicates 44 gpm.

COMMENTS:

STEP (done}: NOTIFY the US that emergency boration and charging flow has been established through the 'A' High Pressure Safety Injection Header using the 2A Charging Pump .

STANDARD: . NOTIFY the US that emergency boration and charging flow has been ESTABLISHED through the 'A' High Pressure Safety Injection Header using the 2A Charging Pump.

EXAMINER'S CUE: US ACKNOWLEDGES COMMENTS:

END OF TASK STOP TIME: _ _ __

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821115/R11 Simulator or U2 Control Room Page 7of9

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1. UNFREEZE the Simulator.
2. SELECT the Lesson File Folder for JPM.
3. OPEN the Lesson File for 0821115 and EXECUTE the Lesson.
4. TRIGGER STEP 1.
5. After Letdown isolates on high temperature, CLOSE all three Letdown valves and PLACE all Charging pumps in STOP.
6. Line up Emergency Boration by performing the following steps:

>- START 2A or 2B BA Pump.

>- CLOSE V2650, Tank 2A Recirc. Valve.

>- CLOSE V2651 , Tank 2B Recirc Valve.

>- OPEN V2514, Emergency Borate.

7. The Simulator will automatically FREEZE after about 5 minutes. All SPTAs are performed by the scenario.
8. STORE a temporary IC set if more than one student is to take the JPM. Note: The lesson will have to be stopped and then re-executed each time the temporary IC set is restored.
9. UNFREEZE the simulator when the student is ready.
10. TRIGGER STEP 'Open V2340' when directed to do so by the student.
11. TRIGGER STEP 'Close V2429' when directed to do so by the student.
12. TRIGGER STEP 'Open V3519' when directed to do so by the student.

JPM 0821115/R10 Simulator or U2 Control Room Page 8of9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.

Subsequent to the trip it was discovered that two CEAs had stuck out and emergency boration was begun. The SNPO reported a pipe break in the charging header between V2429 and V2523, and the emergency boration line-up was secured. With the loss of the Reactivity Control safety function, it was decided to enter 2-EOP-15.

INITIATING CUES:

You are the Desk RCO. The US has directed you to emergency borate using 'A' HPSI header and the 2A Charging Pump per 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through

'A' HPSI Header."

fj Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 Bank JPM 0821117A1R07 Simulator NRC S-5 Developed/Revised by: -------

J.W. Weeks 4/26/07 Date Training Management Approval: - - - - - - -

Date JPM 0821117A1R07 Simulator or U2 Control Room Page 1 of 11

JOB PERFORMANCE MEASURE 07025090, ALIGN SFP VENTILATION TRAINS 07067430, RESPOND TO FUEL HANDLING ACCIDENT Alternate Path JPM? Yes Facility JPM #: 0821117A KIA Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-0NP-26.02.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X X X

References:

2-0NP-26.02, Area Radiation Monitors Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-0NP-26.02, "Area Radiation Monitors" Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM 0821117AfR07 Simulator or U2 Control Room Page 2 of 11

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Respond to high radiation alarm on Spent Fuel Monitors - Unit 2
  • The performance level to be used for this JPM is Perform, or Simulate.

(Circle the performance level being used for this implementation of the JPM)

  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is at 100% power. Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG009, GAG011, and GAG012 are in High Alarm and GAG008 and GAG010 are in Alert Alarm.

2-0NP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO. The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-0NP-26.02, "Area Radiation Monitors," step 4.2.2.0.

JPM 0821117 AfRO?

Simulator or U2 Control Room Page 3 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

VERIFY the following fans are OFF:

STEP 1: (4.2.2.0.1) HVS-6, Fuel Pool Supply Fan.

STANDARD: ENSURE HVS-6 is OFF.

  • EXAMINER'S CUE: HVS-6 indicates Green light ON, Red light OFF.

- - SAT COMMENTS: - - UNSAT STEP 2: (4.2.2.D.1) HVS-7, Fuel Handling Bldg Supply Fan.

STANDARD: ENSURE HVS-7 is OFF.

