ML090401023

From kanterella
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination 05000483-09-301
ML090401023
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/09/2009
From: Ryan Lantz
Operations Branch IV
To: Heflin A
AmerenUE
References
50-483/09-301
Download: ML090401023 (5)


See also: IR 05000483/2009301

Text

February 9, 2009

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

AmerenUE

P. O. Box 620

Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000483/2009301

Dear Mr. Heflin:

In a telephone conversation on January 22, 2009 between Messrs. Rick Tiefenauer, Initial

License Class Lead, Larry Wilhelm, Initial License Instructor, and Gabriel Apger, Chief

Examiner, arrangements were made for the administration of licensing examinations at Callaway

during the week of June 22, 2009.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 3, 2009. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by April 24, 2009. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition,

your support for on-site validation of the examinations is required during the week of May 11,

2009.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

AmerenUE

- 2 -

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the

applications are not received at least 30 days before the examination date, a postponement may

be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Tiefenauer has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Apger at 817-276-6508 or myself at

817-860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

AmerenUE

- 3 -

Docket: 50-483

License: NPF-30

DISTRIBUTION:

John ONeill, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N. Street, N.W.

Washington, DC 20037

Mr. Scott A. Maglio, Assistant Manager

Regulatory Affairs

AmerenUE

P. O. Box 620

Fulton, MO 65251

Mr. Tom Elwood, Supervising Engineer

Regulatory Affairs and Licensing

AmerenUE

P. O. Box 620

Fulton, MO 65251

Missouri Public Service Commission

Governor Office Building

200 Madison Street

P.O. Box 360

Jefferson City, MO 65102-0360

Mr. Rick A. Muench, President and

Chief Executive officer

Wolf Creek Nuclear Operating Corporation

P. O. Box 411

Burlington, KS 66839

Kathleen Logan Smith, Executive Director and

Kay Drey, Representative, Board of Directors

Missouri Coalition for the Environment

6267 Delmar Boulevard, Suite 2E

St. Louis City, MO 63130

Mr. Lee Fritz, Presiding Commissioner

Callaway County Courthouse

10 East Fifth Street

Fulton, MO 65251

AmerenUE

- 4 -

Mr. Les H. Kanuckel, Manager

Quality Assurance

AmerenUE

P. O. Box 620

Fulton, MO 65251

Director, Missouri State Emergency

Management Agency

P. O. Box 116

Jefferson City, MO 65102-0116

Mr. Scott Clardy, Director

Section for Environmental Public Health

Missouri Department of Health and

Senior Services

930 Wildwood Drive

P. O. Box 570

Jefferson City, MO 65102-0570

Mr. Scott Sandbothe, Manager

Regulatory Affairs

AmerenUE

P. O. Box 620

Fulton, MO 65251

Certrec Corporation

4200 South Hulen, Suite 422

Fort Worth, TX 76109

Mr. Keith G. Henke, Planner II

Division of Community and Public Health

Office of Emergency Coordination

Missouri Department of Health and

Senior Services

930 Wildwood Drive

P.O. Box 570

Jefferson City, MO 65102

Technical Services Branch Chief

FEMA Region VII

2323 Grand Boulevard, Suite 900

Kansas City, MO 64108-2670

AmerenUE

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (David.Dumbacher@nrc.gov)

Resident Inspector (Jeremy.Groom@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

CWY Site Secretary (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

File located: S:\\DRS\\OB\\OB-Only\\EXAMS\\CW\\CW-2009-06-INIT EXAM\\CW-2009-06-PUBLIC

FORMS\\CW-2009-06-Corporate Notification Letter.doc

ADAMS: MLxxxxxxxxx

SUNSI Rev Compl.

Yes No

ADAMS

Yes No

Reviewer Initials

GWA

Publicly Avail

Yes No

Sensitive

Yes No

Sens. Type Initials

GWA

OE:OB

C:OB

GWApger

RELantz

/RA/

/RA/ BS

1/22/09

2/9/09

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax