MONTHYEARML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21302A1252021-10-29029 October 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action RTS Power Range Amendment ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0152021-09-0202 September 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Change in the Maximum Surveillance Intervals from 24 Months to 30 Months ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21133A2502021-05-13013 May 2021 NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition ML20254A1162020-09-0909 September 2020 Draft License Transmittal E-Mail ML20223A0632020-08-10010 August 2020 Email Shpo Comment Letter: Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20163A4282020-06-10010 June 2020 Email from MPCA Comment Letter - Prairie Island ISFSI ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20112F4582020-04-21021 April 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Low Temperature Overpressure Protection ML20083F4202020-03-20020 March 2020 NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20052C7582020-02-21021 February 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Westinghouse NSAL-09-05 and NSAL-09-05 ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20022A1762020-01-22022 January 2020 NRR E-mail Capture - Prairie Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements ML20021A1832020-01-21021 January 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML19316A0172019-11-0101 November 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Integrated Leak Rate Test Extension Request ML19253B9642019-09-10010 September 2019 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Relief Request Adoption of Code Case N-786-3 ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19193A0142019-07-0909 July 2019 NRR E-mail Capture - Acceptance of Prairie Island Nuclear Generating Plant, Units 1 and 2 Relief Request Nos. 1-RR-5-10 and 2-RR-5-10 Related to Reactor Vessel Inspection Intervals) ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML19057A4212019-02-26026 February 2019 NRR E-mail Capture - Acceptance of Prairie Island Reactor Vessel Capsule Removal Schedule Request ML19008A3562019-01-0707 January 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant - Audit Plan Related to the License Amendment Request to Implement 10 CFR 50.69 ML18351A0142018-12-14014 December 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Classification of Certain Fuel Handling Equipment ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18233A3692018-08-21021 August 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Adoption of 10 CFR 50.69 ML18201A4132018-07-20020 July 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-439 ML18159A3052018-06-0808 June 2018 NRR E-mail Capture - Monticello - Acceptance of Requested Relief Request RR-012: Lnservice Inspection Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval ML18113A2252018-04-23023 April 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-425 2023-09-05
[Table view] |
Text
PrairieIslandNPEm Resource From: Richard Plasse Sent: Monday, February 23, 2009 8:00 AM To: Vincent, Robert; Eckholt, Gene F.
Subject:
Followup RAI Attachments: PINGP RAI AMR#2 LETTER.doc 1
Hearing Identifier: Prairie_Island_NonPublic Email Number: 743 Mail Envelope Properties (Richard.Plasse@nrc.gov20090223080000)
Subject:
Followup RAI Sent Date: 2/23/2009 8:00:00 AM Received Date: 2/23/2009 8:00:00 AM From: Richard Plasse Created By: Richard.Plasse@nrc.gov Recipients:
"Vincent, Robert" <Robert.Vincent@xenuclear.com>
Tracking Status: None "Eckholt, Gene F." <Gene.Eckholt@xenuclear.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3 2/23/2009 8:00:00 AM PINGP RAI AMR#2 LETTER.doc 99950 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
February 20, 2009 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant, Units 1 and 2 Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 & 2, LICENSE RENEWAL APPLICATION (TAC Nos. MD8513 AND MD8514)
Dear Mr. Wadley:
By letter dated April 11, 2008, Nuclear Management Company, LLC (NMC), now known as Northern States Power Company, Minnesota (NSPM), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew the operating license for Prairie Island Nuclear Generating Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Gene Eckholt, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1427 or e-mail Richard.Plasse@nrc.gov.
Sincerely,
/RA/
Richard Plasse, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
As stated cc w/encl: See next page
February 20, 2009 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant, Units 1 and 2 Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 & 2, LICENSE RENEWAL APPLICATION (TAC Nos. MD8513 AND MD8514)
Dear Mr. Wadley:
By letter dated April 11, 2008, Nuclear Management Company, LLC (NMC), now known as Northern States Power Company, Minnesota (NSPM), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew the operating license for Prairie Island Nuclear Generating Plant, Units 1 and 2 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Gene Eckholt, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1427 or e-mail Richard.Plasse@nrc.gov.
Sincerely,
/RA/
Richard Plasse, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
As stated cc w/encl: See next page ADAMs Accession Number: ML090340684 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa RAPlasse DWrona DATE 02/4/09 02/18/09 02/20/09 OFFICIAL RECORD COPY
Letter to M. Wadley from R. Plasse, dated February 20, 2009 DISTRIBUTION:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 & 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD8513 AND MD8514)
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource T. Combs, OCA T. Madden, OCA R. Shane, OCA B. Keeling, OCA RidsNrrDlrRebb Resource RidsNrrDlrReba Resource R. Plasse T. Wengert N. Goodman R. Skokowski K. Stoedter P. Zurawski RidsOpaMail Resource I. Couret, OPA V. Mitlyng B. Mizuno, OGC RidsOGCMailRoom Resource DLR/REBB
Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
Peter M. Glass Dennis L. Koehl Assistant General Counsel Chief Nuclear Officer Xcel Energy Services, Inc. Northern States Power Company, 414 Nicollet Mall (MP4) Minnesota Minneapolis, MN 55401 414 Nicollet Mall (MP4)
Minneapolis, MN 55401 Manager, Regulatory Affairs Prairie Island Nuclear Generating Plant Joel P. Sorenson Northern States Power Company, Director, Site Operations Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Northern States Power Company, Welch, MN 55089 Minnesota 1717 Wakonade Drive East Manager - Environmental Protection Welch, MN 55089 Division Minnesota Attorney General=s Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East Welch, MN 55089-9642 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Tribal Council Prairie Island Indian Community ATTN: Environmental Department 5636 Sturgeon Lake Road Welch, MN 55089 Charles R. Bomberger Vice President Nuclear Projects 414 Nicollet Mall, (MP4)
Minneapolis, MN 55401
Request for Additional Information (RAI) 4.3.1-1 The Prairie Island Nuclear Generating Plant (PINGP) metal fatigue of reactor coolant pressure boundary management program relies on transient cycle monitoring to evaluate the fatigue usage described in the license renewal application. This approach tracks the number of occurrences of significant thermal and pressure transients (significant events) and compares the cumulative cycles, projected to cover the renewal period, against the number of design cycles specified in the design specifications. The projected cycles are then used to evaluate the total cumulative usage factor (CUF) which covers the period of extended operation. For this approach to work, none of the significant events tracked should produce stresses greater than those that would be produced by the design transients. That is, the P-T (Pressure and Temperature) characteristics, including their values, ranges, and rates, all must be bounded within those defined in the design specifications.
(a) Please describe the procedures that PINGP has been using for tracking thermal activities so the staff can confirm that the PINGP aging management program will ensure that P-T characteristics, including their values, ranges, and rates remain bounded within the range defined in the design specifications during the renewed license term.
(b) Please provide a histogram (cycle accumulating charts) of heatup transient history, and a histogram for the cooldown transient as well.
RAI 3.3.2.9-2 In License Renewal Application (LRA) Table 3.3.2-9, page 3.3-198, 199 and 200, fire protection system, for copper alloy heat exchanger components and heat exchanger tubes in an internal environment of raw water, PINGP has credited the Fire Water System Program to manage the aging effects loss of material and heat transfer degradation. These lines reference footnote E, and NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Revision 1, item VII.C1-3.
The GALL Report item recommends AMP XI.M20, Open-Cycle Cooling Water Program to manage these aging effects for heat exchangers. The GALL AMP recommends chemical treatment whenever the potential for biofouling species exists as part of the preventive actions and a test program to verify heat transfer capabilities.
Please justify why Open-Cycle Cooling Water System Program is not used.
ENCLOSURE