- - SAT

  • EXAMINER'S CUE: HVS-7 indicates Green light ON, Red light OFF.

COMMENTS: - - UNSAT STEP 3: (4.2.2.D.1) HVE-1S, Fuel Handling Bldg Exhaust Fan.

STANDARD: ENSURE HVE-1S is OFF.

- - SAT

  • EXAMINER'S CUE: HVE-1S indicates Green light ON, Red light OFF.

COMMENTS: - - UNSAT STEP 4: (4.2.2.D.1) HVE-16A, Fuel Pool Exhaust Fan.

STANDARD: ENSURE HVE-16A is OFF.

  • EXAMINER'S CUE: HVE-16A indicates Green light ON', Red light OFF.

- - SAT COMMENTS: - - UNSAT

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117AfR07 Simulator or U2 Control Room Page 4 of 11

\

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (4.2.2.0.1) HVE-16B, Fuel Pool Exhaust Fan.

STANDARD: ENSURE HVE-16B is OFF.

~

- - SAT

  • EXAMINER'S CUE: HVE-16B indicates Green lights ON, Red lights OFF COMMENTS: - - UNSAT STEP 6: (4.2.2.0.1) HVE-17, Fuel Bldg Swgr Area Exhaust Fan (local indication only).

STANDARD: DIRECT the SNPO to locally STOP HVE-17.

  • EXAMINER'S CUE: SNPO reports that HVE-17 is STOPPED.

- - SAT COMMENTS: - - UNSAT STEP 7: (4.2.2.0.2) VERIFY the following FHB dampers are CLOSED:

  • 0-33, Fuel Hdlg Bldg Inlet Damper
  • 0-34, Fuel Hdlg Bldg Inlet Damper - - UNSAT
  • 0-36, Fuel Hdlg Bldg Outlet Damper
  • 0-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers 0-29 through 0-36 are CLOSED.
  • EXAMINER'S CUE: Dampers D-29 through D-36 indicate Green light ON, Red light OFF as each damper is verified.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117 AfR07 Simulator or U2 Control Room Page 5 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the following components are aligned as indicated:

STEP 8: (4.2.2.0.3) FCV-25-30, Fuel Handling Emerg Vent Vlv, is OPEN. FAULTED STEP STANDARD: OBSERVE FCV-25-30 CLOSED.

_ _ SAT

  • EXAMINER'S CUE: FCV-2S-30 indicates Green light ON, Red Light OFF.

EVALUATOR'S NOTE: Faulted Step FCV-2S-30 failed to auto OPEN. _ _ UNSAT COMMENTS:

CONTINGENCY ACTION: CRITICAL STEP STEP 9: (4.2.2.D.3) PERFORM the following on the HVCB:

_ _ SAT OPEN FCV-25-30 at the HVAC panel.

STANDARD: POSITION FCV-25-30 control switch to OPEN. _ _ UNSAT

  • EXAMINER'S CUE: FCV-2S-30 indicates Green light OFF, Red Light ON.

X-4 Alarms as delta-P lowers.

COMMENTS:

STEP 10: (4.2.2.0.3) FCV-25-32, SBVS Isolation Valve, is CLOSED. FAULTED STEP STANDARD: OBSERVE FCV-25-32 OPEN.

  • EXAMINER'S CUE: FCV-2S-32 indicates Green light OFF, Red Light ON. _ _ SAT EVALUATOR'S NOTE: Faulted Step FCV-2S-32 failed to auto CLOSE.

_ _ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117A/R07 Simulator or U2 Control Room Page 6 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP 11: (4.2.2.0.3) PERFORM the following on the HVCB: STEP CLOSE FCV-25-32 at the HVAC panel. SAT STANDARD: POSITION FCV-25-32 control switch to CLOSE.

UNSAT

  • EXAMINER'S CUE: FCV-25*32 indicates Green light ON, Red Light OFF.

V*20 Alarms.

COMMENTS:

STEP 12: (4.2.2.0.3) HVE-6A, SBVS Exhaust Fan, is ON.

STANDARD: ENSURE HVE-6A is ON.

