ML090550137

From kanterella
Jump to navigation Jump to search
Notification of Inspection and Request for Information for River Bend IR 05000478-09-003)
ML090550137
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/24/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Mike Perito
Entergy Operations
References
IR-09-003
Download: ML090550137 (6)


See also: IR 05000478/2009003

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

February 24, 2009

Michael Perito

Vice President, Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000458/2009003) AND REQUEST FOR

INFORMATION

Dear Mr. Perito:

From April 27 to May 8, 2009, Reactor Inspectors from NRCs Region IV office will perform the

baseline inspection of changes, tests, experiments, and permanent plant modifications at River

Bend Station, using NRC Inspection Procedure 71111.17, Evaluations of Changes, Tests,

Experiments, and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Kristi Huffstatler of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector Wayne Sifre at 817-860-8193 or by email (Wayne.Sifre@nrc.gov).

Entergy Operations, Inc. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-458

License: NPF-47

Enclosure:

Evaluations of Changes, Tests, or Experiments and

Permanent Plant Modifications Document Request

cc:

Senior Vice President

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and COO

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Entergy Operations, Inc. -3-

Attorney General

State of Louisiana

P. O. Box 94005

Baton Rouge, LA 70804-9005

Ms. H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, LA 70806

President of West Feliciana

Police Jury

P. O. Box 1921

St. Francisville, LA 70775

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P. O. Box 13326

Austin, TX 78701-3326

Mr. Jim Calloway

Public Utility

Commission of Texas

1701 N. Congress Avenue

Austin, TX 78711-3326

Louisiana Department of Environmental Quality

Radiological Emergency Planning and

Response Division

P. O. Box 4312

Baton Rouge, LA 70821-4312

Associate General Counsel

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Chief, Technological Services

Branch

FEMA Region VI

800 N. Loop 288

Denton, TX 76201-3698

President of West Feliciana

Police Jury

P.O. Box1921

St. Francisville, LA 70775

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Resident Inspector (Charles.Norton@nrc.gov )

Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov )

RBS Site Secretary (Lisa.Day@nrc.gov )

Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)

OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)

ROPreports

File located: ML090550137

SUNSI Rev Compl. x Yes No ADAMS x Yes No Reviewer Initials TRF

Publicly Avail x Yes No Sensitive Yes x No Sens. Type Initials TRF

WSifre:EB1 TFarnholtz

e-mail /RA/

2/23/09 2/24/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: April 27 - May 8, 2009

Inspection Procedures: Inspection Procedure (IP) 71111.17, Evaluation of Changes,

Tests, or Experiments and Permanent Plant Modifications

Inspectors: W. Sifre, Senior Reactor Inspector, Lead Inspector

G. George, Reactor Inspector

I. Anchondo, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec database preferred), in care of W. Sifre, by April 6, 2009, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspectors, and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since

April 20, 2007, which did not result in an evaluation. Note: Description of screenings

should be brief, but of sufficient detail so that inspectors can determine the significance

of the issue.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result

in an application for license amendment to NRC from April 20, 2007, to the present.

Please ensure that descriptions for these of evaluations should be brief, but of sufficient

detail so that inspectors can determine the significance of the issue.

3. River Bend Station procedure(s) for conducting 10 CFR 50.59 screenings and

evaluations.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

activities, including screenings and evaluations from April 20, 2007, to the present.

5. A list with descriptions of all permanent plant modifications dating from April 20, 2007.

Include sufficient detail to enable the inspector to determine the significance of each

modification. For this inspection, permanent plant modifications include permanent plant

changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

6. River Bend Station procedure for implementing and controlling permanent plant

modifications.

-1- Enclosure

7. A list with descriptions of all corrective action documents related to your permanent

plant modification program and its implementation since April 20, 2007. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,

including qualification dates.

9. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

W. Sifre G. George I. Anchondo

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-860-8193 817-276-6562 817-860-8152

wayne.sifre@nrc.gov gerond.george@nrc.gov isaac.anchondo@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Wayne Sifre

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125

-2- Enclosure