ML090710366

From kanterella
Jump to navigation Jump to search
Submittal of Vnc Revised Site Security Plan
ML090710366
Person / Time
Site: Vallecitos Nuclear Center, 07000754
Issue date: 03/09/2009
From: Doreen Turner
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML090710366 (1)


Text

Safeguards Information GE-Hitachi HITACHI Nuclear Energy David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T 925 862 4344 One White Flint North F 910 341 2577 11555 Rockville Pike davidw.turner@ge.com Rockville, Maryland 20852-2738 50.73 Att: Document Control Desk "70 7S4 9 March 2009

Subject:

VNC submission of revised Site Security Plan

Enclosure:

VNC Site Security Plan, 16 March 2009 (Safeguards Information)

This letter is to inform the NRC of a change to the VNC Site Physical Security Plan in accordance with 10 CFR 50.54. VNC considers this change to "not reduce the effectiveness of the security program."

Attached is the revised Security Plan for GE-Hitachi Nuclear Energy Americas, LLC's (GE-H) Vallecitos Nuclear Center (VNC). This is a revision of the plan currently in effect at VNC, including the Nuclear Test Reactor (NTR) license R-33, Docket 50-73. This change will be effective 16 March 2009.

The previously communicated implementation schedule is unaffected by this modification.

Sinerel, Manager Vallecitos Nuclear Center CC:

Steve Pierce, NRR John Buckley Bob Evans, USNRC Region IV Mary Adams, NMSS WARNING: Violation as Section 147 of the Atomic Energy Act, "Safeguards information" is subject to Civil and Criminal Penalties When separated from the enclosure, this cover letter may be controlled as non-sensitive information GE-Htec Safguads Ifor NcCeo~Eeety atio Ae~ics. Fiecoy DT-let-O GE-Hitachi Nuclear Energy Americas, LLC Safeguards information File copy DWT-2009-01