_ _ SAT

  • EXAMINER'S CUE: HVE*6A indicates Green light OFF, Red light ON.

COMMENTS: UNSAT FAULTED STEP 13: (4.2.2.0.3) FCV-25-31, Fuel Handling Emerg Vent Vlv., is OPEN. STEP STANDARD: OBSERVE FCV-25-31 CLOSED.

_ _ SAT

  • EXAMINER'S CUE: FCV*25*31 indicates Green light ON, Red Light OFF.

EVALUATOR'S NOTE: Faulted Step FCV*25*31 failed to auto OPEN. _ _ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117 AfR07 Simulator or U2 Control Room Page 7 of 11

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST CONTINGENCY ACTION: CRITICAL STEP 14: (4.2.2.0.3) PERFORM the following on the HVCB: STEP OPEN FCV-25-31 at the HVAC panel. _ _ SAT STANDARD: POSITION FCV-25-31 control switch to OPEN.

_ _ UNSAT

  • EXAMINER'S CUE: FCV-25-31 indicates Green light OFF, Red Light ON.

COMMENTS:

FAULTED STEP 15: (4.2.2.0.3) FCV-25-33, SBVS Isolation Valve, is CLOSED. STEP STANDARD: OBSERVE FCV-25-33 OPEN.

_ _ SAT

  • EXAMINER'S CUE: FCV-25-33 indicates Green light OFF, Red Light ON.

EVALUATOR'S NOTE: Faulted Step FCV-25-33 failed to auto CLOSE. _ _ UNSAT COMMENTS:

CONTINGENCY ACTION: CRITICAL STEP 16: (4.2.2.D.3) PERFORM the following on the HVCB: STEP CLOSE FCV-25-33 at the HVAC panel. _ _ SAT STANDARD: POSITION FCV-25-33 control switch to CLOSE.

_ _ UNSAT

  • EXAMINER'S CUE: FCV-25-33 indicates Green light ON, Red Light OFF.

V-21 Alarms.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117AfR07 Simulator or U2 Control Room Page 8 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17: (4.2.2.0.3) HVE-6B, SBVS Exhaust Fan, is ON.

STANDARD: ENSURE HVE-6B is ON.

- - SAT

  • EXAMINER'S CUE: HVE-SB indicates Green light OFF, Red light ON.

COMMENTS: - - UNSAT STEP (done): NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-0NP-26.02 and FCV-2S-30 and FCV-2S-31 had to be manually opened, FCV-2S-32 and FCV-2S-33 had to be manually closed. - - SAT STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED and FCV-2S-30 and FCV-2S-31 had to be manually OPENED - - UNSAT and FCV-2S-32 and FCV-2S-33 had to be manually CLOSED.

EXAMINER'S CUE: US ACKNOWLEDGES.

COMMENTS:

END OF TASK STOP TIME: _ _ __

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM 0821117AfR07 Simulator or U2 Control Room Page 9 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1.
2. UNFREEZE the Simulator.
3. SELECT the JPM Lesson File Folder.
4. OPEN and EXECUTE the lesson for 0821117A. ACKNOWLEDGE the PC-11 alarm.
5. FREEZE the Simulator.
6. STORE a Temporary IC set if more than one student will be performing the JPM. UNFREEZE the Simulator for a few seconds and then FREEZE the Simulator. ACKNOWLEDGE the PC-11 alarm.

Note: The lesson will have to be stopped and then re-executed each time the temporary IC set is restored.

7. UNFREEZE the Simulator when the student is ready to begin.

JPM 0821117 AfR07 Simulator or U2 Control Room Page 10 of 11

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is at 100% power. Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG009, GAG011, and GAG012 are in High Alarm and GAG008 and GAG010 are in Alert Alarm.

2-0NP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO. The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-0NP-26.02, "Area Radiation Monitors," step 4.2.2.0.

Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions" FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Bank JPM 0821021/Rev 12 PLACE LTOP IN SERVICE - UNIT 1 Unit 1 Control Room NRC C-6 Developed/Revised by: _----=J=--"=--0,----"C=--=a.:.c. .Jrp=--=e-,--n.: . .: .te-,--r__

Date Training Management Approval: - - - - - - - -

Date JPM0821021/Rev 12 Unit 1 Control Room Page 1 of 8

JOB PERFORMANCE MEASURE Place Low Temperature Overpressure Protection in Service on Unit 1.

Alternate Path JPM? No Facility JPM #: 0821021 K/A Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when LTOP has been placed in service.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown" Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM0821021/Rev 12 Unit 1 Control Room Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Place Low Temperature Overpressure Protection in Service on Unit 1.

  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 experienced a LOCA from a full power condition. 1-EOP-3 is being implemented. RCS temperature is 290°F and Pressurizer pressure is 500 psia. Annunciator H-15, PORV LOW RANGE CONDITION SELECT LOW, is in alarm.

INITIATING CUES:

You are the Desk RCO. The US has directed you to place LTOP in service in accordance with 1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown."

JPM0821021/Rev 12 Unit 1 Control Room Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST START TIME: _ _ __

1-GOP-305, Step 6.34 When RCS temperature is less than 304°F, but greater than 281°F, Then place LTOP in service as follows:

STEP 1: (6.34.1} Verify Annunciator H-15, PORV Low Range Condition Select Low, is in alarm.

STANDARD: VERIFY Annunciator H-15 is in ALARM (per Initial Condition) - - SAT EXAMINER'S CUE: Annunciator H-15 is in ALARM

- - UNSAT COMMENTS:

STEP 2: (6.34.2} Verify Annunciator H-21, Przr Relief Valve Anticipatory Alarm, is NOT in alarm.

STANDARD: VERIFY Annunciator H-21 is NOT in ALARM - - SAT EXAMINER'S CUE: Annunciator H-21 is CLEAR

- - UNSAT COMMENTS:

STEP 3: (6.34.3.A} Perform the following for V1402, PORV: CRITICAL STEP A. CLOSE V1403, PORV Block Vlv.

STANDARD: POSITION V1403 to CLOSED

- - SAT EXAMINER'S CUE: V1403 indicates Green light ON, Red light OFF - - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM0821021/Rev 12 Unit 1 Control Room Page 4 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: (6.34.3.8) Perform the following for V1402, PORV: CRITICAL STEP B. PLACE the selector switch for PORV V1402 in the LOW RANGE position. _ _ SAT STANDARD: POSITION HS-1402 mode selector switch to LOW RANGE UNSAT EXAMINER'S CUE: HS-1402 mode switch is in LOW RANGE COMMENTS:

STEP 5: (6.34.3.C) Perform the following for V1402, PORV:

C. Verify PORV V1402 did NOT open.

SAT STANDARD: VERIFY that PORV V1402 remains CLOSED EXAMINER'S CUE: V1402 indicates Green light ON, Red light OFF _ _ UNSAT COMMENTS:

STEP 6: (6.34.3.0) Perform the following for V1402, PORV: CRITICAL STEP D. OPEN V1403, PORV Block Vlv.

SAT STANDARD: POSITION V1403 to OPEN EXAMINER'S CUE: V1403 indicates Green light OFF, Red light ON UNSAT COMMENTS:

STEP 7: (6.34.4.A) Perform the following for V1404, PORV: CRITICAL STEP A. CLOSE V1405, PORV Block Vlv.

_ _ SAT STANDARD: POSITION V1405 to CLOSED EXAMINER'S CUE: V1405 indicates Green light ON, Red light OFF _ _ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM0821021/Rev 12 Unit 1 Control Room Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8: (6.34.4.B) Perform the following for V1404, PORV: CRITICAL STEP B. PLACE the selector switch for PORV V1404 in the LOW RANGE position. SAT STANDARD: POSITION HS-1404 mode selector switch to LOW RANGE

_ _ UNSAT EXAMINER'S CUE: HS-1404 mode switch is in LOW RANGE COMMENTS:

STEP 9: (6.34.4.C) Perform the following for V1404, PORV:

C. Verify PORV V1404 did NOT open.

_ _ SAT STANDARD: VERIFY that PORV V1404 remains CLOSED EXAMINER'S CUE: V1404 indicates Green light ON, Red light OFF _ _ UNSAT COMMENTS:

STEP 10: (6.34.4.0) Perform the following for V1404, PORV: CRITICAL STEP D. OPEN V1405, PORV Block Vlv.

