ML090370623

From kanterella
Jump to navigation Jump to search
Day Post-Outage Structural Weld Overlay Report
ML090370623
Person / Time
Site: Saint Lucie 
Issue date: 01/20/2009
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2009-019
Download: ML090370623 (24)


Text

0FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 January 20, 2009 L-2009-019 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Unit 1 Docket No. 50-335 60-Day Post-Outage Structural Weld Overlay Report Via Florida Power and Light letter L-2008-098 dated April 29, 2008, FPL committed to provide to the NRC a summary of the design analysis and non-destructive examination results for the St.

Lucie Unit 1 hot leg nozzle weld overlay repairs performed during the Fall SL1-22 Refueling Outage. contains the requested information.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant Enclosure ESK/KWF AOCP7 d 02N an FPL Group company