GG-2009-03 - Draft Operating Test Comments
ML090700401
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/11/2009
From: Apger G
Operations Branch IV
To: Douet J
Entergy Operations
References
50-416/09-301
Download: ML090700401 (3)


Text

GG-2009-03 DRAFT OPERATING TEST COMMENTS ADMIN JPMS

4. Job Content
1. 2. 3. Attributes 6.

Errors 5.

JPM# Dyn LOD Explanation U/E/S (D/S) (1-5) IC Cues Critical Scope Over- Job- Minutia (See below for instructions)

Focus Steps (N/B) lap Link RO (A1) Due to the level of rework required and the timing of the return of the draft operating exam, all admin, simulator and in-plant JPMs were commented on during validation. All feedback was incorporated into the final walk through examination.

RO (A2)

RO (A3)

RO (A4)

SRO (A4)

SRO (A5)

SRO (A6)

SRO (A7)

SRO (A8)

Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:
  • The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
  • The JPM does not contain sufficient cues that are objective (not leading).
  • All critical steps (elements) have not been properly identified.
  • Scope of the task is either too narrow (N) or too broad (B).
  • Excessive overlap with other part of operating test or written examination.
4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 1 of 3 OBDI 202 - IOLE Process

GG-2009-03 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS

4. Job Content
1. 2. 3. Attributes 6.

Errors 5.

JPM# Dyn LOD Explanation U/E/S (D/S) (1-5) IC Cues Critical Scope Over- Job- Minutia (See below for instructions)

Focus Steps (N/B) lap Link C1 See comment above C2 S1 S2 S3 S4 S5 S6 P1 P2 P3 Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:

$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.

$ The JPM does not contain sufficient cues that are objective (not leading).

$ All critical steps (elements) have not been properly identified.

$ Scope of the task is either too narrow (N) or too broad (B).

$ Excessive overlap with other part of operating test or written examination.

4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 2 of 3 OBDI 202 - IOLE Process

GG-2009-03 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario 1. 2. 3. 4. 5. 6. 7. 8. 9.

10. Explanation (See below for instructions)

Set ES TS Crit IC Pred TL L/C Eff U/E/S 5 EVENT 1: Need to place more detail into the D.2 EVENT 2: Is there any action associated with this? If so, then details. If not, this will not be applicable to the RO.

EVENT 3: Actions associated with securing HPCS need to be addressed.

EVENT 4: If LPCI B and C are available for injection without operator action, then this is not a critical step to start LPCS. What is the drop dead level for ED: -190 or -212? The critical tasks are to ED(Open 7 SRVs) prior to TAF.

OVERALL: Events 5, 6 and 7 need to have associated D.2 actions.

10 EVENT 1: Need details on D.2 EVENT 3: More details in D.2 EVENT 4: More details in D.2. Need to identify this is a TS call on the D.1.

EVENT 5: More details in D.2 NRC NOTE: During validation week, a compromise in examination security was discovered for the scenarios. All of the submitted and NRC-developed scenarios were scrapped.

Two new scenarios were developed at the facility by the facility contractor and the NRC.

All comment resolution was performed following validation week on the two new scenarios.

Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. ES: ES-301 checklists 4, 5, & 6 satisfied.
2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
5. Pred: Scenario sequence and other factors avoid predictability issues.
6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
10. Provide a brief description of problem in the explanation column.
11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 3 of 3 OBDI 202 - IOLE Process