_ _ SAT STANDARD: POSITION V1405 to OPEN EXAMINER'S CUE: V1405 indicates Green light OFF, Red light ON _ _ UNSAT H-15 Clears COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM0821021/Rev 12 Unit 1 Control Room Page 6 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (6.34.5} Perform testing of PORVs V1402 and V1403 in accordance with Data Sheet 24, Valve Testing Procedures, of OP-1-001 0125A, Surveillance Data Sheets.

- - SAT STANDARD: DETERMINE PORV testing will be PERFORMED later EXAMINER'S CUE: PORV testing wi.1I be PERFORMED later - - UNSAT COMMENTS:

STEP (donel: NOTIFY the US that LTOP has been placed in service.

STANDARD: NOTIFY the US that LTOP has been placed IN SERVICE.

- - SAT EXAMINER'S CUE: US ACKNOWLEDGES COMMENTS: - - UNSAT END OF TASK STOP TIME: _ _ __

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM0821021/Rev 12 Unit 1 Control Room Page 7 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 experienced a LOCA from a full power condition. 1-EOP-3 is being implemented. RCS temperature is 290°F and Pressurizer pressure is 500 psia. Annunciator H-1S, PORV LOW RANGE CONDITION SELECT LOW, is in alarm.

INITIATING CUES:

You are the Desk RCO. The US has directed you to place LTOP in service in accordance with 1-GOP-30S, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown."

Page 8 of 8

La_rryL-R_ic_h_ _ 4/01/08 Date Training Management Approval: - - - - - - -

Date JPM NRC S-7 Rev 0 SIMULATOR Page 1 of 10

JOB PERFORMANCE MEASURE Task: Align the 2C CCW pump to the 'B' CCW header in accordance with 2-0310030 COMPONENT COOLING WATER OFF-NORMAL OPERATION.

Alternate Path JPM? No Facility JPM #: N/A KIA Rating(s):

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is completed when the 2C CCW pump is operating on the 'B' CCW header and the 2AB 4.16 KV bus is aligned to the 'B' side.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-0310030 COMPONET COOLING WATER OFF-NORMAL OPERATION.
  • 2-NOP-52.02 ALIGNMENT OF 2AB BUSES AND COMPONENTS Validation Time: 15 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-0310030 COMPONENT COOLING WATER OFF-NORMAL OPERATION.
  • 2-NOP-52.02 ALIGNMENT OF 2AB BUSES AND COMPONENTS Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-7 Rev 0 SIMULATOR Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Start the 2C CCW pump on the 'B side and align the 2AB 4.16KV bus to the 'B' side.

  • The performance level to be used for this JPM is SIMULATE.
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The Unit is at 100% power. The 2B CCW pump has tripped and cannot be started. The 2C CCW pump is available to be aligned and started on the 2B CCW header.

INITIATING CUES:

The US directs you to align and start the 2C CCW on the 2B header in accordance with 2-0310030 COMPONENT COOLING WATER OFF-NORMAL OPERATION.

JPM NRC S-7 Rev 0 SIMULATOR Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

2-0310030 COMPONENT COOLING WATER OFF-NORMAL OPERATION.

STEP 1: (6.2.3.B.1) ENSURE Closed MV-14-1 2C CCW Pump Discharge to A Header. CRITICAL STEP

_ _ SAT STANDARD: CLOSE MV-14-1 2C CCW Pump Discharge to A Header.

