Withdrawal of Relief Request SPT-006, Use of Code Case N-731 for the Fourth Interval ISI Program
ML090771305
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/17/2009
From: Price J
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0595C
Download: ML090771305 (2)


Text

10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 17, 2009 U.S. Nuclear Regulatory Commission Serial No. 08-0595C Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket No. 50-338 License No. NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNIT 1 WITHDRAWAL OF RELIEF REQUEST SPT-006. USE OF CODE CASE N-731 FOR THE FOURTH INTERVAL lSI PROGRAM In a letter dated October 17, 2008 (Serial No. 08-0595), Dominion submitted the North Anna Power Station Unit 1 Inservice Inspection (lSI) Program for the fourth inservice inspection (lSI) interval applicable to Class 1, 2, and 3 components and component supports. The lSI Program described the programmatic aspects of lSI examinations of components and component supports. Included with the program were requests for alternatives or relief from the specific code requirements in accordance with 10 CFR 50.55a.

In a March 3, 2009 phone call with the NRC staff, the application of Code Case N-731 was discussed. During the call, the NRC stated that Code Case N-731 was included in the latest Draft of Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," and should be approved for use prior to Dominion's performance of the subject pressure test. Therefore, Dominion is hereby withdrawing Relief Request SPT-006, which addressed the use of the same code case.

If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerely, n Price President - Nuclear Engineering Commitments made in this letter:

1. None

Serial No. 08-595C Docket No. 50-338 Fourth Interval lSI Plan-Withdrawal SPT-006 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Ms. D. N. Wright NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mai I Stop 0-8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Mr. J. F. Stang, Jr.

NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852