Annual Assessment Letter - Surry Power Station (NRC Inspection Report No. 05000280/2009001 and 05000281/2009001)
ML090630525
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2009
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-09-001
Download: ML090630525 (4)


See also: IR 05000280/2009001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

March 4, 2009

Mr. David A. Christian

President and Chief Nuclear Officer

Virginia Electric and Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION

(NRC INSPECTION REPORT NO. 05000280/2009001 AND 05000281/2009001)

Dear Mr. Christian:

On February 12, 2009, the NRC staff completed its performance review of the Surry Power

Station Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most

recent quarter and inspection results for the period from January 1 through December 31, 2008.

The purpose of this letter is to inform you of our assessment of your safety performance during

this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only--Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, Surry Power Station Units 1 and 2 operated in a manner that preserved public health

and safety, and fully met all cornerstone objectives. Plant performance for the most recent

quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee

Response column of the NRC=s Action Matrix, based on all inspection findings being classified

as having very low safety significance (Green) and all PIs indicating performance at a level

requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight

process (ROP) baseline inspections at your facility. We also plan on conducting special and

infrequently performed IPs which include: Operator Licensing Exams and Independent Spent

Fuel Storage Installation Operational Inspection.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of the inspectors

arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous

nature. The inspections in the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

VEPCO

2

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 404-562-4551 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Gerald J. McCoy, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos. 50-280, 50-281

License Nos: DPR-32, DPR-37

Enclosure: Surry Inspection/ Activity Plan (03/01/2009 - 06/30/2010)

cc w/encl: (See next page)

_________________________

x SUNSI REVIEW COMPLETE

OFFICE

RII::DRP

RII:DRP

SIGNATURE

/RA/

/RA/

NAME

JDodson

GMcCoy

DATE

3/4/09

3/4/09

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

VEPCO

3

cc w/encl:

Gerald T. Bischof

Site Vice President

Surry Power Station

Virginia Electric and Power Company

Electronic Mail Distribution

Sonny Stanley

Director, Nuclear Safety and Licensing

Virginia Electric and Power Company

Electronic Mail Distribution

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Chris L. Funderburk

Director, Nuclear Licensing & Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

Virginia State Corporation Commission

Division of Energy Regulation

P.O. Box 1197

Richmond, VA 23209

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Senior Resident Inspector

Surry Power Station

U.S. Nuclear Regulatory Commission

5850 Hog Island Rd

Surry, VA 23883

Michael M. Cline

Director

Virginia Department of Emergency Services Management

Electronic Mail Distribution

VEPCO

4

Distribution w/encl:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS (Linda Slack)

OE Mail (email address if applicable)

RIDSNRRDIRS

PUBLIC

S. P. Lingam, NRR