_ _ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 2: (6.2.3.B.1) ENSURE Closed MV-14-3 2C CCW Pump Suction from A Header: CRITICAL STEP STANDARD: CLOSE MV-14-3 2C CCW Pump Suction from A Header

_ _ SAT EXAMINERS CUE:

_ _ UNSAT COMMENTS:

JPM NRC S-7 Rev 0 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (6.2.3.B.2) ENSURE open MV-14-2 2C CCW Pump Discharge to B Header: CRITICAL STEP STANDARD: OPEN MV-14-2 2C CCW Pump Discharge to B Header.

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

CRITICAL STEP 4: (6.2.3.B.2) ENSURE open MV-14-4 2C CCW Pump Suction from B Header STEP STANDARD: OPEN MV-14-4 2C CCW Pump Suction from B Header

- - SAT EXAMINERS CUE:

- - UNSAT COMMENTS:

STEP 5: (6.2.3.B.3) IF SDC cooling is in service and CCW is completely lost to an SDC Heat Exchanger, Then SDC flow must be terminated to the affected heat exchanger prior to restoring CCW flow. REFER to ONOP 2-0440030

- - SAT Shutdown Cooling Of-Normal.

- - UNSAT STANDARD: DETERMINE SDC not in service, step N/A EXAMINERS CUE:

COMMENTS:

JPM NRC S-7 Rev 0 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (6.2.3.B.4) REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02' PRIOR to starting the 2C CCW Pump on the 2B CCW Header _ _ SAT

~) ~\Ltl1\

STANDARD: VERIFY Brk. 1-20501, 4.16KV Bus 1AB SBO X-Tie is OPEN _ _ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 6: (6.2.3.B.4) REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header _ _ SAT l,J,'"1J3 STANDARD: VERIFY Brk. 2-20501, 4.16KV Bus 2AB SBO X-Tie is open. _ _ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 7 (6.2.3.B.4) REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR CRITICAL to starting the 2C CCW Pump on the 2B CCW Header STEP

~,"-, (, _ _ SAT STANDARD: OPEN Brk 2-20505 2AB - 2A3 Tie

_ _ UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-7 Rev 0 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (6.2.3.B.4) REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 CRITICAL PRIOR to starting the 2C CCW Pump on the 2B CCW Header STEP L.L1 D _ _ SAT STANDARD: OPEN Brk. 2-20208, 4.16KV Bus 2A3 - 2AB Tie EXAMINERS CUE: _ _ UNSAT COMMENTS:

STEP 7(6.2.3.B.4) REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR CRITICAL to starting the 2C CCW Pump on the 2B CCW Header STEP

_ _ SAT STANDARD: CLOSE Brk 2-20409 2B3 - 2AB Tie

_ _ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 6: (6.2.3.B.5) Start the 2C CCW pu~p~ ,1. 'f ! CRITICAL STEP STANDARD: START 2C CCW pump _ _ SAT EXAMINERS CUE:

_ _ UNSAT COMMENTS:

JPM NRC S-7 Rev 0 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (6.2.3.B.6) VERIFY the pressures and flows return to normal

_ _ SAT STANDARD: VERIFY the annunciators associated with CCW flows and pressures are _ _ UNSAT clear and indications return to normal.

EXAMINERS CUE:

COMMENTS:

CRITICAL STEP 8: (6.2.3.B.7) Place the 2B CCW pump control switch in the PULL TO LOCK position STEP

_ _ SAT STANDARD: PLACES control switch in PULL TO LOCK.

_ _ UNSAT EXAMINERS CUE: Inform the Candidate JPM is complete if Candidate continues with remainder of AS electrical lineup.

COMMENTS:

STOP TIME: _ _ _ __

JPM NRC S-7 Rev 0 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The Unit is at 100% power. The 2B CCW pump has tripped and cannot be started. The 2C CCW pump is available to be aligned and started on the 2B CCW header.

INITIATING CUES:

The US directs you to align and start the 2C CCW on the 2B header in accordance with 2-0310030 COMPONENT COOLING WATER OFF-NORMAL OP.ERATION.

9 of 10

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET

1. IC #1
2. Ensure AB 4.16KV bus aligned to A side
3. Ensure 2C CCW pump aligned to A side
4. Stop (do not place in pull to lock) 2B CCW pump 10 of 10